Text
e, W 7
4 e
'. 6 b
?'
'WisconsN oElectnc PCwER COMPANY -
231 w McNoooo Box 2cn maokee.wi 53201 Mu)2212345 i
t f
VPNPD-89-57 6 NRC-89-138 t
November 6, 1989 U.S. NUCLEAR REGULATORY COMMISSION Mail-Station P1-137 Document Control Desk Washington, D.C. 20555 Gentlemen:
l DOCKETS 50-266 AND 50-301 RESPONSE TO NRC COMPLIANCE BULLETIN 88-10, SUPPLEMENT 1 NONCONFORMING MOLDED CASE CIRCUIT BREAKERS POINT BEACH NUCLEAR PLANT, UNITS 1 AND 2
+
This letter is in response to NRC Compliance Bulletin 88-10, Supplement 1.. It supplements our previous response to Bulletin 88-10 contained in a letter to you dated March 30, 1989.
Based on the NRC positions delineated in the Supplement, the following information is provided:
- Position #4 indicates that all identified molded case circuit breakers (CBs) found to be nontraceable during the review conducted for Bulletin 88-10 and installed, regardless of date, need to be evaluated as to their acceptability.
As a result of further review we have identified one such CB that was installed in a QA scope' application prior,to' August 1, 1983 (date used as a cutoff for the original response to the Bulletin).
Attach-ment 1 provides data on this CB including the number identified, manufacturer, model number, system in which it is installed, i
and,to the extent possible, the procurement chain.
Additional information useful to Wisconsin Electric but not required by the Bulletin is also included.
Note that the item number is a continuation of those used for the March 30, 1989 response to the Bulletin.
A justification for continued operation (JCO) is being prepared for this CB.
The CB will be replaced prior to the end of the respective unit 1990 refueling outage.
[
- Position #7 provides information as to what constitutes acceptable traceability of safety-related CBs.
Wisconsin Electric has procured QA scope CBs by various methods.
Those procured as safety-related have met the requirements delineated in position
- 7 of the supplement, or have previously been identified as nontraceable CBs in our March 30, 1989 response.
CBs procured 8911150113 891106 gf PDR ADOCK 05000266 Q
PDC l
i g
A suMHm onlinwm EmygOxpn&w
- Document Control' Desk November 6, 1989 Page 2 4
as non safety-related, but used in QA scope applications have had-their traceability verified by certification and appropriate procurement or shipping records.
With the clarification of the above comments, our March 30, 1989 response to you adequately addresses the provisions of Bulletin 88-10 including the clarifications provided in Supplement 1.
No further action or response is necessary.
Please contact us if you have any questions concerning this letter.
Very truly yours, (l&V l C. W.
Fay Vice President Nuclear Power smp Attachment copies to NRC Resident Inspector NRC Regional Administrator, Region III Subscribed a i
I, b day of
_bm fu n;nd sworn to before me th s
, 1989, tD
%ocus Notary Public, State 6FWisconsin My Commission expires f-2 7-9 6 t
l l
6 W
s.
WISCONSIN ELECTRIC POWER COMPANY F0 INT BEACH NUCLEAR PLANT UNITS 1 AND 2 REVIEW DATA SHEET - SUSPECT MOLDED CASE CIRCUIT BREAKERS Installed P URC_ H A_ S E_7_RD_ ER _ _I N_FO_R MA_T_ _I O_ N_ _ _ _ _ _ _ ___( BR_ _EA_ X_ER_ D_
___U_SA_G_E_________________________________.
_ _ __ O
_ 7 _ ATE
______7_OT#
ITEM gL g P.O.
5 D
QARi QTY MANF MODEL g
g l RAT.
SYSTEM / FUNCTION DESCRIPTION l
i 14 1
2 13_1 I A64017 I9L29]72 l 272I I I
W l HFA3100 l 103A l 480VAC (Isolation Device)
F F
T 7
F T
T T
I I
I I
I I
I I
I f
F T
l T
T T
T
_ _ _ _ _ _ I_ _ _ _ _ _ _ _ _1 _ _ _ _ _ _ _ _ I _ _ _ _ _ _ _ T _ _ _ _ _Ii_____i______T_____
i i
i i
f f
f i
I I
I I
I I
I I
r r
f T
1 f
T T
L 1
L 1
I I
i 1
1 PROCUREMENT CHAIN INFORMATION FOR ABOVE I
I SUB-TIER VENDOP #1 I
- 2 i SU 83 ISUB-TIER VENDOR I
ITEM
___ __1____OPDERED FROM
_L_SUB-TIER VENDOR __________________L___B-TIER VENDOR ________________i_____________
________________L l
i I
I I
I I
I I
I i
14 l Westinghouse Sales l
l g
g l
J App _leton, WI
_L L
L L
1 I
i I
i i
l i
1 1
I I
I I
I 1
l l
I
._____1____________________L___________________L___________________L___________________I_______________
l i
I l
l l
1 1
I I
i 1
L L
1 I
I I
I I
I I
I I
I I
I I
i 1
I
._____1____________________L___________________L___________________IL________
i i
l i
i i
l i
l l
l 1
1 I
i
._____1____________________IL___________________L___________________I
______________________1____
o