Application for Amend to License NPF-4,adding Footnote to Tech Spec 3/4.7.10 Which Would Allow Util to Conduct Visual Insp of Inaccessible Snubbers at Next Refueling Outage.Amend Would Eliminate Need for mid-cycle Shutdown
ML19325F130
Person / Time
Site: North Anna Dominion icon.png
Issue date: 11/01/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19325F131 List:
References
89-763, NUDOCS 8911140209
Download: ML19325F130 (3)


Text

Si V

.. .. l

.. A <

l

, . VIuGINIA ELECTRIC AND power COMPANY RicilMOND, VIRGINIA 23261 November 1, 1989 1

)

. United States Nuclear Regulatory Commission Serial No.89-763 Attention: Document Control Desk NO/DLDM:Jmj Washington, D.C. 20555 Docket No. 50 338 License No. NPF-4 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNIT 1 PROPOSED TECHNICAL SPECIFICATION CHANGE

. Pursuant to 10 CFR 50.90, the Virginia Electric and Power Company requests an amendment in the form of a change to the Technical Specifications of Operating Licensing Number NFP-4 for North Anna Unit 1.

' The proposed change to the Technical Specifications would involve the addition of a '

footnote to 3/4.7.10 (see attachment 1) which would allow Virginia Electric and Power Company to conduct a visual inspection of inaccessible snubbers at the next scheduled refueling outage instead of requiring the Unit to shutdown to perform this inspection in February 1990. The next scheduled refueling outage for North Anna Unit 1 is in March 1991. A discussion and evaluation of the proposed surveillance Interval extension is included in attachment 2.

t We believe that the information provided in attachment 2 provides sufficient technical justification to support the described surveillance interval extension. This would eliminate the need for a mid cycle shutdown, during the winter peak electrical demand, solely for the purpose of performing visual inspections on inaccessible snubbers.

i L The request has been reviewed by the Station Nuclear Safety and Operating l Committee and the Safety Evaluation and Control Staff. It has been determined that this request does not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant safety hazards consideration as defined in 10 CFR 50.92. A 10 CFR 50.92 evaluation is provided as Attachment 3.

1 8911140209 891101 DR ADOCK 0500 8 k  !

l

~

m g.

,3

]'

' f. ' , i .. *l If you have any questions or require additional information, please , contact us immediately. ,

i Very truly yours, NW. L. (Stewart$ b' t

Senior Vice President - Power Attachments

1. Proposed Technical Specification Changes
2. Discussion and Safety Evaluation 3.~ 50.92 Evaluation 1

cc: United States Nuclear Regulatory Commission ,

Region 11 101 Marietta Street, N.W.  ;

Suite 2900 Atlanta, GA 30323 )

Mr. J. L. Caldwell -

NRC Senior Resident inspector North Anna Power Station ,

Commissioner Department of Health .

Room 400 109 Governor Street Richmond, Virginia 23219 i

1

l l~

i L

1 l

'\

1

, l

. . 1 COMMONWEALTH OFVIRGINIA ) 7

) >

COUNTYOFHENRICO .) .

~

The . foregoing document was acknowledged before me, in and for the .

. County 'and Commonwealth aforesaid,'today by W. L. Stewart who is Senior Vice President - Power, of Virginia Electric and Power Company. _ He is duly authorized to' execute and file' the foregoing document in behalf of that Company, and the statements in the document are true-to the best of his knowledge and belief.

Acknowledged before me this day.of /Jtep2-> , 198_. I My Commission Expires: eIA m ff .1994.

J ~

t .

+

/El b//.

Notary' Public 1

l l.

1:

c l

l.

l (SEAL) ~

1 1

, - . . . . . . _ . _ . _ . _ _ . . _ _ _ ._ -_ _ _ _ _ __ _. . _ _ _ _ _ -