ML19325E338

From kanterella
Jump to navigation Jump to search
Submits Steam Generator Tube Plugging Results Conducted During 1989 Outage on 891006-21.Detailed 90-day Rept Will Be Submitted by 900121
ML19325E338
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 10/22/1989
From: Miller D
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
EN-89-1066, NUDOCS 8911060278
Download: ML19325E338 (1)


Text

s m

[

,R'

]

l:

1 L,.

g,.A '

1 C'ONNECTICUT YANKEE ATCMIC POWER COMPANY 4

HADDAM NECK PLANT r

RR#1

  • box 127E
  • EAST HAMPTON. CT 06424-9341 I

October 22,1989 EN-891066 U.S. Nuclear Rr.9& tory Comniission Document Cost 4 Dak Washington, b.C. 20555 l

i

Subject:

Haddam Neck Pbat,1989 Steam Generator Tde.- Plugging Report.

In accordance witn tne reporting requirements of Haddam Neck Technical Specifications, Paragraph 6.9.2.d, the results of Steam Generator tube plugping conducted during the 1989 outage from October 6 to October 21, are provided below:

Number of Tubes Plugged Total Tubes Stenm Generator During the 1989 Outnge Plugned to Date 1

13 210 2

69 370 3

-4 89 4

73 389 The detailed ninety day report will be submitted by January 21,1990.

Very truly yours, J

)

Donald B. Miller, Jr.

Station Superu, ndent cc:

Mr. William Y. Russell Regional Adm: tistrator, Region I 475 Allendale Rd.

King of Prussia PA 19406 J.T. Shediosky Sr. Resident Inspector Haddam Neck r

0k 0

891106 _0278 091022mz q,

r

.-