ML19325E480

From kanterella
Jump to navigation Jump to search

Application for Amends to Licenses DPR-39 & DPR-48, Addressing Requirements of Generic Ltr 83-37,by Incorporating Operating Requirements of post-accident Monitoring Instrumentation Into Existing Tech Specs
ML19325E480
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 10/31/1989
From: Trzyna G
COMMONWEALTH EDISON CO.
To:
Office of Nuclear Reactor Regulation
Shared Package
ML19325E481 List:
References
GL-83-37, NUDOCS 8911070217
Download: ML19325E480 (1)


Text

,

e

~%

C*

N Commonweshh Edisoe i

d 72 t!est Adams Street. Creapo. iiiros e

\\

/ M35s Aepii tTP5sf0Cics BoPF Y/ Chicago,li:iriais 00693 0767 p

October 31, 1989 l

t Director of Nuclear Reactor Regulation US Nuclear Regulatory Commission l

Mail Station PI-37

)

i Washington, DC 20555

Subject:

' Zion Nuclear Fower itation, Units 1 and 2 License Nos. C'PR-39 and DPR-48 Proposed Amencment to Technical Specification (Tech Spec)

Generic Lettet 83-37, NUREG 0737 Tech Spec Requirements j

HRC._Dorit.tJg. 50-295 and_5D-304

Dear Sir:

, to this letter outlines several proposed changes to the i

Facility Operating Licenso Numbers DPR-39 and DPR-48 as defined in Technical Specifications, Appendix A for Zion Nuclear Power Station.

These proposed changes are intended to address the requ'rements of Generic letter (GL) 83-37, by i

incorporating the operating requ'rements of post accident monitoring instrumentation into the existint Technical Specifications.

In addition, some i

minor changes have also been madu to various Tables and their explanatory Notes in order to be consistent with NUREG 0737 terminology. provides a summary description and justification of the J

proposed changes. Attachmen+ 3 provides an evaluation of significant hazards consideration and provides e demonstration that the proposed changes warrant no significant hazards consideration. Attachment 4 to this letter contains the status of GL 83-37, Enclosure 1 Items, anc is provided as a summary of the various post accident monitoring system or in!:trumentation r quirements, and a reference to the Technical Specification which.ini:orporates the requirement.

l Many of the additional requirements that will be incorporated into the Technical Snecifications will nee:essitate procedural changes and training of i

operating personnel.

Therefore, Commonwtalth Edison requests that consideration be given to the assignment of an efdective date for implementation of 90-days after issuance of the proposed 'mendment.

..s provided by 10 CFR 50.91, the State of Illinois is being iotified of i

this amendment request by transmittal of thi; letter and attachments.

j Pl[asedirectanyquestionsthatyoumayhaveregardingthismatterto this office, Very truly yours,

'M fM 8912070217 891031 G.E. Trzyna

{DR ADOCK0500g2j5 Nuclear Licensing Administrator i

/scl:0357T:1 Attachments cc:

C.P. Patel-NRR

't.C. Parker-IDNS 1

)

Senior Resident Inspector-Zion

.