Amend 34 to License NPF-42,revising Tech Spec Surveillance Requirements 4.9.6.1 & 4.9.6.2 to Change Times When Refueling Machine & Auxiliary Hoist Must Be Demonstrated Operable
ML19325E824
Person / Time
Site: Wolf Creek 
Issue date: 11/01/1989
From: Hebdon F
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19325E825 List:
References
NUDOCS 8911090090
Download: ML19325E824 (5)


Text

..

..- _ ~ _ _ - - -

s

.g-

<i I

I

'[(fs0 "'4 9k UNITED STATES NUCLEAR REGULATORY COMMISSION

' I i;

s WASHINGTON, D. C. ROSSE 4

'(.....

ll WOLF CREEK NUCLEAR OPERATING CORPORATION i

WOLF CREEK GENERATING STATION DOCKET N0. 50-482 i

L-AMENDMENT TO FACILITY OPERATING LICENSE j

)

Amendment No. 34 License No. NPF-42 i

L 1.

The Nuclear Regula' tory Commission (the Cosmission) has found that:

A.

The application for amendment to the Wolf Creek Generating Station (the facility) Facility Operating License No. NPF-42 filed by

_s-the Wolf Creek Nuclear Operating Cor oration (the Corporation),

dated July 25, 1989, complies w'th tte standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter I; s

B.

The facility will operate in conformity with the application, as amended, the provisions of the Act, and the rules and regulations of the Commission; C.

There is reasonable assurance:

(1)thattheactivitiesauthorized by this amendment can be conducted without endangering the health and safety of the public, and (ii)'that such activities will be conducted in compliance with the Commission's regulations; D.

The issuance of this license amendment will not be inimical to the cosmon defense and security or to the health and safety of the public; and E.

The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

8911090090 891101 DR ADOCK 0500 2

m...

.-._..,,.--__m~..,_...

.,-._.,-_.,-.....-., _.__,. _,..,,,..._.,w m

_,-,....,,---,,,,_n,...-,,

,,_~, -

Je

l AccordinglyIndicated in the attachment to this license amendment and-the license is am 2.

cations as i

Paragraph 2.C.(2) of Facility Operating License No. NPF-42 is hereby

.l amended to read as follows:

2.

Technical Specifications The Technical Specifications contained in Appendix A, as revised through Amendment No. 34, and the Environmental Protection Plan contained in Appendix B. both of which are attached hereto, are hereby incorporated in the license. The Corporation shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

l 3.

The license amendment is effective as of its date of issuance.

l l

FOR THE NUCLEAR REGULATORY COPMIS$10N M$

h.c i

Frederick J. Heb8on, Director Project Directorate IV Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Attachment:

Changes to the Technical Specifications Date of Issuance: November 1, 1989 3

.,-.---.........-_...,..-,.~,-,..._..-,.,,~,,.~,...~._--..-,__,.._,._,_-m.

e o

ATTACHMENT TO LICENSE AMENDMENT NO. 34 FACILITY OPERATING LICENSE NO._ NPF-42 DOCKET NO. 50-482 Revise Appendix A Technical Specifications by removing the page identified below and inserting the enclosed page. The revised page is identified by amendment number and contains marginal lines indicatinti the areas of change.

The corresponding overleaf page is also provided to maintain document completeness.

INSERT PAGE REMOVE PAGE 3/4 9-7 3/4 9 7 i

4 4

I I

l l

l l

l r

+--

, _ ~ -., _, _ _ _. _.

..~-,-_......,,...,.--.-,.,,y..,,-

,_,.-c.

._...,, _,.,.,.,,, --y,---.-.,

I ['

i.

REFUELING OPERATIONS SURVEILLANCE REQUIREMENTS (Continued) to the movement of fuel assemblies in the reactor vessel by performing a load l

test of at least 1255 of the secondary automatic overload cutoff and demonstra-

' ting an automatic load'. cutoff when the refueling machine load exceeds the Setpoints of Specification 3.9.6a.2) and by demonstrating an automatic load reduction trip when the load reduction exceeds the Setpo'nt of Specification 3.9.6a.3).

4.9.6.2 Each auxiliary Nist and associated load indicator used for movement i

of drive rods within the reactor vessel shall be demonstrated OPERABLE within 100 hours0.00116 days <br />0.0278 hours <br />1.653439e-4 weeks <br />3.805e-5 months <br /> prior to the movement of drive rods within the reactor vessel by l

performing a load test of at least 1250 pounds.

l i

l 1

i WOLF CREEK - UNIT 1 3/4 9-7 Amendment No. 34 a

REFUELING OPERATIONS r

3/4.9.7 CRANE TRAVEL - SPENT FUEL STORAGE FACILITY LINITING CONDITION FOR OPERATION 3.9.7 Loads in excess of 2250 pounds shall be prohibited from travel over fuel assemblies in theispent fuel storage facility.

APPLICABILITY: With fuel assemblies in the spent fuel storage facility.

ACTION:

L a.

With the requirements of the above specification not satisfied.

place the crane' load in a safe condition, b.

The provisions of Specifications 3.0.3 and 3.0.4 are not applicable, SURVEILLANCE REQUIREMENTS 4.9.7 Crane interlocks and physical stops which prevent crane travel with loads in excess of 2250 pounds over fuel assemblies shall be demonstrated OPERABLE within 7 days prior to crane use and at least once per 7 days thereafter during crane operation.

l l

WOLF CREEK UNIT 1 3/4 9-8

.. -. -. -..