Notice of Nonconformance from Insp on 890718-21. Nonconformances Noted:Nonconformance Rept Not Initiated to Document That TRC Model 88 RR PORV Failed to Meet Opening & Closing Times & Corrective Actions Not Documented
ML19325C812
Person / Time
Issue date: 10/12/1989
From:
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19325C809 List:
References
REF-QA-99900060 NUDOCS 8910170294
Download: ML19325C812 (2)


Text

0

' Target Rock Corporation Docket No.:

99900060/89-01 East Farmingdale, New York'.

APPENDIX A NOTICE OF NONCONFORMANCE During an inspection conducted on July 18-21, 1989, the implementation of

.the quality assurance (QA) program at the Target Rock Corporation (TRC) facility in East Farmingdale, Long Island, New York was reviewed. - The results-of the inspection revealed that certain activities were not conducted in accordance with NRC requirements. These items are set forth below and have

-been classified as a nonconformance with the requirements of Appendix B to 10 CFR Part 50 which were imposed on TRC by various purchase orders.

A.

Criterion II, " Quality Assurance Program," of Appendix B to 10 CFR 50, requires, in part, that a quality assurance program which complies with 10 CFR 50, Appendix B, requirements be implemented during the produc-tion of safety-related components. The following examples indicate that the TRC QA program has not been implemented in several areas:

1.

Criterion XV, " Nonconforming Materials, Parts or Components," of Appendix B to 10 CFR 50 requires you to establish measures to con-trol materials, parts, or components which do not conform to requirements.

Contrary to the above:

a.

A nonconformance report (NCR) was not initiated to document that a TRC Model 88 RR power operated relief valve (PORV) 1' failed to meet the opening and closing (89-01-01) times specified in the h

customer's technical specifications.

.b.

An NCR was not initiated to document that two TRC Model 82-UV-001 PORVs failed to open on demand during hot functional tests at the Watts Bar Unit I nuclear power plant.

(89-01-02) l 2.

Criterion XVI, " Corrective Action," of Appendix B to 10 CFR 50 i

requires the identification of significant conditions adverse to quality, the cause of the condition, and the corrective action taken to be documented and reported to appropriate levels of management.

Contrary to the above, the corrective actions taken to correct conditions adverse.to quality, such as items reported as 10 CFR Part 21 reports, were not documented and preserved in an auditable manner. Furthermore, you failed to implement the corrective action outlined in your letter dated October 19, 1983.

(89-01-03)

L 3.

Criterion V, " Instructions, Procedures, and Drawings," of Appendix B to 10 CFR 50, requires activities affecting quality to be prescribed by documented instructions, procedures or drawings and to include acceptance / rejection criteria.

8910170294 891012 PDR GA999 ENVTARG 99900060 PNU

,c-w]y,

,p.(

i i

i e

u Target Rock Corporation Docket No.: 99900060/89-01 i

East Farmingdale, New York-w J

Contrary to the above:

- a.

A checklist'used to document the results of the. acceptance l

tests performed on July 19, 1989, on the PORV intended for J

Palisades nuclear power plant, did not contain the acceptance

]

criteria-specified in the respective purchase specification.

(89-01-04).

b.

Activities related to electrical solder joints were performed on Class.1E-wire harnesses without the benefit of a written rocedure, resulting in Washington Public Power Supply System p(WPPSS) receiving 17 safety-related electrical wire harness replacement kits with defective solder joints. WPPSS reported this matter as a 10 CFR Part 21 item in a' letter dated

~

May-19, 1989.

(89-01-05) 4.

Criterion VI, " Document Control," of Appendix B to 10 CFR 50, requires you to establish measures to control the issuance of documents, such as instructions, procedures, and drawings, including changes'thereto, which prescribe all activities affecting-quality. These measures shall also assure that documents, including changes, are reviewed for adequacy and approved for release by authorized personnel.

Contrary to the above, General Weld Procedure Specifications (GWPS) i andJointWeldProcedureSpecifications(JWPS)wereusedin 1.

h production welding without having valid. signatures, including dates of--approval, to indicate the GWPS and JWPS were reviewed by indi.

L viduals other than those who prepared them. This iteir was previously identified as a nonconformance in Inspection Report 99900060/83-02.

(89-01-06)

L 1

-.