Text
.
'f i
C.
Oak Pic;e Associateo Post OMe 80x 117 1
O Universces Cat Ac;e. Tennessee 376210117 I
l September 21, 1989 r
?
Nr. George Trance Region III Nuclear Regulatory Commission 799 Roosevelt Road l
Glen Ellyn, Illinois 60137 Subj ec t:
SURVEY RESULTS FOR PHASE 2 CONSTRUCTION:
COMBUSTION ENGINEERING i
Dear Mr. France l
r The results of the recent survey performed on Phase 2 of construction at Combustion Engineering (CE) in Hematite, Mf.ssouri, are provided in the enclosed
[
1etter report. The results of laboratory v.nalyses indicate 10 soil samples t
exceed established NRC guidelines for resicNa1 eviched uranium.
CE plant I
officials were informed of preliminary datst resuais through telephone l
communications: at that time four locationsa were identified as definitely exceeding guidelines. A map of our sample locations was provided to CE as s
'l result of the telephone communication.
j Questions or additional information should be referred to me at FTS 626-3355.
Sincerely, i
Phyllis R. Cotten l
l Health Physics Team Leader.
Environmental Survey and l
Site Assessment Program i
PRC jls
]
i ect L. Route, NRC/6H3 J
I-D. Tiktinsky, NRC/6A4 G. LaRoche NRC/6H3 l
l 891108041e 891019 1
PDR ADOCK 0700003d, C
PNV i
1