ML19325D429
| ML19325D429 | |
| Person / Time | |
|---|---|
| Site: | Big Rock Point File:Consumers Energy icon.png |
| Issue date: | 10/19/1989 |
| From: | Eddy J CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| NUDOCS 8910240051 | |
| Download: ML19325D429 (1) | |
Text
p
-c g
I Consumers power L
pawrams I
nlKMGAN'S MROGRE55 oeneral offices 1946 West Pernell Road, Jackson, MI 49201 * (617) 788 0660 f
October 19, 1989 t-I Nuclear Regulatory Commission Document Control Desk e
L Washington. DC '20555-DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -
.I REQUEST FOR DELAY OF RESPONSE TO-INSPECTION REPORT 89-015 By letter dated September 19, 1989 the commission provided Consumers Power Company (CPCo) with Inspection Report 89-015 which contained various concerns / questions dealing with the 1989 Integrated Leak Rate Test (ILRT) at Big Rock Point and requested a response by October 19, 1989. On Monday, October 16.-1989 CPCo personnel met with Region III staff to discuss the ILRT j
issues. As a result, the Inspectors have requested additional data and information~be sent for their review to permit further evaluation. As discussed in the meeting, this request will require additional time for drafting of the report response.
Consumers Power Company intends on submitting a response to the ILRT concerns contained in Inspection Report 89-015 by November 1, 1989.
In addition, resolution of the inspection concerns will result in a delay in submittal of l
the 1989 ILRT Report required by Appendix J.
This report will be submitted by i..
. December l',
1989.
I hub I.
J Daniel Eddy p
Plant Licensing Engineer L
CC Administrator, Region III, USNRC 1..
NRC Resident Inspector - Big Rock Point 1
l 8910240031 891019 PDR ADOCK 05000155 Q
PDC l'
pol
.OC1089-0009-NLO2 i o e
l' A C&tS ENERGYCOMPANY
.-w