Text
'
?l, n A[.n M'%'N' 4;
- TENNESSEE VALLEY = AUTHORITY CHdTTANOOGA. TENh.ESSEE 37401 9
V,"
5NL1578 Lookout Place 4
i_ C y D'
I 00T 101989
+
' ;U.S.lNuclearRegulatoryCommission
' ATTN: Documeat Contr'ol D' ek :
4 Washington, D.C._-20555 k
Gentlemen:-
- In-the Matter of
)
Docket Nos.'50-259-Tennessee Valley Authority-
)
50-260
, l' s <
50-296
~
BROWNS FERRY NUCLEAR-PLANT:(BFh) - MONTHLY-OPERATING REPORT FOR:THE MONTH Of b
, SEPTEMBER 1989 q
l? '
'f' n
- Infaccordance withs the requirements of-the BFN Technical Specifications (TS).
N
- section.6.9.1.3, TVA is.' submitting the Monthly Operating-Report
- for-the month of September 1989.
f
_'If-you havn any questions, please telephone Patrick P. Carter, BFN, m
1(205);7,29-3570,.
c 3.
9 Very truly yours, s
TENNESSEE VALLEY AUTHORITY b
3 Manager, Nuclear L censing and Regulatory Affairs i
Enclosure?
- r "
cc (Enclosure):
'~
!INPO Records Center Mr. Ted Marston, Director Institute of Nuclear Power Operations Electric Power Research Institute
'1100 Circle 75 Parkway; Suite 1500-P.O.. Box 10412 Atlanta, Georgia 30389 Palo Alto, California 94304 Mr. B. A. Wilson', Assistant Director
~Reglona1LAdministration U.S. Nuclear Regulatory Commission for Inspection Programs Offlce of Inspection and Enforcement TVA Projects Division Region II U.S. Nuclear Regulatory Commission 101 Marietta Street, NW, Suite 2900 Region II Atlanta, Georgia 30323 101 Marietta Street, NW, Suite 2900 Je g C
-Mr.'B. D. Liaw, Director l"
-TVA Projects Division NRC Resident Inspector
'One White Flint, North Browns Ferry Nuclear Plant 11555 Rockville Pike Route 12, Box 637 Rockville, Maryland 20852 Athens, Alabama 35609-2000
'cL e910170314 890930 UJ PDR ADOCK 05000259 An Equal opportunity Employer LI M!
<aLR PDC
,1 1
q M.ey g,A,g' g,7, 1
'My.
' ' c :.
]
v 1
'J,.
i.,. T T*
s, r.
. MONTHLY OPERATING REPORT?
BROWNS-FERRY NUCLEAR PLANT crn.
t TENNESSEE VALLEY AUTHORITY--
SEPTEMBER 1989' I
N if 4
{
g s
q DOCKET: NUMBERS 50-259, 50-260,.AND 50-296 6
- LICENSE. NUMBERS DPR-33, OPA-52,'AND DPA-68
-:.p 2
i 4
(
?
c i
-k.
{
t s
t j.1
?
l l
I e
^
n k
if b s ~ "; &
1 1
3;, ' n.f'-
OPERATIONAL
SUMMARY
h te ~'
SEPTEMBER 1989 Ei Life F
li M:
- UNIT 1 f,36
-../.-
~
[g'"p Unit remains on administrative' hold'to. resolve var 1ous1TVA:and NRC-concerns.
i
+
f 5
UNIT 2 aff
~
. Unit' remains on administrative told to resolve various TVA and NRC concerns.
Modification and' Operation & Maintenance work ~ continues to support restart.
I i
UNIT 3 Unit remainston administrative hold to resolve various TVA and NRC concerns..
\\.
s kc' 6
-l n
i t
t l'
' n
i g
f4 8
')-
_. ~,.
OPERATING DATA REPORI DOCKE1 NO.
50-259
< j, DATE" September 1989 COMPLETED BY S. A. Ratliff TELEPHONE ~(POS) 729-?937 OPERATING STATUS-l Notes l
1.
Unit ~Name: ' Browns Ferry Unit One l
l
- 2.. RC.3rting Perlod:
september 1989 l.
l
- 3..
Lleensed thennal Power (Nt): 3?93 l
l 4.
Nameplate Rating (Gmu Itte): _1152 l
l
. 5.
Design Electrical 5.
(Net ptie): 1065
-l l
6.
Mximum Dependable Capacity (Gross ptie):,,1,09p l
l
, 7.
Maximum Dependable Capacity (Wet pue): 1065 l
l 8.
If Changes occur in capacity Ratings (Items heter 3 Through 7) Since Last Report, Give Reasols:
N/A
- 9. ~ Power Level 10 Which Restricted, if Any (Net ptie):
___ N/A i
- 10. Reasons For Restrictions, if Any:
N/A This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 6551 159319
- 12. Number ot' Hours ~ Reactor Was Critical 0
0 59521
' 13. Reactor Reserve Shutdown ;iours 0
0 6997
- 14. Hours Generator On-Line 0
0 r8267
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross thennal Energy Generated (MI) 0 0
168066787 117. Gross Electrical Energy Generated (MI) 0 0
55398130
- 18. Net Electrical Energy Generated (MI)
-2593
-38740 53459991
- 19. Unit Service Factor 0
0 36.6
-20. Unit Availability Factor 0
0 36.6 21.' Unit capacity Factor (Using HDC Net) 0 0
31.5
- 22. Unit capacity Factc,r (Usin0 DER Net) 0 0
31.5
- 23.. Unit Forced Outage Rate 100 100 58.6
- 24. Shutdowns Scheduled Over Next 6 Honths (Type, Date, and Duration of Each):
N/A 25.'If Shut Down At End Of Report Period, Estinated Date of Startup: To be detennined s
4
p p
r R.
W' OPERAllNG DATA REPORT DOCKET NO.
50-260 i
DATE Septent>er 1989 COMPLETED BY S. A. Ratliff TELEPliONE (205) 729-2937 s
!OPERt.TINr. STATUS.
l Notes l
l..
Unit W es:
Browns Ferry Unit Two l
l
'2
-Reporting Period:,,,,, September 1989 l
3.
Licensed 1hennal Power (PWt): _3293
~l
. 4.
Nameplate Rating (Gross mie): 1152
'l l
.5.
Design Electrical Rating (Net PWe): 1065 l
l
' 7.
Maxican Dependable Capacity (Net PWe): 1065
_, j' l
6.
Maxlansu Dependable Caoacity (Gross PWe): _1098.4 l
l
-8.
If Changes Occrir in Capacity Ratings (Items Nunt>er 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
h)wer Level:To Which Restricted, if Arae (Net mie):
N/A
.:10. Reasons For Restrictions, If Any:
N/A i
r This Month Yr-to-Date Cumulative
- 11. liouts in Reporting Period 720 6551 154206
- 12. Number of Hours Reactor Was Critical 0
0 55860
'13. Reactor Reserve Shutdown Hours 0
0 14200
.i4. Itours Generator On-Line 0
0 54338
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thennal Energy. Generated (MI) 0 0
153245167
- 17. Gross Electrical Energy Generated (MI) 0 0
50771798
- 18. Net Electrical Energy Generated (MI)
-5%7
-27484 49024248
- 19. Unit Service Fcctor 0
0 35.2
- 20. Unit Availability Factor 0
0 35.2
.21. Unit capacity Factor (Using MDC Net) 0 0
29.9
=22. Unit Capacity Factor (Using DER Net) 0 0
29.9
- 23. Unit Forced Outage Rate 100 100 59.0
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
j N/A
- 25. If Shut Down At End Of Report Period, Estimated Date of Startup: Under Review q
1 l
h.: :; i ";... g _-
OPERATING DATA RIPORT q.
DOCKET NO.
50-296 DATE Septenber 1989 COMPLETED BY S. A. Ratliff 5
TELEPHONE (205) 729-2937 OPERATING STATUS' l Notes l
1.
Unit Name:
Browns Ferry Unit Thres l-
-l
- 2. -Reporting Period:
September 1929 l
l
- 3..- Licensed Therinal Power (Wt): 3293' 4.
Nameplate Rating (Gross We): 1152 i
5.
Design Electrical Rating (Net mie): 1065 l
l 6.
Nximum Dependable Capacity (Gross Mde): 1098.4 l
l 7.
Mximum Dependable Capeelty (Net We): 1065 l
l
. 8.~
If Changes Occur _ in Capacity Ratings (Items Nunber 3 Through 7) Since Last Report, Give Reasons:
N/A 9.
Power Level To Which Restricted, if Any (Net We):
N/A
- 10. Reasons For Restrictions, if Any:
N/A l
.l This Month Yr-to-Date Cumulative
- 11. Hours in Reporting Period 720 6551 136631
- 12. Number of Hours Reactor klas critical 0
0 45306 l
- 13. Reactor Reserve Shutdown Hours 0
0 5150 i
'14. Hours Generator On-Line 0
0 44195
- 15. Unit Reserve Shutdown Hours-0 0
0
- 16. Cross Thennal Energy Genurated (MI) 0 0
131868267
- 17. Gross Electrical Energy Generated (MI) 0 0
43473760
- 18. Net Electrical' Energy Generated (MdH)
-1875
-15934 41884153 19.' Unit Service Factor 0
0 32.3
-j
- 20. Unit Availability Factor 0
0 32.3
' 21. Unit capacity Factor (Using MDC Net) 0 0
28.8 l
- 22. Unit Capacity Factor (Using DtR Net) 0 0
28.8
- 23. Unit Forced Outage Rate 100 100 63.1
- 24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):
N/A i
25.:lf Shut Down At End Of Report Period, Estimated Date of Startur: To be detennined j
m;,;'
n,,.
gg/4; w.
a.
f girc.
o.N '
'..AVERAGEDAILY,llNIT[POWERLEVEL-C G
r DOCKET NO.
50-259 p
0:
UNIT-One
.b DATE 10/1/89-a COMPLETED BY S. A. Ratilff TELEPHONE (205) 72'9-2937 i
L' Ah MONTH-SEPTEMBER 1989
~ DAY'
. AVERAGE-DAILY; POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
- (MWe-Net).
1.17
-6 2-
-4'
.18.
-7 3.
4 19 =.
-5 l4:
-2 20
-5 5.
-2 21 5
6
' 2' 22'
-2 7-
-2 23
-4
- 8f
-2' 24
-3 9-
-2 25
-4 s
10
-2 26
-3 W
11-
-6 27
-3 12!
3 28
-2 "s.
.13:
-2 29
-3 14
-4 30
-3 15 :.
-6 31 4-
-6 y
9; w, R,c4
, g.
, = -
7 p
G}a:}~W,.:~,:,
d.f%
~. AVERAGE DAILY-ONIT POWER.LEVELL n
,4.
r i
DOCKET NO.
50-260-h..
t
[ 4.
L;P J
l Unit Two-p
~. n
.DATE 10/1/89 i
y
_ COMPLETED BYL S. A. Ratliff-N TELEPHONE-(205) 7,29-293?
- u-r, MONTH' SEPTEMBER'1989 7
i DAY-
' AVERAGE-DAILY POWER LEVEL
. DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1.
-9 17_
-7 x
,')'
2 18 7
i t
f
,3
-9' 19
-7 x
L l
c4-20-
-7 I,
t L
- 5;
-9 21
-6 r
- x s
.6; 22
-7 V
-. 7
-9' 23
-7 f;,
- 8
-8 24
-7 9'
-12 25
-6 y
10.
-4 26
-6 xt 11
-8 27
-8 12'
'7 28
-7 13-
-B 29
-8
.M
-8 30
-7 15
-8 31 16
-7
w,:
4. :+
c.
L:.<- w g,
m g-
- a AVERAGE DAILY UNIT-POWER LEVEL yy DOCKET NO.
50-296 n:
i r
+
[
'Jni t - _ Three s,
9 DATE
-10/1/89 d
COMPLETED BY-S.'A.'Ratliff-TELEPHONE; -(205) 729-2937
-n m
. MONTH SEPTEMBER :1989 -
i DAY;' 1AVERAGEDAILYPOWERLEVEL DAY AVERAGE DAILY. POWER LEVEL.
-(HHe-Net)
(MHe-Net) 11
.-3 17
-3 2l
-2^
18
-2 r.9 j -2' 19
-2 1
4
-2 20
--2 j
{
'S
-2 21
-2:
6
-2 22
-2 >-3' 23
-3 8'
- -2 24
-2 W'
- .]
n 9 >- '25.
-2
. n- -
3.
.l!
10
- 26
-1 Xa!
\\
[
- 11
--2 27
-4 I
pw r
- 12
' -7 28
-2 13
-3 29
-3
.+
.14~
-3 30
-2 s15
-3 31
- r -
,1
-16
-3
.: s
[ _
- .h 'ji[
[' j fpk
.p
- Q
~
- n
~* v
~-
r UNIT SMUTDOWNS AND POWER.REDUCTIt'95 s N RO:
M 9-
- 'ruAE ?4
<c
~ JW _
DATEt 1e/1/a9 Nr" '- W
.CR..;[
i UNIT-EM E!
Ann "
2
~~~
~...
?~
JREPORT 4) NTH: Sectapher 1989 COIrLETED BY:Si A. Emiliff f
Q; s-Ml
-TELEPMONE:(285) 729 2937 22:- -
Method of Licenseeo, Cause and Corrective:
Duration Shutting Down1 Event'.
Code' Code Prevent Recurrence
]_
System.
Component Action to' 3
No.
Date Type'
'(Hours)'
Reason
- Reactor 2'
8
~
Report.No.
s
_ i' L
315 06/01/85 F
-; 745 '
,F.
^ 4
' Administrative hold to 1 resolve various TVA and f-NRC concerns..
e l
1_
-~
i
'F: Forced Reason:
'Hethod:
- Exhibit G-Instructions 2
^
S: Schedu?ed A-Equipment Failure (Explain) 1-Man;;al for Preparation o' Data B-Maintenance or Test 2-Manual Scram Entry sheets for Licensee C-Refueling 3-Automatic Scram-Event Report (LER) File.
0-Regulatory Restrictiors 4-Continuation of Existine O'staee.
-(NUREG-061)
E-Operater 1 ?ining and License Examination 5-Reduction-F-Administrative 9-Other G-Operation'il Error (Explain) 5Exhibit I-Same Sotree H-Other (Explain) e e
s 9
a
i..- - a;
.v e:;
- t
~
i -4 :
~
,-,. DOCKET NO:
so-2sg -
+
-. r*[ i *id ' T'n _
'J
- ~'
u f
.c;
".w.
t-
~~
- UNIT
- $HUTDOWNS'AND POWER. REDUCTIONS ^--
1 UNIT NAME:-
Tim
_f-
.> +.
~
DATE:-
to/1/a9
" j.;t'.
_ Q9
- REPORT MONTM: September 1989
< COMPLETED BY:1.'A. RatlifF' T
JTELEPHONE:(2951 729-2937 c C'-W
~
sMethod of.
ticensee
~CauseandCorrective.:l['
~
s-Duration Shutting DownL Event:
- System i Conconent Action to-
~
i 2
No.
Date Type
'(Hours).
Reason Reactor 3 Report No..
Code *-
Code Prevent Decurrence -
5 305
09/15/84 F
745'
.F'
'4 '
' Administrative hold to
~
resolve various TVA and NRC concerns.
'F: Forced Reason:
Method:
" Exhibit G-Instructions 2
S: Scheduled A-Ecolpment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram
- Entry sheets for Licensee C-Refueling 3-Automatic Scram
. Event Report (LER) File D-Regulatory Restriction
'4-Continuation of Existing Out*ge.
E-Operator Training and ticense Examination S-Reduction F-Administrative 9-Other G-Coerational Error (Explain)
.sExhibit I-Same Source H-Other (Explain)
~
1 4
p e
9 9
t u.
~
mo'.
. 1-m m.__.m.m_-m
z:--
,. g:,
yz x m
.7-n-
-.:vv.ng- --
+
.'ggg
--:y;_
~
,9
{,
5 gg.
+
9 UNIT' SHUTDOWNS AND POWER REDUCTIORS i C
7 Daft:2 1/no
'1j'~
LUNIT NAME; Threm
~
~ ~
-m-
'~
s,.
REPORT fetT": ' Sentendner 1989 ':
.. COMPLETED BY:1--A. Ratliff;p *
~ :%~'-
- TELEPHONE
- f2es) 729-2937 Method of.
Licensee :-
Cause and Correctise-'
~
Duration
. 2 3
5 Shutting Down-
.Evant System ~
Component
- Action to'-
H No.'
Date Type' (Hours).
Reason.
. Reactor Report No '
. Code
- Code Prevent Recurrence 157 03/03/85 F
745 F-
,4 Administrative hold to resolve various TVA and NRC concerns.
- ?
s 4
s I.
'F: Forced Reasua:
Method:
" Exhibit G-Instructions-2 8
S: Scheduled A-Equipment Failure (Explain) 1-Manual for Preparation of Data,-
B-Mair:tenance or Test 2-Manual Scram
.Ertry sheets for LicenseeJ C-Refueling
'3-Automatic Scram-Event Report (LE ) File-D-Regulatory Restriction 4-Continuation of Existing Outage.
E-Operator Training and License Examination-5-Reduction F-Administrative 9-Other G-Operational Error (Explain)
. sExhibit I-Same Source H-Other (Explain) l D
6 I
,w
=+i y emj -.
y 9
%e'.y-#'
y stua..g.g y
e
,w,.g e
>iyi-g, g
--..pg.
g w
y' g
- W*
h 5-Yg*