ML19324C456
| ML19324C456 | |
| Person / Time | |
|---|---|
| Site: | Millstone |
| Issue date: | 10/31/1989 |
| From: | Elms A, Scace S NORTHEAST NUCLEAR ENERGY CO., NORTHEAST UTILITIES |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| References | |
| MP-13697, NUDOCS 8911170119 | |
| Download: ML19324C456 (5) | |
Text
~
,1 i
M General Offices
- Seleen Street. Berlin. Connecticut
'* 7O# yin swe~
P.0, BOX 270 r
a.
ew eei= %e. cw=
HARTFORD. CONNECTICUT 06141-0270
[$ [,'gg8,"",
(203) 665 6000 L
L t
November 6, 1989 MP-13697 I
Re: 10CFR50.71(a)
U.S. Nuclear Regulatory Commission Document Control Desk l
Washington, D.C.
20555
Reference:
Facility Operating License No. NPF-49 f
Docket No. 50-423 Dear Sir In accordance with reporting requirements of technical specifica-tions Section 6.9.1.5, the Millstone Nuclear Power Station - Unit 3 Monthly Operating Report 89-11 covering operation for the month of October is hereby forwarded.
Very truly yours, NORTHEAST NUCLEAR ENERGY COMPANY l
. (
A l
Ste h n E.
Sc ce Station Superintendent Millstone Nuclear Power Station Attachment cc: W.T. Russell, Region I Administrator W.J. Raymond, Senior Resident Inspector, Millstone Unit Nos. 1,2 &3 D.H. Jaffe, NRC Project Manager, Millstone Unit No. 3 8911170119 991o33 pgy gDR ADOCK 05o00423 PDC i
g l
- IRC O!!!AtlpG SfATOS tiP0tf C08Filf tD !! !!ACf01 IBG!N!!!!IG :::::::
- 1. D00!if.... 50 423-Of!!AtlpG$f1103
- 2. REP 0tfilG fit 10D.. 00f0 Bit 1989 001 AGE +Outlit 10015..
0.0 +f45.0 :145.0 t
- 3. OflLiti C0ffACf.................A. L. ILB3 203 444 5388 I'
- 4. LICtISID TIttB AL ?0 Nit......................................... 3 411
- BILLSf0pt*
- 5. RAutFLAf t RAtlpG (GROSS 86t )................................... 1,253 IV 05173 L
- 6. DESIGI ILICf tlCAl, I AfilG ( plf IWE)............................ 1,153.6
(
1, RAI! BOB DEFIRDAllt CATAClff (GROSS BWI)........................
1,184.2
[
- 8. BA!!I0E Dti!IDABLt CAlltiff (It! BWI)..........................
1,131.0
- 9. IF CEARGl$ 00001 AB0ft Slict LAST IIFO!!, !!AS0ES Alt.....
I/A 10.POWIIlif!LTOWHICIIISit!Cf!P,IFAIT(plfput)...............R/A 11.!!AS0RFORttsfilCfl08,IFAlf...1/A B0ffi
!!AtTODAft CC30LAfiftTODAft I
!!.10CISIIIIP0tf!BGFit!0D 745.0 1,216.0 30,912.0
- 13. ICE!!I0F100tS781!!ACTORWASCliflCAL 745.0 5,452.6 24,412.4 14.!!!Cf01!!S!!TtSIDTDONFB00tS 0.0 29.0 723.9 15,50015 Giltlif01OHLift 145.0 5,375.1 13,922.3 16.tilf!!SilftSEUtlat200t$
0.0 0.0 0.0 17.GROSSfittlltIIIRGIGli!!ATID(EWI) 2,503,05!.0 17,651,552.0 79,199,693.4 18.GROSSELECillCAl,IllRGTGilllAftD(HWE) 858,645.0 6,019,186.5 27,219,180.0 19, 5tf ILICfilCAL tittGT G!st!Af tD (BWI) 823,719.5 5,737,981.9 26,016,243.8 20.DilfStiflCIFACf01 100.0 13.7 77.4 21.UlltATAILA!!LiffFACTOR 100.0 13.7 ff4
!!.DilfCAPAC!ffFACTOR(US!IGEDCE!!)
97.2 69.2 13.1
- 23. 071f CAPACiff FACf01 (DSlpG L!t Iff) 95.8 (8.2 13.0 I
- 14.DiffFORCID001AGIIAtt 0.0 8.0 9.2 25.011fFORCIDDVfAGIE00tS 0.0 468.2 2,416.2 SIOfDOWISSCIIDDLIDOft!I!!!S!!B0ifES(ff?!,IAft,ANDD0taf!050F1108).............
R/A IFC0it!NTLTSHUfDOWI,ISflElf!DStilf0PDAft...I/A L.
v s -
. yg,.,.c
.v; 0 ', '%'
, lg 4
s.-
Y,,,. -
' AVERAGE 1%ILY INIT KWER LEVEL 4
DOCKET NO.
50-423 (NIT tiilintnne tinit 3-
" ~
DATE 11-01-1932 f
OCHPLETED BY 1. L. ft.u.c tes.4441368'-
W' f
'['
!!KNTH OCTLTER, IRY AVERAG6 DAILY KMER LEVEL IRY-AVERAGE DAILY K MER LEVEL (MWE-NET)
(MWE-!ET) i
,.1 1.130=
16 1.126-2 941 17 1.121 3
781 18 1.121
'4 1.124
-19
- 1 A84 5
1.124 20 1.123 6
1.12G 21 1.123 7
__ 1 122 22 1.123 8-1.125 23 1.122 9
1.128 24-1.125 10
'1.127 25 1.127 11 1.125 26
- 1.127
' I-r -
12 1.124 27 1 125 13 1.124 28 1.127 t
14~
~1.123 29 1.128 15-1.124 30 1.127_
31 1.128 m
J 1
a
1 4
DOCKET NO. 50-423 UNIT SHUTDOWNS AND POWER REDUCTIONS UNIT NAME FL. 'Ix1uur 3 OCTOBER 193S_
DATE 1:.-02-89 COMPLETED BE A.
EIMS TELEPHONE (203) 444-5388 No.
Date Type Dura-Reason Method of Licensee System Component cause and Corrective (1) tion (2)
Shut down Event Code Code Action to Prevent Hours Reactor (3)
Rept No.
Prevent Recurrence NONE 1: F-Forced 2: Reasons:
3: Method 4: Exhibit G - Instructions S: Schedules A-Equipment Failure (Explain) 1-Manual for Preparation of Data B-Maintenance or Test 2-Manual Scram Entry Sheets for Lic9nsee C-Refueling 3-Automatic Scram Event Report (LER) File D-Regulatory Restriction 4-Continued from (NUREG-Ol61)
E-Operator Training 8: License Exam previous month F-Administrative 5-Power Reduction 5: Exhibit 1 - Same Source G-Operational Error (Explain)
(Duration = 0 9-Other (Explain))
H-Other
REPUELING INFORMATION REQUEST l
e c e, OCTOBER 1989 i
l 1.
Name of facility: Millstone 3.
2.
Scheduled date for next refueling shutdown:
November 17. 1990.
i r
3.
Scheduled date for restart following refueling:
J,gnuary 15. 1991 l
4.
Will refueling of resumption of operation thereafter require l
a technical specification change or other license amendments?
H/A l
5.
Scheduled date for submitting licensing action and supporting l
information.
ULhz 6.
Important licensing considerations associated with refueling, l
o.g.,
new of different fuel design or supplier, unreviewed design of performance analysis methods, significant changes in fuel design, new operating procedures:
HZA 7.
The number of fuel assemblies (a) in the core and (b) in the spent fuel storage pool:
(a): 122, (b): 11.Q
{
8.
The present licensed spent fuel pool storage capacity and the sir.e of any increase in licensed storage capacity that han been requested or is planned, in number of fuel assemblios:
i Er9sent size - 756.
No increase reauested.
9.
The projected date of the last refueling that can be dis-charged to the spent fuel pool assuming the present licensed capacity:
End of cycle 5.
t
__