Text
.j E
s DISTRIBUTION i
N PDIII-3 r/f i
' Docket N0." 50-483, NRC& Local PDR'sTMurley j
JSniezek JPartlow JZwolinski GHolahan j
MEMORANDUM'FOR: John N. Hannon, Director TAlexion WLanning Project Directorate III-3 OGC EJordan i
. Division of Reactor Projects - III, BGrimes RECP/0WFN IV, Y end Special Projects TColburn DFieno Office of Nuclear Reactor Regulation JHannon ACRS(10) 1 GPA/PA VW11 son j
FROM:
Thomas W. ' Alexion, Project Manager LThomas JStrasma Project Directorate III-3 PKreutzer Division of Reactor Projects - III, IV,.Y and Special Projects L-Office of Nuclear Reactor Regulation r
F
SUBJECT:
FORTHCOMING MEETING WITH UNION ELECTRIC COMPANY l
m DATE & TIME:
Friday, Novenber 3,1989 j
9:30 A.M. - 11:30 A.M.
f LOCATION:
One White Flint North, Room 14-B-13 11555 Rockville Pike Rockville, Maryland
' PURPOSE:
The licensee will discuss the Cycle 5 core design and 1
associated proposed technical specification changes and 50.59 changes (agenda attached).
Participants:
30 UNION-ELE' CTRIC 0
R. Jones D. Shafer, et. al.
T. Collins
~
D. Fieno Sincerely,
$d2060027891025 Thomas W. Alexion, Project Manager 4
ADOCK 05000483 [
Project Directorate III-3 P
PNV P
Division of Reactor Projects - III, IV, V and Special Projects Office of Nuclear Reactor Regulation Enclosures as stated cc: See next page
- Meetings between NRC technical staff and applicants or licensees are open for interested members of the public, petitioners, intervenors, or other parties to attend as observers pursuant to "Open Meeting Statement of NEC Staff Policy,"
43 Federal Register 28058,6/28/78.
g Office:
LA/PDDII-3 PM/PDI PD PDIII-3
\\
Surname: PKrbll$er TAlexi BDeFayptte
/j0\\
d
/0/>3/89
\\
Date:
f(j/p/89
/d /2f/ 9
.n
.v6 P
i Callaway Cycle 5 Meeting Acenda g vener 3. 1959
~
t I.
-Introduction II.
Plant Operation Update III.
Cycle 5 Core Design IV.
Technical Specification Changes A.
Fuel Receipt 1.
Fuel Rack Criticality Analysis B. -
Prior to Outage 1.
Negative: Flux Rate Trip Deletion 2.
3% Accumulation in Secondary Safeties
,C.
Independent of Outage 1.
Cycle Specific Variable Removal (COLR)
-c 2.
Removal of 3.25 Requirement from Spec 4.0.2 V.'
50.59 Changes at Outage L
A.
RTD Bypass Loop Elimination B.
Thimble Plug Removal C.
' Other l
e, l
VI.
-Schedule VII.
. Summary g