ML19326A068

From kanterella
Jump to navigation Jump to search
Forwards LER 78-083/03L-0
Date released: 12/06/2019 Download: ML19326A068


LER 78-083/03L-0:on 780720,containment vessel-to-annulus Differential Pressure Exceeded Tech Spec Limit.Caused by Personnel & Procedural Error.Rate of Pressure Increase Too Great for Shift Check Monitoring.St 5099.01 Modified
ML19326A072
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1978
From: Fulmer S
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19326A072 (3)
Forwards LER 78-083/03L-0
ML19326A067
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1978
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19326A067 (1)