MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] Category:TEXT-LICENSE APPLICATIONS & PERMITS
MONTHYEARULNRC-04103, Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents1999-09-0808 September 1999 Application for Amend to License NPF-30,reflecting USQ Associated with Increases to Offsite Dose Consequences Reported in FSAR for SGTR & MSLB Accidents ULNRC-04024, Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr1999-04-30030 April 1999 Suppl 1 to Application to License NPF-30,adding License Conditions to Address Surveillance Requirements as Described in Ltr ULNRC-03910, Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld1998-10-27027 October 1998 Application for Amend to License NPF-30,updating Request to Allow Use of Electrosleeves on Two Cycle Basis.Proprietary & non-proprietary Version of 51-5001925-01,encl.Proprietary Rev 3 to TR BAW-10219P Also Encl.Proprietary Info Withheld ULNRC-03902, Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.21998-09-29029 September 1998 Application for Amend to License NPF-30,revising ESFAS Functional Unit 6.f Re Loss of Offsite power-start Turbine Driven Pump in TS Tables 3.3-3,3.3-4 & 4.3.2 ULNRC-03873, Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr1998-07-30030 July 1998 Application for Amend to License NPF-30,revising TS Table 4.3-2 by Adding Table Notation to Clarify That Verification of Time Delays Associated W/Esfas Functional Units 8.a & 8.b Is Only Performed as Part of Channel Calibr ULNRC-03854, Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines1998-06-29029 June 1998 Application for Amend to License NPF-30,revising TS 3.7.1.7 Re SG Atmospheric Steam Dump Lines ML20216F3731998-03-0909 March 1998 Application for Amend to License NPF-30,revising TS SR 3/4.5.2b.1 by Adding Clarification in Regard to Venting & ECCS Pump Casings & Accessible Discharge Piping High Points ML20198P3321997-10-31031 October 1997 Application for Amend to License NPF-30,reducing Repeated Alarms,Rod Blocks & Partial Reactor Trips That Continue to Manifest,During Beginning of Cycle Operation Following Refueling Outages ML20198P4081997-10-31031 October 1997 Application for Amend to License NPF-30,revising Tech Specs Tables 3.3-3,3.3-4 & 4.3-2 Re ESFAS Functional Unit 6.f, Loss of Offsite Power-Start Turbine-Driven Pump ML20217K2281997-10-17017 October 1997 Application for Amend to License NPF-30,revising TS 3/4.4.9, Pressure/Temperature Limits. Westinghouse Repts WCAP-14894,WCAP-14896 & WCAP-14895 Encl W/Application.Review & Approval of Amend Application Requested by 970301 ULNRC-03627, Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer1997-08-0808 August 1997 Application for Amend to License NPF-30,revising TS Table 3.7-2 Specifying That Lift Setting Tolerance for Main Steam Line Safety Valves Is +3/-1% as-found & +1% as-left.Table 2.2-1 Revised by Reducing Sensor Error for Pressurizer ULNRC-03628, Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Feedwater Isolation ESFAS Functions in TS Tables 3.3-3,3.3-4 & 4.3-2 as Listed ULNRC-03626, Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.7.4, Essential Svc Water Sys, by Removing Requirement to Perform SRs 4.7.4.b.1,4.7.4.b.2 & 4.7.4.c During Shutdown ULNRC-03625, Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays1997-08-0808 August 1997 Application for Amend to License NPF-30,revising Tech Spec 3/4.3 Re Instrumentation & Changing Slave Relay Quarterly Surveillance to Quarterly Actuation Logic Test for Ms & FW Isolation Sys Actuation & Relays ML20148C4541997-05-15015 May 1997 Application for Amend to License NPF-30,adding License Condition to Address Surveillance Requirements Not Previously Performed by Existing Requirements or Tests ML20138B7301997-04-24024 April 1997 Application for Amend to License NPF-30,revising Title Senior Vice President,Nuclear to Vice President & Chief Nuclear Officer, Due to Retirement on 970430 & Replacement by GL Randolph on 970501 ML20137N6031997-04-0101 April 1997 Application for Amend to License NPF-30,requesting Rev to TS Table 3.3-3 Re Engineered Safety Features Actuation Sys Instrumentation ULNRC-03402, Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys1996-07-18018 July 1996 Application for Amend to License NPF-30,changing TS 3/4.7.7,3/4.9.13 & Corresponding Bases Re Charcoal Test Methodology for Emergency Exhaust Sys ML20112E8731996-05-29029 May 1996 Application for Amend to License NPF-30,modifying Pneumatic Valve Control Configuration for Main Feedwater Control & Bypass Valves & Reflecting Unreviewed Safety Question Associated W/Mod ML20107M4401996-04-24024 April 1996 Application for Amend to License NPF-30,transferring License to Reflect Licensee as wholly-owned Operating Subsidiary of Ameren ML20107H3551996-04-17017 April 1996 Application for Amend to License NPF-30,adding Ms & FW Isolation Sys Actuation Logic & Relays to Functional Units 4.b & 5.a of Tables 3.3-3,3.3-4 & 4.3-2.Revise Table 3.3-3 by Adding Action Statements 27a & 34a ML20107E3171996-04-12012 April 1996 Application for Amend to License NPF-30,revising TS 3/4.4.5, SGs & 3.4.6.2, Operational Leakage & Associated Bases to Address Installation of Laser Welded Tube Sleeves in Plant Sgs.Supporting Proprietary TR Encl.Proprietary TR Withheld ML20107F0421996-04-12012 April 1996 Application for Amend to License NPF-30,changing TS 3/4.4, RCS & Associated Bases to Address Installation of Electrosleeves in Callaway Plant Sgs.Info Re Installation Process in TR BAW-10219P,Rev 1 Dtd Mar 1996 Withheld ULNRC-03349, Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled1996-03-22022 March 1996 Application for Amend to License NPF-30,implementing Containment Integrated Leakage Rate Program That Would Allow Ilrt,Presently Scheduled for Refuel 8,to Be Rescheduled ML20106G4091996-02-23023 February 1996 Application for Amend to License NPF-30,reflecting Union Electric as Wholly Owned Subsidiary of Ameren Corp ML20097D5681996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Change to TS 5.3.1,to Allow Use of Alternate Zirconium Based Fuel Cladding Material ML20097D6021996-02-0909 February 1996 Application for Amend to License NPF-30,proposing Changes to TS 4.6.1.2.a & Bases Re Containment Systems ML20097F8891996-02-0909 February 1996 Application for Amend to License NPF-30,revising TS 4.6.1.2.a Re Containment Sys ML20096B1811996-01-0202 January 1996 Application for Amend to License NPF-30,revising TS 3.9.4, Containment Bldg Penetrations & Associated Bases Section to Allow Containment Personnel Airlock Doors to Be Open During Core Alterations ULNRC-03264, Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl1995-09-0606 September 1995 Application for Amend to License NPF-30,revising TS Sections 5.3.1 & 5.6.1.1 & Figure 3.9-1 Re Spent Fuel Pool Storage. Rev 0 of Rept LFNF-95-02, Callaway Plant Region 1 Spent Fuel Rack Criticality Analysis Encl ULNRC-03244, Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 31995-07-25025 July 1995 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in EDG Reliability & Availability Based Upon,In Part,Guidance of GLs 94-01,93-05 & Reg Guide 1.9,Rev 3 ML20086B7411995-06-26026 June 1995 Application for Amend to License NPF-30 Removing List of Containment Isolation Valves,Revising Allowed Outage Time for Component Cw Motor Operated Containment Penetration Check Valves as Isolation Devices ULNRC-03230, Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation1995-06-23023 June 1995 Application for Amend to License NPF-30.Amend Would Revise TSs to Implement Recommendations of GL 93-05 Re Reduction of SRs for Testing During Power Operation ML20082S7701995-04-26026 April 1995 Application for Amend to License NPF-30.Amend Would Change Surveillance Requirements of TS 3/4.7.6,reducing Upper Limit on Flow Rate Through CR Filtration Subsystem ULNRC-03198, Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles1995-04-17017 April 1995 Application for Amend to License NPF-30,changing Table 2.2-1 of TS 2.2.1 to Reduce Repeated Alarms & Partial Reactor Trips Associated w/C-4 Control Sys Interlock & Overpower Delta-T,which Occurred in Past Cycles ULNRC-03184, Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements1995-03-29029 March 1995 Application for Amend to License NPF-30,responding to Concerns Raised by NRC Staff During Review of Final Policy Statement on TS Improvements ULNRC-03151, Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys1995-02-24024 February 1995 Application for Amend to License NPF-30,revising TS 4.6.1.7.4 & Associated Bases Re Containment Ventilation Sys ML20078A4731995-01-13013 January 1995 Application for Amend to License NPF-30 for Callaway Plant. Amend Would Relocate TS 3.3-2, Reactor Trip Sys Instrumentation Response Times ML20080C7531994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS 4.3.2.2, 4.7.1.2.1 & Bases for Spec 3/4.7.1.2 for Afs ML20078P7001994-12-0909 December 1994 Application for Amend to License NPF-30,revising TS Surveillance Requirement 4.8.1.1.2f.7 to Remove Requirement to Perform Hot Restart within 5 Min of Completing 24 H Test & Place Requirement in Separate TS ML20077F2311994-12-0909 December 1994 Application for Amend to License NPF-30,requesting Exemption to 10CFR50,App J,Section III.D.1(a) & Rev to TS SR 4.6.1.2.a & Associated Bases to Defer Next Scheduled Containment ILRT for One Outage,From Refuel 7 to Refuel 8 ML20073A6091994-09-12012 September 1994 Application for Amend to License NPF-30,revising Tech Specs Table 3.7.1 Re Limit Max Allowable Power Levels W/Inoperable Main Steam Line Safety Valves ML20072T3421994-09-0909 September 1994 Application for Amend to License NPF-30,revising TS 3/4.8.1 & Associated Bases to Achieve Overall Improvement in Emergency Diesel Generator Reliability & Availability ML20073A6841994-09-0909 September 1994 Application for Amend to License NPF-30,revising Tech Specs 3/4.8.2.1,3/4.8.2.2,3/4.8.3.1 & 3/4.8.3.2 Re Electrical Power Sys Dc Sources & Onsite Power Distribution ML20072U4381994-09-0808 September 1994 Application for Amend to License NPF-30,revising TS 4.2.2.2, 4.2.2.4 & 6.9.19 to Incorporate Penalty in COLR to Account for Fq Increases Greater That 2% Between Measurements ML20072U7551994-09-0808 September 1994 Application for Amend to License NPF-30,reflecting Unreviewed Safety Question Associated W/Use of Reactor Makeup Water to Rinse Items Removed from Refueling Pool & Spray Down Refueling Pool ML20072A9671994-08-0404 August 1994 Application for Amend to License NPF-30,replacing TS 3/4.6.2.2, Spray Additive Sys W/Spec 3/4.6.2.2 Entitled, Recirculation Fluid Ph Control (Rfpc) Sys, Supporting Passive Rfpc Sys Consisting of Stainless Steel Baskets ML20072A0761994-08-0404 August 1994 Application for Amend to License NPF-30,revising TS to Reflect Changes in Boron Dilution Accident Analysis to Address Boron Dilution Mitigation Sys (Bdms) Time Delays & Bdms Actuation Setpoint Uncertainty ML20070A7931994-06-21021 June 1994 Application for Amend to License NPF-30,deleting TS Sections Describing On-Site Review Committee & Nuclear Safety Review Board ML20069D7321994-05-20020 May 1994 Application for Amend to License NPF-30,modifying TSs to Incorporate Improvements in Scope & Content Endorsed by NRC in Final Policy Statement on TS Improvements for Nuclear Power reactors,58FR39132 1999-09-08
[Table view] |
Text
[O Ai .
- e' L . 1901 Chouteaa kenue thst Offite Box 149 V ..
UNION Etuernic November .14,1989
,a, $33 U. S. Nuclear Regulatory Commission-ATTN: Document Control Desk Mail Station F1-137
- Washington, D.C. 20555 4.
Gentlemen: ULNRC- 210 8 DOCKET NUMBER 50-483 .;
CALLAWAY PLANT DELETION-OF SUPERCEDED TRAINING REQUIREMENTS TECHNICAL SPECIFICATION 6.4.1 Union Electric Company herewith transmits an application for Amendment to Facility Operating License No. NPF-30 for the Callaway Plant.
This amendment request proposes to revise Technical Specification 6.4.1, Training, to delete !
the references to superceded requirements. When the I revised rule, Title 10, Code of Federal Regulations, Part 55, (10 CFR 55) on Operator's Licenses, was issued, it superceded all requirements current at the time and less restrictive than the new rule. ,
Based upon this and the guidance set forth in NUREG 1262, Answers to Questions at Public Meetings ,
Regarding Implementation of Title 10, CFR, Part 55 on Operator's Licenses, Union Electric proposes to delete references to the old rule; to the H. R.
Denton Letter dated March 28, 1980; and to sections l
A and C of the letter's Enclosure.
At the request of the NRC reviewers, Union !
Electric references section 6.2.2.g of the Callaway Technical Specifications and sections 13.1.3.1.5 and '
13.1.3.1.6 of the Final Safety Analysis Report to oL confirm that both Shift Supervisors and Operating Supervisors hold SRO licenses.
l The Callaway Plant On-Site Review Committee and L
the Nuclear Safety Review Board have reviewed and l approved this amendment request. Attachments 1,2, and 3 provide the Safety Evaluation, the Significant Hazard Evaluation, and the proposed Technical Specification change. A#l fff12 COO p
12891114 ADOCK 050004s3 j PDC
b >
, .. ac .
5 ',,.
r
.' ' ' A 'r ; it y
[ .,,.f.
. m
.pr,,.: (c.
- o. ,
. \' l L
[
s ., , +~- ,
5
'I i ti '
The ptoposed' amendment requent will be'
- implemented upon approval by the NRC, "
i a.. ;
.g ,
Very.truly yours3 7 .!
F i l a i, e
/ .,
onay . Schnell !,
i'.,, o DJwf3,3
i
'l r h f, Attachments: 1. - Safety Evaluation -
[,, 2. .
Significant Hazard' Evaluation .
! ,_ 3, Proposed Technical Specification ,.
b" Change !
h- !
Ni
.c
-)
[. '
j.
T g I
j ,
?- t
! I
[' l w a h
F. ,
- p. ai v,. I N. A
(
. ,m r
'tiliv
, j l
e t
j t
I I
2 l<. '1
! [I
~ ,
.:g _ ,)
I'
? u i
H, ,
j
- f. ;
)
STATE OF MISSOURI ) i
' '; ' ) SS l l CITY OF ST. LOUIS ) i r [
!. a. ;
l !
l.. 6 Alan C. Passwater, of lawful age, being first duly sworn :
.upon oath says that he is Manager, Licensing and ruels (Nuclear) for !
n > Union Electric Company; that he has read the foregoing document and L knows the content thereof; that he has executed the same for and on r behalf of said company with full power and authority to do so; and l
'that the facts therein^ stated are true and correct to the best of his !
knowledge, information and belief. [
By Alan C. Passwater ,
Manager, Licensing and Fuels !
Nuclear j SUBSCRIBED and sworn to before me this /M day of -/>~, 1989 f i
I h k
& FW !
UARBARA J. PFAFF i NOTARY PUBl10, $1AT( tw MISSOURI [
Mf COMMIS$10N EXPlRIS APRIL 22, 1993 l ST. LOUIS COUNTY !
.i
[
i t
i i
i 1
1 t
l I -
@ Il o
i- . ,
o cct Gerald-Charnoff, Esq. f Shaw, Pittman, Potts &'Trowbr!dge ;
ce 2300'N. Street, N.N. L washington, D.C. 20037 [
Dr. J. O. Cermak i CPA,<Inc.
4 Professional Drive (Suite 110) !
.Gaithersburg, MD 20879
R. C. Knop ,
E Chief, Reactor Project Branch 1 U.S. Nuclear Regulatory Commission l' Region III :
799 Roosevelt Road '
- Glen Ellyn,. Illinois 60137 I Bruce Little !
Callaway Resident Office }
U.S. Nuclear Regulatory Commission RR$1 j
Steedman, Missouri 65077 i Tom Alexion (2) [
Office of Nuclear Reactor Regulation j U.S. Nuclear Regulatory Commission i 1 White Flint, North, Mail Stop 13E21 f 11555 Rockville Pike l Rockville, MD 20852 !
Manager, Electric Department i Missouri Public Service Commission l P.O.' Box 360 Jefferson City, MO 65102 ;
{
Ron Kucera :
Department of Natural Resources ,
P.O. Box 176 i Jefferson City, MO 65102 ;
1 e
.i i
t W ^
.g. ' ' '
- v
- .,3 ,
j,*'t. a ,;
- T J beet'. D. Shafer/A160.761'
. . /QA Record ,(CA-758)"
Nuclear Date E210.01 DFS/ Chrono D. F. Schnell-J. E. Birk' .
J. V. Laux
.. M. A. Stiller G. L. Randolph R. J. Irwin . ,
o H. Wuertenbaecher W.lR.. Campbell
- - A. C. Passwater p'g R. P. Wendling D. E. Shafer D. J. Walker.
O. Maynard (WCHOC)
N. P. Goel (Bechtel)
T. P.'Sharkey NSRB (Sandra Auston)
' 1 E210.01 -
At 40. el* O2,(1072-)
k.
r i
4 g
1 y 4 , -- 4 ~ v~--- -, , ,w--,., , . ,,c- v -- e-w-n+,.- e . , m , - - - -.na.- .-v.- -- - - - , -
fW+ ,
p a ,
(, '
I- ttachment 1 !
DLNRC- 2108 I
L ,
t S afety_ _.Evaluati on T This Technical Specification change request revises Section 6.4.1, Training, by deleting.
references .tx> requirements which were superceded i upon the issuance of the revised' regulation Title 10, CFR, Part 55; the quidance of Regulatory Guide ..
D, 1.8, Revision 2, which endorses ANSI /ANS 3.1-1981; and the Operator Licensing Examiner Standards, NUREG-1021, ES-202. .
- r t
p The requirements of the~new' regulations and !
these documents are more restrictive than Sections
/
i A and C of Enclosure 1 of the March 28, 1980 NRC Denton Letter to all' licensees' .
j i
- This request'does not impact compononts, )
L systems, or plant equipment, but revises Sections of .
! the Technical Specifications by deleting outdated l[
re f e r'ence s . - i f
This change request does not adversely affect .l or endanger the health or the safety of the general 1 p public, nor involve an unreviewed safety question, j i
b !
L i r t e
?
h t
P i
l h
t 1
e-s Attachment 2
- ULNRC- 2108 I Significant_Hazerds Evaluati_oD i
, i The Commission has provided standards in :
10CFR50.92(c) for determining whether a significant ,
hazards consideration exists. A proposed amendment I to an operating License for a facility involves no significant hazards consideration if operation of the facility in accordance with the proposed l amendment would nots (1) involve a significant 1 increase in the probability or consequences of an accident previously evaluated, (2) create the :
possibility of a new or different kind of accident from any accident previously evaluated, or (3) .
I involve a significant reduction in a margin of safety. Union Electric has reviewed the proposed ,
change and determined that:
- 1. The proposed amendment does not involve a significant increase in the probability or ,
consoquences of an accident previously evaluated because the change merely deletes references to requirements superceded by the issuance of the revised '
regulation Title 10, CFR, Part 55; Regulatory Guide 1.8, Revision 2, and the ,
Operator Licensing Examiner Standards, i NUREG-1021,ES-202. The Union Electric Training Program remains in compliance sad the proposed change constitutes ar. ;
administrative revision. :
- 2. The proposed amendment does not create the possibility of h new or different kind of -
accident than previously evaluated because the proposed change is administrative in nature, and no physical alterations of plant configuration or changes to setpoints or operating parameters are proposed.
- 3. The proposed amendment involves an administrative type change and does not involve a significant roduction in a margin of safety.
Based on the above reasoning, Union Electric has determined that the proposed amendment does not >
involve a significant hazards consideration.
I