ML19325E155
| ML19325E155 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/24/1989 |
| From: | Hannon J Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19325E156 | List: |
| References | |
| NUDOCS 8911020123 | |
| Download: ML19325E155 (5) | |
Text
.-.
I
.',o UNITED STATES
+
g NUCLEAR REGULATORY COMMISSION e
5 WASHINGTON, D C. 20666
- %...+ /
i I
i f
WISCONSIN ELECTRIC POWER COMPANY DOCKET NO. 50-301 l
POINT BEACH NUCLEAR PLANT. UNIT NO. 2 i
AMENDMENT TO FACILITY OPERATING LICENSE Amendment No. 128 License No. DPR-27 i
1.
The Nuclear Regulatory Comission (the Connission) has found that:
f A.
The application for amendment by Wisconsin Electric Power Company l
- the licensee) dated August 8, 1989 as modified August 31, 1989, i
complies with the standards and requirements of the Atomic Energy Act of 1954, as amended (the Act), and the Commission's rules and regulations set forth in 10 CFR Chapter 1; j
t B.
The facility will operate in conformity with the application, ths provisions of the Act, and the rules and regulations of the i
Comission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Commission's regulations; l
t D.
The issuance of this amendaent will not be inimical to the common defense and security or to the health and safety of the public; anc E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
t' pP%B6M M68}{gi j
?
..m-,
j J
. l 2.
Accordingly, the license is amended by changes to the Technical i
Specifications as indicated in the attachaent to this license amendment, and paragraph 3.B of Facility Operating License No.
i DPR-27 is hereby amended to read as follows i
B.
Technical Specifications The Technical Specifications contained in Appendices A and B, l
as revised through Amendment No.128, are hereby incorporated in the license. The licensee shall operate the facility in accordance with the Technical Specifications, i
3.
This license anensment is effective inmediately. upon issuance. The i
Technical Specifications are to be implemented within 20 days from the i
date of issuance.
FOR THE NUCLEAR REGULATORY COMMISSION l
b John N. Hannon, Director i
Project Directorate III-3 Division of Reactor Projects - 111, i
IV, V and Special Projects Office of Nuclear Reactor Regulation.
i 1
Att chment:
Changes to the Technical Specifications t
Date of Issuance: October 24, 1989 t
s
- l l
i
~ ~ - - -
i 1
i i
i ATTACHMENT TO LICENSE AMENDMENT NO.128 l
TO FACILITY OPERATING LICENSE NO. DPR-27 l
l DOCKET NO. 50-301 1
Revise Appendix A Technical Specifications by removing the pages identified below and inserting the enclosed pages. The revised pages are identified by i
amendment number and contain marginal lines indicating the area of change.
.i i
REMOVE INSERT i
15.3.1-8a 15.3.1-Ba Table 15.3.1-2 Table 15.3.1-2 l
l I
l i
I l
l 8
i r
I I
h O
dates accommodate the weld data needs of all the participants in the Babcock and Wilcox Master Integrated Reactor Vessel Surveillance Program. Additionally, the schedule will provide plate / forging material data as well as fluenco data corresponding to the expiration of the current Unit 2 license and the end of a twenty-year license extension.
References (1) FSAR Section 4.1.5 (2) Westinghouse Electric Corporation WCAP-10638 (3) Westinghouse Electric Corporation. WCAP-8743 (4) Westinghouse Electric Corporation, WCAP-8738 i
l l
1 l
i l
i i
i.
i i
I i
Unit 2 - Amendmont 57.J02, 128 15.3.1-8a i
i e
i TABLE 15.3.1-2' POINT BEACH NUCLEAR PLAN 1, UNIT NO. 2 REACTOR VE5SEL SURVEILLANCE CAP 5ULE REMOVAL SCHEDULE I
Capsule Approximate I
Letter Rcmoval Date*
l j
V November 1974 (actual)
[
1 l
T l
March 1977 (actual)
R April 1979 (actual) i S
F,a11 ' 1990 P
Fall 1996 N
Stanoby
- The actual removal dates will be adjusted to coincide with the closest scheduled plant refueling outage or major reactor plant shutdown.
1 L
k v
e
+
I Unit 2 Amendment E7.702.1 128 1
.. _.