ML19325D663
| ML19325D663 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 10/19/1989 |
| From: | Yundt C PORTLAND GENERAL ELECTRIC CO. |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| CPY-265-89, NUDOCS 8910250258 | |
| Download: ML19325D663 (1) | |
Text
,...
1 i
F y"..
. 'o
[.
M
('
r4. M 'c October 19, 1989
- Portland General T.lectric C rnpany CPY-265-89 j
t Troian Nuclear Plant 71760 Columbia River llwy i
Rainier, Orcron 97048 j
f.
(503)$543713 U. S. Nuclear Regulatory Commission Document Control Desk l.
Warhington, D.C.
20555 j
i l
i Gentlemen
]
t
[
Snecial Report L
Limiting Condition for Operation (LCO) 3.7.8.1 of the Trojan Technical Specifications (TTS) requires submittal of a special l
1 Report if one fire pump is inoperable for greater than 7 days.
l The diesel fire pump was declared inoperable on September 27, 1989.
A fire engine, from the local municipality, was staged onsite to provide for the loss of redundancy of the diesel fire pump.
The pump was returned to service on October 13, 1989.
i Sincerely, C.
. Yundt
[
General Manager Trojan Nuclear Plant V&h l
l CPY
/JWL/RQR/TRB:ses c:
Mr. David Stewart-Smith State of Oregon i
L Department of Energy Mr. John B. Martin Regional Administrator l
l US Nuclear Regulatory Commission i
Mr. R. Barr USNRC Resident Inspector Trojan Nuclear Plant i
Distribution i
i 8910250258 spio3, fg,
[DR ADOCK 0500 4
19
__