Provides Clarification of Pressurizer Sleeve Insp Plans,Per 890925 Commitment.Insps Will Be Performed to Detect Evidence of Leakage at Unit 1 Pressurizer Vessel Heater Sleeves & Instrument Nozzles
ML19325C298
Person / Time
Site: Calvert Cliffs 
Issue date: 10/02/1989
From: Creel G
BALTIMORE GAS & ELECTRIC CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 8910160032
Download: ML19325C298 (2)


Text

_ _

I s

0:4:

g z(

M-go. e

  • l, y

BALTIMORE a

-GAS,AND CHARLES CENTER.P. O, BOX 1476 BALTIMORE, MARYLAND 21203

. Geomoc C. CatcL 1

Viet Passetur-Nwctran tutmov i

(son eso est.s October 2,1989

'd U. S. Nuclear Regulatory Commission

Washington, DC 20555 q

6 ATTENTION:

Document Control Desk

SUBJECT:

' Calvert Cliffs Nuclear Power Plant Unit Nos. I- & 2; Docket Nos. 50-317 & $0-318 Clarification of Unit 1 Pressurizer Sleeve insnection Plans l

n

REFERENCES:

(a) Letter from Mr. G. C. Creel (BG&E) to NRC Document Control l

Desk, dated September 20,
1989, Submittal of Basis for Determination e

(b) Meeting between Pressurizer Project Team (BG&E) and NRC Staff,

u dated September 25, 1989 Discussion of Basis for Determination Gentlemen

- At the meeting held on September 25,1989 (Reference b), we discussed our Basis for

' Determination (Reference a) that Unit I can be safely operated. During this meeting we

.,~

stated that we would provide you a letter detailing our future inspection plans for Unit. 1, including how the inspections will be performed, the periodicity of the inspection and the exceptions to performing the inspections, Our inspection plans are as follows:

i

[

In addition to the examinations required by Technical Specification 3/4.0.5, the following inspections will be performed to detect evidence of leakage at. Unit 1 Pressurizer' Vessel Heater Sleeves (120) and Pressurizer Vessel Instrument Nozzles (7):

y.

1..

During each reactor shutdown where HOT STANDBY (MODE 3) condition is reached and a COLD SHUTDOWN (MODE 5) duration of 7 or more days is not anticipated, a visual exam (as described in ASME XI IWA-2212) shall be performed to detect evidence of leakage. The exam shall be performed' from a location that will directly view the visible portion of g

l the pressurizer heater sleeve, the insulation and insulation seams around the penetration point. This exam need not be performed if an examination

[

was performed within 30 days prior to the shutdown.

8910160032 891002 l

PDR ADOCK 05000317

[/h PDC

[p i

p s

.q.

  • Document Control Desk o

4 m

. October 2,1989

' Fase 2

s; 2.

During each reactor shutdown where a COLD SIIUTDOWN (MODE 5) duration of 7 days or more is anticipated, a visual exam (as described in ASME-' XI lWA-22il) shall be performed to detect evidence of leakage by viewing each penetration region for boron deposits. This exarn need not be performed if an eram of this type was conducted within the previous 6-month period. This exam shall be performed at least once per 18 months.

Should you have any further questions regarding this matter, we will be pleased to discus 2 them with you.

Very truly yours, f,s

'd

.9C "p G. C. Creel Vice President - Nuclear Energy GCC/JMO/ dim cc:

D. A. Brune, Esquire J. E.

Silberg, Esquire W. R. Russell, NRC L. E. Tripp, NRC J. R. Strosnider, NRC

11. J. Kaplan, NRC R. A.Capra, NRC S. - A.McNeil, NRC R. A.Hermann,NRC C. D. Sellers NRC V. L. Pritchett, NRC T. Magette, DNR

-