ML19326A058

From kanterella
Jump to navigation Jump to search
Forwards LER 78-082/03L-0
Date released: 12/06/2019 Download: ML19326A058


LER 78-082/03L-0:on 780722,surveillance Testing on Personnel Airlock Not Performed within Required 72-h.Caused by Procedure Scheduling Deficiency.Test Not Adaptable to 7-day Schedule.Airlock Tested as Required
ML19326A060
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1978
From: Tabbert J, Zell J
TOLEDO EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19326A060 (2)
Forwards LER 78-082/03L-0
ML19326A057
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 08/15/1978
From: Murray T
TOLEDO EDISON CO.
To: KEPPLER J G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
Download: ML19326A057 (1)