Informs of Change in Schedule for Repair of Fire Penetration Barrier Seal.Two Deficiencies Repaired Immediately.Licensee Committed to Complete Repair of Third Deficiency by 891016
ML19325D287
Person / Time
Site: Big Rock Point File:Consumers Energy icon.png
Issue date: 10/16/1989
From: Eddy J
CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910230015
Download: ML19325D287 (2)


Text

-

e J

@ 90WLRlNG Consumers Power A9EN8GAN5 PRDGRE55 oeneral officos: 1946 West Parnell Road. Jeek on, MI 49201 * (617) 788-0660 October 16, 1989 Nuclear Regulatory Commission Document Control Desk Washington, DC 20555 DOCKET 50-155 - LICENSE DPR BIG ROCK POINT PLANT -

CHANGE IN SCHEDULE FOR REPAIR OF FIRE PENETRATION BARRIER SEAL On August 8, 1989, Big Rock Point submitted Licensee Event Report (LER)89-006 describing several deficiencies found in' fire barriers and associated penetration seals. Two deficiencies were repaired immediately and a third, a penetration seal in the fire barrier separating the Electrical Equipment Room and Computer Room, was scheduled for repair.

The licensee committed to completion of this repair by October 16, 1989.

Subsequent to the licensee's submittal of the LER, further evaluation of methods of repair of the fire barrier penetration seal which separates the Electrical Equipment Room and the Computer Room was completed.

It was deter-mined that repairs to the fire barrier could not be safely completed while the I

plant remained in operation.

This is due to the difficult access to the area of the penetration seal and to the close proximity of numerous conduits and cables. The potential for inadvertent damage to conduits and cables during f

I fire barrier penetration seal repair was thought to be a significant risk to i

plant operation.

Therefore, Big Rock Point has scheduled repairs to the fire barrier separating the Electrical Equipment Room and the Computer Room to be completed at the first opportunity of a plant outage of sufficient duration to make the required repairs. One hour fire patrols, as required by Big Rock Point Technical Specification 3.7.12, will continue until repairs are completed.

i 8910230015 891016 PDR ADOCF: 05000155 l

F I'DC l

0 OC1089-0006-NLO2

[g A CA15 ENE7?GYCOMPANY

I 2

e-4;

  • " Nucl0cr R:gulatsry Cosmicsion Big Rock Point Plant

+

Fire Penetration Barrier Seal October 16, 1989 i

No significant safety concerns will result from the course of action described i

above. Compensatory measures required by Technical Specification 3.7.12 which consist of hourly fire patrols through the affected areas will continue until repairs are completed.- Each affected area is equipped with tonir.ation-type smoke detectors which are capable of providing an early warning of a' fire in' either area.

24 DON d J Daniel Eddy Plant Licensing Engineer I