e
~%
C*
N Commonweshh Edisoe i
d 72 t!est Adams Street. Creapo. iiiros e
\\
/ M35s Aepii tTP5sf0Cics BoPF Y/ Chicago,li:iriais 00693 0767 p
October 31, 1989 l
t Director of Nuclear Reactor Regulation US Nuclear Regulatory Commission l
Mail Station PI-37
)
i Washington, DC 20555
Subject:
' Zion Nuclear Fower itation, Units 1 and 2 License Nos. C'PR-39 and DPR-48 Proposed Amencment to Technical Specification (Tech Spec)
Generic Lettet 83-37, NUREG 0737 Tech Spec Requirements j
HRC._Dorit.tJg. 50-295 and_5D-304
Dear Sir:
, to this letter outlines several proposed changes to the i
Facility Operating Licenso Numbers DPR-39 and DPR-48 as defined in Technical Specifications, Appendix A for Zion Nuclear Power Station.
These proposed changes are intended to address the requ'rements of Generic letter (GL) 83-37, by i
incorporating the operating requ'rements of post accident monitoring instrumentation into the existint Technical Specifications.
In addition, some i
minor changes have also been madu to various Tables and their explanatory Notes in order to be consistent with NUREG 0737 terminology. provides a summary description and justification of the J
proposed changes. Attachmen+ 3 provides an evaluation of significant hazards consideration and provides e demonstration that the proposed changes warrant no significant hazards consideration. Attachment 4 to this letter contains the status of GL 83-37, Enclosure 1 Items, anc is provided as a summary of the various post accident monitoring system or in!:trumentation r quirements, and a reference to the Technical Specification which.ini:orporates the requirement.
l Many of the additional requirements that will be incorporated into the Technical Snecifications will nee:essitate procedural changes and training of i
operating personnel.
Therefore, Commonwtalth Edison requests that consideration be given to the assignment of an efdective date for implementation of 90-days after issuance of the proposed 'mendment.
..s provided by 10 CFR 50.91, the State of Illinois is being iotified of i
this amendment request by transmittal of thi; letter and attachments.
j Pl[asedirectanyquestionsthatyoumayhaveregardingthismatterto this office, Very truly yours,
'M fM 8912070217 891031 G.E. Trzyna
{DR ADOCK0500g2j5 Nuclear Licensing Administrator i
/scl:0357T:1 Attachments cc:
C.P. Patel-NRR
't.C. Parker-IDNS 1
)
Senior Resident Inspector-Zion
.