Amend 52 to License NPF-18,revising Tech Specs Re Table of Primary Containment Penetration Conductor Overcurrent Protective Devices to Reflect New Locations of Breakers for RHR Shutdown Cooling Suction Isolation Valves
ML19325E482
Person / Time
Site: LaSalle 
Issue date: 10/25/1989
From: Shemanski P
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19325E483 List:
References
NUDOCS 8911070218
Download: ML19325E482 (5)


Text

.

_ ~ -. - -

{

. f "%*'g

?

UNITED STATis 8

n NUCLE AR REGULATORY COMMISSION s{

]

mmworow. o. c. nom l

COMMONWEALTH EDISON COMPANY DOCKET NO. 50-374 LASALLE COUNTY STATION. UNIT 2 l

AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 52 License No. NPF-18 l

1.

The Nuclear Regulatory Comission (the Comission or the NRC) has found that:

i A.

The application for amendment filed by the Commonwealth Edison Company j

(the licensee), dated Decenber 2,1968, and supplemented on January 11, f

1989, and May 17, 1989, complies with the standards and requirements

{

of the Atomic Energy Act of 1954, as amended (the Act), and the r

Comission's regulations set forth in 10 CFR Chapter It j

B.

The facility will operate in conformity with the application, the i

provisions of the Act, and the regulations of the Comission; l

C.

There is reasonable assurance: (i)thattheactivitiesauthorizedby this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations set forth in 10 CFR Chapter I; D.

The issuance of this anendment will not be inimical to the cosmon f

defense and security or to the health and safety of the public; and i

E.

The issuance of this anendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.

2.

Accordingly, the license is amended by changes to the Technical Specifica-I tions as indicated in the enclosure to this license amendwent and paragraph 2.C.(2) of the Facility Operating License No. NPF-18 is hereby amended to e

read as follows:

f (2) Technical Specifications and Environmer.tal Protection Plan The Technical Specifications contained in Appendix A, as revised through Amendnent No. 52, and the Environnental Protection Plan contained in Appendix B, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications and the Environmental Protection Plan.

8911070218 891025 ADOCKOSOOy4]4 l

DR

o t

2 3.

This amendment is effective upon date of issuance, FOR THE NUCLEAR REGilLATORY COMMIS$10N t

\\

.C.f

-. A '.

L l

[

Paul C. Shemanski, Acting Director l

Project Directorate 111-2 Division of Reactor Projects - III, IV, Y and Special Projects Office of Nuclear Reactor Regulation

Enclosure:

Changes to the Technical l

Specifications Date of Issuance: October 25, 1989 f

9 Y

P l

i i

i i C ENCLOSURE TO LICENSE AMENDMENT NO. 52 r

FACILITY OPERATING LICENSE NO. NPF-18 DOCKET NO. 50-374 l

Replace the following pages of the Appendix 'A" Technical Specifications with the enclosed pages. The revised pages are identified by amendment number and 1

contain a vertical line indicating the area of change.

REMOVE INSERT 3/4 8-24 3/4 8-24 3/4 8-25 3/4 8-25 i

i t

4 I

f L

f 6

i.

F TABLE 3.8.3.2-1 3

PRIMARY CONTAINMENT PENETRATION CONDUCTOR OVERCURRENT PROTECTIVE DEVICES L

L DEVICE NUMBER AND LOCATION SYSTEM / COMPONENT POWERED a.

6.9 kV Circuit Breakers t

i 1.

Swgr. 251 (Bkr. 3A)

RR Pump 2A Primary - fast speed i

2.

Swgr. 252 (Bkr, 38)

RR Pump 2B Primary - fast speed 3.

Swgr. 251-1 (Brk. 2A)

RR Pump 2A, i

Primary - low speed 4.

Swgr. 252-1 (Brk. 2B)

RR Pump 28, Primary - low speed 5.

Swgr. 251-1 (Brk. 4A)

RR Pump 2A, Backup - fast speed 6.

Swgr. 252-1 (Brk. 48)

RR Pump 2B Backup - fast speed i

b.

4.16 kV Circuit Breakers 1.

Swgr. 241Y (Brk. IA)

RR Pump 2A Backup - low speed 2.

Swgr. 242Y (Brk. IB)

RR Pump 2B Backup - low speed r

c.

480 VAC Circuit Breakers 1.

Swgr. 236Y (Compt. 400A)

VP/Pri. Cont.

Vent Supply Fan 2B 2.

Swgr. 235Y (Compt. 2020)

VP/Pri. Cont.

Vent Supply Fan 2A d.

480 VAC (Molded Case) Circuit Breakers 1.

Backup breakers are located in the back of the respective MCC.

a) MCC 236Y-2 (Compt. C4)

RR/MOV 2B33-F0678 b) MCC 236Y-2 (Compt. A3)

RR/MOV 2B33-F023B c) MCC 234X-1 (Compt. 83)

NB/MOV1 2B21-F001 LASALLE - UNIT 2 3/4 8-24 Amendment No. 52

W~

l TABLE 3.8.3.2-1 (Continued) 1 DEVICE NUMBER AND LOCATION SYSTEM / COMPONENT POWERED d) MCC 234X-1 (Compt. 84)

NB/MOV 2B21-F002 i

e) MCC 236Y-1 (Compt. 82 (Normal)

RH/MOV 2E12-F009 f) MCC 236Y-2 (Compt. E4)

RI/MOV 2E51 F063 i

g) MCC 235Y-1 (Compt. A1)

RR/MOV 2833-F023A h) MCC 235Y-1 (Compt. A4)

RR/MOV 2B33-F067A i) MCC 233-1 (Compt. C2)

RT/MOV 2G33-F102 j) MCC-233-1 (Compt. EI)

NB/MOV 2B21-F005 r.

k) MCC-236Y-2 (Compt. B1)

NB/MOV 2B21-F016

1) MCC 236Y-2 (Compt. E1)

RH/MOV 2E12-F099A m) MCC 236Y-1 (Compt. E4)

RT/MOV 2G33-F001 i

n) MCC 236Y-2 (Compt. A5)

WR/MOV 2WR180 o) MCC 236Y-2 (Compt. D6)

RH/MOV 2E12-F0998 l

p) MCC 236Y-1 (Compt. H5)

VP/MOV 2VP113B i

q) MCC 236Y-1 (Compt. H4)

VP/MOV 2VP114A j

r) MCC 236Y-1 (Compt. H3)

VP/MOV 2VP113A s) MCC 236Y-1 (Compt. H6)

VP/MOV 2VP114B t) MCC 236Y-2 (Compt. A4)

WR/MOV 2WR179 u) MCC 235Y-1 (Compt. D3)

RT/MOV 2G33-F101 v) MCC 235Y-1 (Compt. 04)

RT/MOV tG33-F100 w) MCC 233-1 (Compt. C3)

RT/MOV 2G33-F106 x) MCC 236Y-2 (Compt. DS)

RI/MOV 2E51-F076 y) MCC 235X-1 (Compt. 02/C3) (Emerg)

RH/MOV 2E12-F009 2.

Backup breakers are located in the front of the respective MCC.

a) MCC 235X-2 (Compt. AA4)

VP/Pri. Cont.

l Vent Supply Fan 2A Backup b) MCC 236X-2 (Compt. AA4)

VP/Pri. Cont Vent Supply Fan 2B Backup l

LASALLE - UNIT 2 3/4 8-25 Amendment No. 52