ML19325D903
Jump to navigation
Jump to search
| ML19325D903 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/19/1989 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Shared Package | |
| ML19325D904 | List: |
| References | |
| NUDOCS 8910270142 | |
| Download: ML19325D903 (1) | |
Text
s u
TABLE 3.3.2-1 (Continued)
ISOLATION ACTUATION INSTRUMENTATION TABLE NOTATIONS (Continued)
I i
(f) Isolates with simultaneous RCIC Steam Supply Pressure-Low (Isolation Instrumentation) and Drywell Pressura-High (ECCS Actuation Instrumentation).
a (g) Isolates with simultaneous HPCI Steam Supply Pressure-Low (Isolation i
Actuation Instrumentation) and Drywell Pressure-High (ECLS Actuation Instrumentation).
(h) Reserved.
(i) Secondary Containment Isolation Push-buttons.
(j) This pressure signal actuates Groups 2, 12, 13, 14, 15, 16, 17, 18, and 1
With time delay of 45 seconds.
i l
i 1
oy10270142 891019 PDR f4DnCK 05000341 p
PDC j
FERMI - UNIT 2 3/4 3-14a Amendment No. 41
-