Monthly Operating Rept for Sept 1989 for Jm Farley Nuclear Plant
ML19325C511
Person / Time
Site: Farley 
Issue date: 09/30/1989
From: Hairston W, Dennis Morey
ALABAMA POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910160329
Download: ML19325C511 (5)


Text

' $1.f

~

. l y; ?
  • Alabama Power Company 40 inverness Center Parkway t

Ja

. Post Oftee Box 1295 L Birmingham, Alabama 35201 Telephone 205 868 55B1 j

I W, G. Hairston,111 D

.h Senior Vice President I'f Nuclear Operations AlabamaPower October 13, 1989 f* 80uftwn dectre sysem j

'l 1

I i

L Docket No. 50-364

i s c

-J U. S. Nuclear Regulatory Commission ATIN:= Docunent Control Desk i

Washington, D. C.

20550 t

)

Joseph M. Farley Nuclear Plant Unit 2 Monthly operating Data Report i

Attached is the September 1989' Monthly Operating Report for Joseph M.

Farley Nuclear Plant Unit 2, required by Section'6.9.1'.10 of the Technical l

Specifications'.. Revision 8 of the Offsite Dose Calculation Manual (ODCM) for the Joseph M. Farley Nuclear Plant is included with the Unit 1 Monthly-Operating Data Report for the month of September.-. Submittal of the ODCM is' in accordance with the requirements of Section 6.9.1.10 of the Technical i

l specification.

If you have any questions, please advise.

Respectfully submitted, 1.

W l-W.

its on, III D

p JG3:sme/1.6 Attachment cc:

Mr. S. D. Ebneter L

Mr. E. A. Reeves l

Mr. G. F. Maxwell 1

l l ~~

I-J QOlg[k hi a

r,

l'

~

-1 e

s 1

W--

g m.',

4

.li * ;

~

n

'.5'

.s.

a l.., :

7' -

x-ne t

JOSEIH M. FARLEY NUCLEAR PIMf

' LNIT 2 h.

NARRATIVE SlPNARY OF OPERATIONS 7

September, 1989

,3

%ere was one.significant power reduction ard one unit shutdown during the

,,y mondi of September. ' At 0233 on September 20, power was redumd to

~

appmximatcly G0t to rejair an elect.ro-hydraulic fluid leak on the low pressurs governor valve.of the 2B steam generator feedwater-pump (SGFP).

- At.'0722 on Septem1er 20, the reactor was nanually tripped following the q

. loss of the 2A SGFP. %e 2A' SGFp turbine tripped due to s low auto-stop -

Q-

. oil pressure signal. %is signal was generated when a worker inadvertently :

lxanped the.overspeed trip test valve lever ard the valve opened. %e unit -

returned:to power operation at 2003 on September 26.

f The following najor' safety-related maintenance was performed in the month.

D of September!.-

i 1.

% e 18-month overhaul.of the 2c diesel generator was performed.

i a-

'2.

% e 2A waste gas compressor was repaired.

3.

The '2B ch_arging ptmip room cooler uns repaired.

L4.

The' 2A service water pump was relmilt.

.5.

.A lody-to-tonnet leak on the RCS "A" lwp RTD nanifold return i

isolation valve was repaired.

> G. :. %e 2B auxiliary building Inttery charger was repaired.

7.

Miscellaneous' corrective and preventive i.aintenance was perfornwxl on the diesel generators.

8.' A lxdy-to-lonnet leak on ILY 460 (letdown isolation valve) was repaired.

m

-i

?

^

h B

i b

1

~

j 1

N Dhm M DOCKET No. 50-364 n

Dh5 10/3/89 j

CCMPERRE BY _ D. N. Morey HLEPIKIE (205)899-5156 p

WWlhTDKi 815GUB

)

Notes

1. Unit Name:

Joseph M. Farley - Unit 2

'2. Reporting Period:

September, 1989

1) Cumulative data since j
3. Licensed mermal Power (left):

2,652 7-30-81, date of 2

4. Nameplate Rating (Gross.See):

860 commercial operation S. Design Electrical Ratint (Net Pele): 829

6. Maximum Dependable Capa:ity (Gross IEe):

870.3

7. Maximam Dependable Capacity (Net MWe):

829.7

8. If Changes Occur in Capacity Ratings (Items Number 3 mrough 7) Since Last Report, l

Give Reasons:_ N/A l

9. Power Level To Which Restricted, If Any (Net MWe):

N/A

10. Reasons For Restrictions, If Any:

N/A U[

his Month Yr-to-Date Camulative

11. Hours In Reporting Period 720 6,551 71,640
12. Number Of Hours Reactor Was Critical 593.5 5,035.8 61,713.7
13. Reactor Reserve Shutdown Hours 0.0 0.0 138.0
14. Hours Generator On-Line 563.3 4,895.7 60,928.3
15. Unit Reserve Shutdown Hours 0.0 0.0 0.0
16. Gross hermal Energy Generated (MNH) 1,456,223 12,422,788 154,620,424
17. Gross Electrical Energy Generated (MNH) 473,132 4,063,154 50,798,640
18. Net Electrical Energy Generated (MNH) 444,844 3,839,140 48,164,426

-20. Unit Availability Factor 78.2 74.7 85.0

19. Unit Service Factor 78.2 74.7 85.0
21. Unit Capacity Factor (Using MDC Net) 74.5 70.6 82.2
22. Unit Capacity Factor (Using DER Net) 74.5 70.7 81.1
23. Unit Forced Outage Rate 21.8 5.4 4.7
24. Shutdowns Scheduled Over Next 6 Months (Type, Date, and Duration of Each):

N/A l

25. If Shut Down At End Of Report Period, Estimated Date of Startup: N/A
26. Units In Test Status (Prior to Commercial Operation):

Forecast Achieved l

INITIAL CRITICALITY 05/06/81 05/08/81 INITIAL ELECMICITY 05/24/81 05/25/81 OC3WEERCIAL OPERATICM 08/01/81 07/30/81 Forn 2/30

,,g..

IOCKET to.

50-364 p

LMIT 2

op M TE OCTOBER 3, 1909 CCMPLETED BY D. N. Morey TELEPHONE (205)899-5156 MONTH September l

MY AVERAGE MILY POWER LEVEL MY AVERAGE MILY POWER LEVEL fitfe-Net)

(M4e-Net) 1 821 17 834 2

821 18 834 3

821 19 835 4

825 20 178 5

829 21 0

6 828 22 0

7 825 23 0

8 824 24 0

9 825 25 0

10 825 26 0

L 11 825 27 386 12 826 28 823 13 827 29 827 14 824 30 822 15 823 31 i

16 800 INSTRUCTICNS l

On this format, list the average daily unit power level in M4e-Net for each day in l-the reporting month. Conpute to the nearest whole megawatt.

l Form 13/21

v

.ju "

.. ~.

'5@,

_x~

UNIT SWUT90We AND Fousk Es35CrIoss '

SOCs3T 90.

W 364

'j'4'

' WBZr WafE J. M. FRGiAr - M 3 mars ocu ssa 2, 1 m conrinns er

o. s. nuest asseur seers sa m nese name.ams t res tm-us6 q

i Ll.

i i

I' 1

I I nsrmon or i L2c =sts !

I I

caess a commscr!,s I

I I

I courrow - 1 I severrn i avswr i srsten I co w e er 1

Aceros to i

luo.

Iam I rres* l - -:

i meAsow 1 no== msAcrom I asseur e - I cons *. Icoes' I

res,ser esco es 1.

2 5

l--

1 I

I I

I I

I I

I I

I 008 l 890G20 l

F.

I 156.7 l.

s 1

2 l 89-019-04 l Js 1

F l Se reactor mes seeme11y tripped following the l

l 1

I I

I I

I I

I i lea et the operati=, ste== 9 =or.t.c fe.d et.r I

i i

i i

l I

. I I

I I

I r=r (sorts. The mFe==rhi=e trier d me t

=1 1 I

I I

I I

I i

1-1 1.- e.te-.t., oil pre.

re.4, 1.

ni..i, 1 -1 I

I I

I I

I I

I I

I== wr=ted =h=

= =orker i=edartat1r I-1 I

I I

i-1 I

i l

i w tw===,eed trip test al= 2=r =4 I

I I

I i

i i

1 i

i i tLe a2= or=ed-who i= divi *=1 i=1=4 in I

I 1

i i

1 i

1 I

I I thi.

t.e.em.elw.

26...ec.,o.d tes, I

I I

I I

I I

I I

i test 1 m r hu been restraised to pre m t

~l 1

I I

I I

I I

I I

I ine*ereont 09 -i=,.

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I I

I i

1 1

I l

i I

I I

i 1

1 I

I I

I I

I I

I I

l-1 I

I i

i i

i i

i i

l i

I i

I i

I i

i i

i 1

I i

i i

l i

i l

i i

i i

i i

I i

i i

I I

I i

i I

i i

I i

i i

i I

I 1

I I

I I

I I

I l

I I

I I

I I

I I

I I

I I

I IF: Forced Reason:

Mothed:

szkibit G-Instructices j{

3: scheduled A-ageipment Failure (saplain) 1-Memmal for Properatlee of Date B-Reintenesco or rest 2-Memeal Scree.

satry Sheets for Licensee C-mefooling 3-Aetonatic Scree.

sweet Be, ort (LER) File (psRSS.

D-Regulatory Restriction 4-Cther (szplain) 9161) s-operator Training a License saamination F-Administrative sahibit I -Sees Source G % rational stror (szplain)

(9/77) 5-Other (suplain) i M Rxa M i

,-w

.=v

,, =. -

~,,,4.,

-r e--

w w

..-.--,ee ws

-