_- w pg,
p j.;
svF,,,.
l BW/IP htern:ti:n:1, Inc.
.e.
I
' P O Dok Los Angeles Telephone l
p P01F Cahlornia F13 6B7 (,171 me i
lorminal 90051 Teles pg,
Annen c.rnas Ceestrifugal yg3 99 p:q)g Pumps Pung Omskm
.2 October 1989 l"
i Administrator, Office of Inspection c
and Enforcement, Region V L
U. S. Nuclear Regulatory Commission F
1450 Maria Lane, Suite 210 Walnut Cteek, California 94596 Gentlemen:
i This letter transmits a notification of defects, and nonconformances I
required by 10CFR - Part 21. The attached notificatAon, CFRN-8901, reports a condition which occurred st Texas Utilities Comanche Peak Steam Electric Station.
Very'truly yours, G. C. G dwfn Manager Los Angeles Operations CCG/ah P
Attach:
3 Copies of Notification i
cc:
Mr. F. J. Borgers, Vice President Operations Mr. E. B. Fiske, Directer of ngineering Mr. R. D. Ham, Manager of Quality Dr. S. Gopalakrishnan, Manager of Engineering 9
D S 100 60 Dr. K, A. Huber, Technical Liaison Mr. W. A. Klenner, Project Manager A N01038 CUN 03Al3038 9911080240 891002
{
'\\
PDR ADOCM 05000445 S
PNU E
IL~
I3
q' l T Q N '. 'qm;. Mv'
.. g 1
- ,;o
- 3. j ; ys e;s
,c
- v.
9<
...r-
,y>
.F,-
N.
'i' h(
10 CFR PART 21 NOTIFICATION ~
f 3
%
- q?l (Reference No..CFRN-8901)'
NAME AND ADDRESS-OF THE INDIVIDUAL' OR INDIVIDUALS INFORMING THE COMMISSION: ~-
,x
.v>
Mr. G,-C.'Godwin
[W'
' BW/IP' International, Inc.
[
<O.,
. Pump. Division Los Angeles'0peration
'2300-E. Vernon Avenue
,g
' Ve'rnon, ; CA, 90058.-
s 5
(213) 587,,171 4
lf For Technical Information
Contact:
Dr. Kent Huber i
'.6 -.
IDhNTIFICATIONOFTHEFACILITY,THEACTIVITY,ORTHEBASICCOM-i l'
PONENT SUPPLIED FOR SUCH FACILITY OR SUCH ACTIVITY WITHIN THE. UNITED.
' STATES WHICH FAILS TO COMPLY OR CONTAINS A DEFECT:
1 y,
7 s
Texas Utilities, Comanche Peak Steam Electric. Station.
'f y.-
Basic Component, High Pressure Swing Check Valve. Serial No'..17145 i
q.
Drawing No. 76490.- Texas Utilities Tag'No. lSW-048.
i i
.1
^
i s,.
[
7-6
^
U (IDENTIFICATION OF THE FIRM CONSTRUCTING THE FACILITY OR SUPPLYING THE BASIC COMPONENT WHICH FAILS TO COMPLY OR CONTAINS A DEFECT:
i g
BW/IP International, Inc.
?
Successor to:
(
Borg-Warner Nuclear Valve Division
(
g..
7500 Tyrone Avenue
?
Van Nuys, CA 91409
.7 c
l-E
.g I I I
<..,).
Paco 1 of 3 1,
4 p
cu
-,7
.---w 3--
?
(fll llI' o-
- <-J :s,s c
i2
- 5l:,
10' CFR, Pirt ' 21, NotificOtion t
[p,
- R.
(Ref. No..CFRN-8901) vi i2 C
NATURE OF THE' DEFECT 'OR' FAILURE 'ID COMPLY AND THE SAFETY HAZARD WilICH plh IS CREATED OR COULD'BE CREATED BY SUCH DEFECT OR FAILURE TO COMPLY:
' Nature of Defect:
.The' swing arm in,the valve was found broken-during an inspection at the.
Comanche Peak Steam Electric Station.
Safety hazard whichfiw created or
- could'be created is' unknown, due to insufficient knowledge of component S'
. service and. mode ofLoperation.
U' w
Y (E 1.
. ). '
F*
h THE DATE ON WHICH THE INFORMATION OF' SUCH DEFECT OR FAILURE' TO COMPLY D
WAS OBTAINED:
1 g
The incident was intially reported to BW/IP-International'on.
20 June 1989. Additional information concerning the failure has K
't
' subsequently.been: supplied by Texas Utilities.
i'
[-
l r
p u
.IN THE CASE OF A BASIC COMPONENT WHICH CONTAINS A DEFECT OR FAILS TO COMPLY, THE NUMBER AND LOCATION OF ALL SUCH COMPONENTS IN USE AT, SUPPLIED FOR, OR BEING~ SUPPLIED FOR ONE OR MORE FACILITIES OR ACTIVITIES SUBJECT TO THE REGULATIONS IN THIS PART:
Initial investigation of the failed component has indicated no defects or failure to comply, nor has BW/IP received any notification of similar failures in.like components in operating plants with many years of service (see' Attachment A).
l l
I b
4 Page 2 of 3 i
i e
l j
S
~ j,
{ww"J.,- q; 10: CFR, P2rt 21,[Notificitions w'. :
P
. Di (Ref. No. CFRN-8901)=
{g I
c f
- itl,
[
THE CCRRECTIVE' ACTION '!HICH HAS-BEEN, IS BEING, OR WTLL DE TAKEN; THE HAME. O.t THE INDIVIDUA*a OR ORGANIZATION RESPONSIBLE FOR TIIE ' ACTION; AND' Td? if7A' OF TE4E THAT HAS BEEN OR WILL BE TAKEN TO COMPLETE THE K
.a :
- ACTION:-
"c, Texas Utility.is performing a failure analysis on the broke" arm. As i*
' ~
W <of this date BW/IP-International has not completed'their review of.
this effort'. After the review is complete, BW/IP.will perform an
. independent evaluation as appropriate.-
\\
t
,4 s
4 t
- m F
- e r
l.
A1:Y ADVICE RELATED TO THE DEFECT OR FAILURE TO COMPLY ABOUT THE FACILITY.t ACTIVITY, OR BASIC COMPONENT THAT HAS BEEN,' IS BEING, OR WILL BE GIVEN' TO PURCHASERS OR LICENSEES:-
To date this is the only known instance of a swing check valve arm-f ailure of any. Borg-Warner Nuclear Valve.
However, BW/IP will inform customers of this failure.
p F
(1 )
{
Pace 3 of 3 y
g; J*:
ygt ;
i jc,
$ k l
, e j
- 0..p a
'j f.
'i
\\
k't*
E ATTACHMENT A u
I g,
4 TO I
('
10CFR, PART 21 S
(REF. No. CFRN 8901) l L~
P i
) -.
(L.
'1.-
Florida Power & Light, St. Lucie Station U
i 2.
Texas Utilities Generating Co., Comanche Peak Station 3.
Washington Public' Power Supply System, WNP 3 SATSOP l
b 4
~ Tennessee Valley Authrity. Browns Ferry Station
}
-f i.
5.
Tennessee Valley Authority, Watts Bar Station i.
6.
Arkansas Power and Light, ANO-1 I
(;
7.
Arizona Public Service Co., Palo Verde Station i'
8.
Cleveland Electric Illuminating Co., Perry Nuclear Station i
i 9.
Duke Power Company,!!cGuire Station 10.
Duke Power Company, Catawba Station 11.
Societe Belgo-Francaise d'Energie, Tihange Station
'[
12.
Taiwan Power Company, Maanshan Station l
13.
Nuklearna Elektrana Krsko, Krsko Station P
'h e
(
i.
k
(
-P t
M-I,