ML19325D903

From kanterella
Jump to navigation Jump to search
Errata to Amend 41 to License NPF-43,revising Tech Spec Page 3/4 3-14a
ML19325D903
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/19/1989
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19325D904 List:
References
NUDOCS 8910270142
Download: ML19325D903 (1)


Text

s u

TABLE 3.3.2-1 (Continued)

ISOLATION ACTUATION INSTRUMENTATION TABLE NOTATIONS (Continued)

I i

(f) Isolates with simultaneous RCIC Steam Supply Pressure-Low (Isolation Instrumentation) and Drywell Pressura-High (ECCS Actuation Instrumentation).

a (g) Isolates with simultaneous HPCI Steam Supply Pressure-Low (Isolation i

Actuation Instrumentation) and Drywell Pressure-High (ECLS Actuation Instrumentation).

(h) Reserved.

(i) Secondary Containment Isolation Push-buttons.

(j) This pressure signal actuates Groups 2, 12, 13, 14, 15, 16, 17, 18, and 1

With time delay of 45 seconds.

i l

i 1

oy10270142 891019 PDR f4DnCK 05000341 p

PDC j

FERMI - UNIT 2 3/4 3-14a Amendment No. 41

-