Confirms 891012 Telcon Re Schedule Extension for Response to Insp Repts 50-348/89-19 & 50-364/89-19.Response Will Be Submitted by 891101
ML19325D111
Person / Time
Site: Farley  
Issue date: 10/12/1989
From: Hairston W
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910190018
Download: ML19325D111 (1)


Text

F

'{

i, t-I labama Power Company i

[/ *.'

A o '

40 inverness C:ntr Parkway

, Post Office Box 1295 Birmingham, Alabama 35201

+

Telephone 205 868 b581 t'

W. G Hairston, til

.. Senior Vice President Nuclear Operations AlabamaPower i

the souttern electnc system 7

I October 12, 1989 Docket Nos. 50-348 50-364 U. S. Nuclear Regulatory Commission ATIN:. Document Control Desk Washington, D.-C. 20555

{

(

Gentlemen:

Joseph M. Farley Nuclear Plant Schedulo Extension for Response to NRC Inspection Report By letter of September 12, 1989, the NRC requested Alabama Power Company to respond to NRC Inspection Report Nos. 50-348/89-19 and 50-364/89-19. This 4

response was requested by October 12, 1989..This letter is to confirm a telephone conversation between Mr. F. S. Cantrell of the NRC and Mr. J. E.

12, 1989..As discussed Garlington of Alabama Power Company on October in that conversation, Alabama Power Company will. respond by November 1,

.1989.

If you have any questions, please advise.

i 4'.espectfully submitted, hkl W. G. Hairston, III o

NGH/ REM:emb-25.26 cc: Mr. S. D. Ebneter Mr. E. A. Reeves Mr. G. F. Maxwell 750l a9201,ooie e,2012