ML19325D412

From kanterella
Jump to navigation Jump to search
Application for Amends to Licenses NPF-4 & NPF-7,changing Tech Spec 3/4-7.6 to Add Flood Control Dyke Around West End of Unit 2 Turbine & Svc Bldgs
ML19325D412
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 10/13/1989
From: Stewart W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19325D413 List:
References
89-480, NUDOCS 8910230236
Download: ML19325D412 (3)


Text

__ _

S i

. t

RICHMOND, VIRGINIA 23261 f

I october 13, 1989 i

i U. S. Nuclear Regulatory Commission Serial No. 89 480 Attn: Document Control Desk NO/TAH/DAO:Jmj Washington, D. C. 20555 Docket Nos. 50 338 50 339 License Nos. NPF 4 NPF 7 Gentlemen:

VIRGINIA ELECTRIC AND POWER COMPANY NORTH ANNA POWER STATION UNITS 1 and 2 TECHNICAL SPECIFICATION CHANGE REQUEST FLOOD PROTECTION T.S. 3/4 7.8 Pursuant to 10 CFR 50.90, Virginia Electric and Power Company requests an amendment in the form of changes to the Technical Specifications of the Operating Licenses No.

NPF 4 and NPF 7 for North Anna Power Station Units 1 and 2.

Virginia Electric and Power Company is adding a flood control dyke around the wcst end of the North Anna Power Station Unit 2 Turbine and Service Buildings to provide protection of safety related equipment and facilities. This was necessitated by a reanalysis of potential flooding conditions. In order to accommodate drainage of normal accumulation from within the dyke enclosed area, a drain pipe is provided through the dyke. During potential flooding conditions, this drain pipe must be isolated to prohibit j reverse flow of water into the enclosure and then into the Turbine and Service Buildings.

The proposed changes to the Units 1 and 2 Technical Specifications modify Action Statement 3 7,6 to require isolating the dyke drain pipe valve if the water level at the main reservoir spillway is above 252 feet Metn Sea Level. The Surveillance Requiremont 4 7.6 is changed to reduce the normal surveillance interval for measuring the reservoir level, from 24 to 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br />, and the reservoir level at which the level surveillance frequency is escalated from once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> to once per 2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />,is educed from 255 ft. above Mean Sea Level to 251 ft.

The proposed changes are provided in Attachment 1 and the Discussion and Basis for No Significant Hazards Determination in Attachment 2.

0, 0

'l

! C 38 t P PNU _

P

[

This request has been reviewed and approved by the Station Nuclear Safety and Operating Committee and the Safety Evaluation and Control Staff, it has been determined that the proposed changes do not involve an unreviewed safety question as defined in 10 CFR 50.59 or a significant hazards consideration as defined in 10 CFR 50.92, if you have further questions or require additional information, please contact us  !"

Immediately.

Very truly yours, '

J /)

N

f f

W. L. Stewart Senior Vice President Power Attachments: 1: Proposed Technical Specification Changes 2: Discussion of Proposed Changes and ,

Basis for No Significant Hazards Determination i cc: U. S. Nuclear Regulatory Commission '

101 Marietta Street, N.W.

Suite 2900 Atlanta, Georgia 30323 Mr. J. L. Caldwell NRC Senior Resident inspector i

North Anna Power Station Commission Department of Health Room 400 109 Governor Street Richmond, Virginia 23219 i

e -

M l 3 )

,' i i

COMMONWEALTHOFVIRGINIA ) l

)

COUNTYOF HENRICO )

The foregoing document was acknowledged before me, in and for the County and Commonwealth aforesaid, todey by W. R. Cartwright, who is Vice President - Nuclear, for W. L. Stewart, who is Senior Vice President -

Power, of Virginia Electric and Power Company. He is duly authorized to execute and file the foregoing document in behalf of that Company, and the statements in the document are true to the best of his knowledge and belief.

Acknowledged before me this /3Yday of /fr/vd ,1981 My Commission Expires: /d h m f5 ,19 90 J

_ kNJ $ Nan _

Notary Public (SEAL)

,