s..
I November 3, 1989
)
e, t
~
Docket Nos.
50-424 i
L and 50-425
]
I LICENSEE:
Georgia Power Company FACILITIES:
Vestle Units 1 and 2
SUBJECT:
SUMMARY
OF MEETIllG HELD OCTOBER 5,1989 TO DISCUSS THE FUTURE o
USE OF VANTAGE 5 FUEL On October 5 1989, the NRC staff met with representatives of the Georgia Power Company (GPC) et the NRC offices in Rockville, Maryland to discuss the future use of Vantage 5 fuel.
Participants are listed in Enclosure 1.
d GPC informed the NRC that they planned to use Vantage 5 fuel comencing with Unit I cycle 4 operation. The Vogtle fuel will be similar to that analyzed in WCAP-10444, " Reference Core Report VANTAGE 5 fuel Assent 31y."' GPC will, perform
.the analysis of Vantage 5 fuel for Vogtle Units 1 and 2 considering 18 month fuel, cycles and a 4 percent power upgrade; however, the Vantage 5 fuel licensing i
submittal will not request approval for power upgrade. Power upgrade will be a
i requested by a subsecuent amendment request.
The handout used at the. n.ceting is
. included as Enclosure 2.
[
3
(,
Jon B. Hopkins, Prcject Manager.
e Project Directorate 11-3
- , y Division of Reactor Projects - 1/II
[:
Endlosures:
ff As stated
,3r cc w/encls:
See next page Distribution:
De ketJ11e3 ACRS(10)
NRC & Local PDRs R. Borchardt 17/G/21
- 0. Sniezek
~
PDII-3 R/F e
D. Matthews gN8 J. Hopkins 38a OGC (info, cnly)
-o E. Jordan Y. Hsii S. Wu wgg D. Fieno S$
OFFICIAL CORD OPY O
Document s' e:
E MTG
SUMMARY
10/5
!M:PDII-0-
D:
JHop kin.. t,a D
hews t/g/89
/ /89 5
o i
Cc' Mr._J. A. Dailey Resident Inspector Manager - Licensing tiuclear Regulatory Commission Georgia Power Company P.O. Box 572 P.O. Box 1295 Waynesboro Georgia 30830 3
Birmingham, Alabarna 35201 James E. Joiner, Esq.
Bruce W. Churchill, Esq.
Troutmen, Sanders, Lockerman, Shaw, Pittmar., Potts and Trowbridge
- t. Ashmore F200 N Street, t..W.
1400 Candler Building Washington, D.C. 20037 127 Peachtree Street, H.E.
Mr. G. Bockhold, Jr.
General fianager, Vogtle Electric Mr. R. P. McConald Gercrating Plant Executive Vice President -
P.O. Box 1600 Nuclear Operations Wayr,esboro, Georgia 3083C Ceorgia Power Comp &.iy P.O. Ocx 1295 Regional Administrator, Regicn 11 Birmingham, Alabama 35201 U.S. Nuclear Regulatory Cennission 101 Marietta Street, N.W., Suite 2900 Mr. J. Leonard Ledbetter, Director Atlanta, Georgia 30323 Environmental Protection Division Departrnent of Natural Fesources Office of the County Concissic.ner 205 Butler Street, S.E., Suite 1252 Burke County Commissich Atlanta, Georgia 30334 hopesboro, Georgia 30830 Office of Planning and Budget Attorney General tocne 615B Law Cepartment 270 Washington Street, S.W.
32 Judicial Builoing Atlanta, Georgia 30334 Atlanta, Georgia 30334 hr. C. ". McCoy Mr. Alan R. Herdt, Chief Vice Presient - Nuclear, Vogtle Project Project Branch #3 Georgia Power Company U.S. Nuclear Regulatory Commission P.O. Box 1295 101 Marietta Street, hW, Suite 2900 Birminghar.;, Alabama 35201 Atlanta, Gecrgia 30323 tir. W. G. Hairston, III Senior Vice President -
Nuclear Operations Gecrgie Power Ccmpany P.O. Box 129S Birmingham, Alabama 35201
V, l
\\
l 4
l.
ATTENDANCE LIST VANTAGE 5 Fult - V0GTLE, UNITS 1 AND 2 Uctober 5, 1981 NAl'E ORGANIZAT10N J. Hopkins NRR/PD II-3 Y. Hsii NRR/SRXB S. Wu NRR/SRXB D. Fieno
' NRR /SRXB H. tiajors GPC R. Florian GPC R. Armstrong Southern Company Scrvices W. Anorews Southern Compar,y Services S. DiTommaso Westinghouse S. Davidscn Westinghcuse f
L,
'i VOGTLE VANTAGE-5 Fust UPGRADE LICENSING MEETING WITH NRC 1
l l
OcTosEn 5, 1989 l
l
\\
i
L' V0GTLE VANTAGE 5 l
\\
IMPLEMENTATION OCTOBER 5, 1989 l
AGENDA l
L INTRODUCTION -
W. ANDREWS, SCS
)
l
\\
VANTAGE 5 DESIGN FEATURES -
B. ARMSTRONG, SCS l
VANTAGE 5 LICENSING HISTORY -
S. DAVIDSON, W AND COMPARIS0N OF DESIGN PARAMETERS COMPARISON OF CURRENT AND -
B. ARMSTRONG, SCS VANTAGE 5 LICENSING PARAMETERS LICENSING SUBMITTAL -
N. MAJORS - GP SCHEDULE -
W. ANDREWS, SCS i
i Lu L'
}
L V0GTLE VANTAGE 5 PRODUCT DESIGN FEATURES l
OPTrMrzED FUEL Roos (0.360" 0.D.)
i L
Zrne Garos - 6 Mro-onros INTERMEDrATE FLOW MrXER (IFM) Garos
)
INTEGRAL FUEL BURNAsLE AsSonsERS (IFBA) j
- t-AXIAL BLANKETS
=
1 REMOVABLE TOP Nozzle (RTN)
DEsars FztTER BOTTOM NozztE (DFBN)
Exv~"r r RURNUP ASSEMBLY FEATURES w~.
,. - - +==-ey4<r--
,.w.es.----'e4
,%- -. w w ww-en-w,-e,w-~
w
.---*--.-v*-.=+.r=.e*-w,****----
e,-*-
~*- - - - - - - - - -
c.
,'a GENERAL CHARACTERISTICS OF VANTAGE-5 FUEL DESIGN O
VANTAGE-5 BASED ON THE OPTIMIZED FUEL ASSEMBLY (OFA)
DESIGN WHICH HAS BEEN IN EXISTENCE FOR ABOUT TEN YEARS SLIGHTLY SMALLER FUEL ROD DIAMETER L
ZIRCALOY RATHER THAN INCONEL GRIDS ECONOMIC BENEFIT DUE TO BETTER URANIUM UTILIZATION INCREASED DNB MARGIN l
l l
e l
CHRONOLOGY OF VANTAGE 5 LICENSING EVENTS l
l
" Kickoff" Meeting Introducing VANTAGE 5 Design MAY 1983 Features to NRC Core Performance Branch Submittal of " Reference Core Report VANTAGE 5 DEC 1983 Fuel Assembly" WCAP 10444 i
Startup of full scale IFBA Demo Program in MAY 1984 Turkey Point Unit 4, Cy 10 i
Startup of IFM Grid Demo Program in McGuire JUN 1984 Unit 1, Cy 2 l
l Startup of all VANTAGE 5 Features Demo DEC 1984 Program in Virgil Summer Cy 2 SER Issued on WCAP 10444 JUL 1985 1
L Submittal of UE Callaway VANTAGE 5 Licensing MAR 1987 Amendment SER issued for Callaway VANTAGE 5 L; censing OCT 1987 Amendment i
Submittal of SCE&G Virgil Summer VANTAGE 5 MAY 1988 Amendment SER Issued for Virgil Summer VANTAGE 5 NOV 1988 Licensing Amendment Submittal of PG&E Diablo Canyon Units 1 and 2 NOV 1983 VANTAGE 5 Licensing Amendment emm=.u
1-l l-Submittal of CP&L Shearon Harris VANTAGE 5 MAR 1989 Licensing Amendment Issued'for PGAE Diablo Canyon Units 1 and 2 MAY 1989 VANTAGE 5 Licensing Amendment Submittal of Byron /Braidwood VANTAGE 5 AUG 1989 Licensing Amendment l
Scheduled NRC SER for CP&L Shearon Harris SEP 1989 VANTAGE 5 Licensing Amendment 4
Scheduled NRC SER for Byron /Braidwood FEB 1990 VANTAGE 5 Licensing Amendment l
l l
L t
v$shreeoaW
. ~ _ -
. ~ -
2
,1 -
COMPARISON OF VANTAGE 5 LICENSING PARAMETERS AND DESIGN FEATURES i
4-l Florumeterf VegCe.
DImbio Osmysm 1/2 VIsyg h W
Feedure M
_Qte
. {.2
_{24 Eri
'M M
M 1
F883 TJPe Imper Imbsarfv5 Imper Imperfv5 Imper W
WA WW i
i Fewer 3G;!
3565 333Ef34t1 3334G411 2775 2775 3411 3560
-r FDft 1.55 1.62/I4 5 1.55 IA2/1A5 1.55 I43ftAS 1.55 1.55ft.55/tA5 l
FQ 2.30 2.50 2.32 2A5 2.32 2A5 2.32 2.99 t
i FMTC Yes Yes Yes Yes No Yes N
No i
f RAOCfFQ Serv No Yes Yes#Ne Yes/Yes No Yes No No l
SGTP e
19 5
<t%
IM 6%
IS5 in 10 %
t Diamble Flug EIIsm No Yes No Yes No Yee No No i
t l.
u
l Vogtle Upgraded Licensing Parameters current Licensing Values Vantage 5 Licensing Value Core Theinal' Power 3411 3411 MWt NSSS Thermal Design Flow 95,700 95,700 gpm per. loop Core Inlet Temperature.
558.9 558.9 F Reactor Coolant Pressure 2250 2250 psia Staat Generator P3ugging 0
0%
Level 1
Core By-pass Flow 5.8%
8.4%
(thimble plugs eliminated)
-. Max FAH 1.55 1.65 (Vantage 5) 1.62 (Standard)
-. Max F.
2.30 2.50 Q
AC(;
F ((z) Curve 3 Segments 2 segments O
i DNB Correlation W-3 WRB-2, RTDP LOCA Large Break 1981 Model BASH
~ IDCA Smal1 Break WFLASH WOTP. UMP
. M $^/ LC c -/4 l._c F T Q th u
/,'. C,2 M /j/L/
- Gu.( Pu'h> sa,a c_
iM n 's, y Pt}d's,y i
1 t
e
,,-,,,,.y
-.,,..,..._.,,,n.
.e
f CURRENT FUEL AND CORE DESIGN 4
o 17X17 STANDARD WESTINGHOUSE FUEL l
o CYCLE 2. TRANSITION To 18-MONTH CYCLES 3.4 w/o ENRICHMENT FEED ASSEMBLIES
[
o CYCLE 3 DESIGNED FoR HIGH CAPACITY 18-i40 NTH CYCLE t
4.3 w/o ENRICHMENT FEED ASSEMBLIES o
Low LEAKAGE LOADING PATTERN (IN-IN-OuT) o WET ANNULAR BURNABLE ABSORBERS (WABA) o
+7 PCM/oF HZP -+ 0 PCM/oF HFP MTC LIMIT RECONSTITUTABLE top NOZZLES o EXTENDED BURNUP FUEL ASSEMBLY DESIGN FEATURES
~~e.c.
w w,,-.,.,
-~,-ww.,.-,,,-.,,.nm n
,n,-,,-~~,a-.
r-,w--n,--.,,-
-,m.,
v.,-,-.-,,,-,,,w.....
-~
.CHRM.NT EHEL AND CORE DESIGN
(.CDNTINUE.D1 o
3,411 NW RATED THERMAL Powen o
1.55 F-DELTA-H LIMIT o
2.30 Fo LIMIT Leo o
-40 PCM/0F EOL MTC"LIMzr o / vat G
FUEL RACKS BEING LICENSED FOR 4.55 w/0 ENRICHMENT l
i
PLANNED CORE DESIGN STRATEGY 1
. o 17X17 VANTAGE-5 WESTINGHOUSE FUEL' o
HIGH ENERGY 18-MONTH CYCLES 95% CF AT UPRATED PowEn 1
4.5 w/o ENRICHMENT FEED ASSEMBLIES i
o Low LEAKAGE LOADING PATTERN (IN-IN-OuT) i 0
INTEGRAL FUEL BURNABLE Ass 0RsERS (IFBA) l l
l l
o AXIAL BLANKETS
\\
OFXTENDED BURNUP FUEL ASSEMBLY DESIGN FEATURES l
l l
1,
,-m,
,-,-..,-<,4~m..,,-
e.-..-aw,.
---.&,,,n,,--,,-._.,__-.,,.
.e.---,--.-
1 i
PLANNED __ CORE... DESIGN STRATEGY (CONTINUED)
I o
3,565 MW RATED TPi!RMAL POWER 5
1 i
o 1.65 F-DELTA-M LIMIT L
b o
2.50 Fo LmIT s
i LLO
-50 PCM/0F EOL MTC" LIMIT l
o o
POWER UPRATE ANALYSIS LICENSING REQUIRED i
f.
l 1
i 1
)
?
FUEL DESIGN CHANGES TO ACCOMMODATE HIGHER..BURNUPS i
l o
THINNER TOP AND BOTTOM N0ZZLES I
o LONGER FUEL RODS (LARGER PLENUM GAS VOLUMES) l l
l o-LARGER GAP BETWEEN ROD ENDS AND N0ZZLES o
SLIGHTLY LONGER FUEL ASSEMBLY
?
o V0GTLE-1 CYCLE-3 AND V0GTLE-2 CYCLE-2 RELOADS WILL HAVE HIGH BURNUP FEATURES 1:
~
. ~ -. -.
-. - ~.
!r :
i
\\,
j*
l L
THE RELATED TECHNICAL JPECIFICATION CHANGES ANTICIPATED FOR THE VANTAGE 5 UPGRADE FOR V0GTLE 1
0 OVERPOWER DELTA T AND OVERTEMPERATURE DELTA T TRIP l
0 E(5) CURVE O ROD DROP TIMES i
I O DNBR C00RELhTION O
0 F
LIMIT g
0 AFD LIMITS l
0 DESIGN FEATURES 0 THERMAL DESIGN FLOW 1 :.. _ _ - _.,... - - -,
L' l-l i
Licensing Submittal GPC Transmittallatter to NRC Safety Evaluation Technical Specincation Change Pages Signincant Hazard Evaluation 4,
Non LOCA Accident Analyses I
5.
Inca Accident Analyses g,
Radiological Assessment wkhronoald l
l e
-+,3
,9-y
-,e e-,-,vw--,c,w, vyww. -
-w
---<www--,.-ee ww.
--cwee-
---%_ - ~w-,a-
e V0GTLE VANTAGE-5 FUEL CORE LICENSING SCHEDULE JOINT MEETING WITH NRC TO INTRO-10/89 DUCE V0GTLE VANTAGE-5 TRANSITION LICENSING AMENDMENT.
9 GPC ISSUES FINAL LICENSING AMEND-8/1/90 MENT REQUEST FOR V0GTLE TO THE NRC.
=.
L:.
i'
$_CHEDULE OF MAJOR MILESTONES.
(CONTINUED) l JOINT NRC/GPC/SCS/W MEETING To 8/15/90 l
PROVIDE AN OVERVIEW OF SUBMITTAL, TECH SPEC CHANGES, ETC.
AND GPC l
REVIEW NEED AND SCHEDULE.
NRCREQUESTED SER To GPC ON V0GTLE 3/15 /91 LICENSING AMENDMENT REOUEST FOR VANTAGE-5 FUEL.
I L
EARLIEST ESTIMATED CRITICALITY 10/15/91 DATE FOR VOGTLE UNIT 1 CYCLE 4.