AECM-89-0184, Forwards Inservice Insp Rept SERI-0619-00002 for Grand Gulf Nuclear Station Unit 1
| ML19324B787 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 10/24/1989 |
| From: | Cottle W SYSTEM ENERGY RESOURCES, INC. |
| To: | Ebnerter S NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19324B788 | List: |
| References | |
| AECM-89-0184, AECM-89-184, NUDOCS 8911080237 | |
| Download: ML19324B787 (1) | |
Text
<
o o
BB OCT30 ng: 53 r
===u==. ac
.. _ ~. ~ '
s,,,
October 24, 1989 i
vee presoy, Nrku Orxvotov, 11.S. Nuclear Regulatory Commission Region II 101 Marietta St., N.W., Suite 2900 l
Atlanta, Georgia 30323 Attention:
Mr. Stewart D. Ebneter, Regional Administrator
Dear Mr. Ebneter:
SUBJECT:
Grand Gulf Nuclear Station Unit 1 Docket No. 50-416 License No. NPF-29 Boiling Fater Reactor Feedwater Nozzle Inservice Inspection Report AECM-89/0184 The purpose of this letter is to provide the Boiling Water Reactor Feedwater Nozzle Inservice Inspection Report for Grand Gulf Nuclear Station (GGNS) as required by NUREG-0619. Compliance with NUREG-0619, Revision 1, is required by the Ten-Year Inservice Inspection Plan for GGNS. This report is provided within six months after completing Refueling Outage Three.
If additional information is required, please contact this office.
Yours truly,
)k 3911080 m 89 16 ADOCK O pg g
gDR WTC:tkm Attachment cc:
Mr. D. C. Hintz (w/a)
Mr. T. H. Cloninger (w/a)
Mr. R. B. McGehee (w/a)
Mr. N. S. Reynolds (w/a)
Mr. H. L. Thomas (w/o)
Mr.-H. O. Christensen (w/a)
Mr. L. L. Kintner, project Manager (w/a)
Office of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Mail Stop 14B20 gof Washington, D.C.
00555 I
p 00 h
a.vccx uxunvnon pp A9100501/SNLICFLR "l' "
- l * * *
- l""'3*
.0,;3..11cla Copy e
4 e.u a sx,.a.~, own Ap4