ML19324B767
| ML19324B767 | |
| Person / Time | |
|---|---|
| Site: | Waterford |
| Issue date: | 10/31/1989 |
| From: | Milhoan J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| To: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| NUDOCS 8911080184 | |
| Download: ML19324B767 (2) | |
Text
.-
f [f[ '** ~
NUCLEAR REGULATORY COMMISSION
{
uomo states s
nee m iv eis avam puuA oneva, suite ison j
(,,,,,
Anumerow, Texas nett j
October 31, 1989 i
h0TICE OF SIGNIFICANT LICENSEE MEETING i
Name of Licensee: Louisiana Power & l.ight Company l
Name of Facility: Waterford Steam Electric Station, Unit 3 f
Docket:
50-382 t
Date and Time November 7, 1989 i
of Meeting:
10 a.m. (CST)
Location of Meeting: Region IV office, 8th Floor Conference Room
{
Purpose of Meeting:
Enforcement Conference to discuss the protection of safeguards material (NRC Inspection Report 50-382/89-28) to be immediately followed by a SALP Functional Area Performance Assessment Presentation by the licensee and a management meeting to discuss NRC/LP&L consnunication interfaces.
i NRC Attendees:
R. D. Martin, Regional Administrator J. M. Montgomery Deputy Regional Administrator f
l S. J. Collins, Director, Division of Reactor Projects (DRP)
L. J. Callan, Director, Division of Reactor Safety (DRS)
A. B. Beach Deputy Director, Division of Radiation l
SafetyandSafeguards(DRSS) l T. P. Gwynn. Deputy Director, DRP L
J. P. Jaudon Deputy Director, DRS L. A. Yanoell, Deputy Director, DRSS l
F. J. Hebdon, Director, Project Directorate IV. NRR D. D. Chamberlain, Chief. Project Section A l
- 0. L. Wigginton, Senior Project Manager, NRR W. F. Smith, Senior Resident Inspector A. T. Howell, Project Engineer D. A. Powers, Chief. Security and Emergency Preparedness l
Section i
R. A. Caldwell, Security Inspector Licensee Attendees:
J. G. Dewease, Senior Vice President, Nuclear R. P. Barkhurst, Vice President, Nuclear J. R. McGaha, Nuclear Plant Operations Manager A. S. Lockhart, Nuclear Quality Assurance Manager j
R. F. Burski, Nuclear Safety and Regulatory Affairs Manager 1
e~
R. G. Azzarello, Nuclear Operations Engineering &
Construction Manager T. R. Leonard, Maintenance Superintendent t
i R. S. Starkey, Operations Superintendent W. T. Labonte, Radiation Protection Superintendent R. W. Lailheugue, Nuclear Operztions Administration Manager G. M. Davis, Event Analysis Reporting & Respense Manager g
F. J. Englebracht, Nuclear Emergency Planning Records P
Manager f
g
E
,[ '*.
Louisiana Power & Light Company Note: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by 4 p.m. on November 3,1989, via telephone call to D. Chamberlain (FTS7288249).
,'2
,.- 1 Approved By;-
h( I p 0. L. M1:noan, pi pe pr Division of Reactor
~rojects Distribution:
J. M. Taylor, A/EDO H. L. Thompson, DEDS T. E. Murley, D/NRR F. J. Miraglia, ADT/NRR J. G. Partlow. ADP/NRR J. Liebennan D/0E L. J. Chandler, Asst. GC for Enf.
D. Wigginton, Project Manager, NRR J. Sharkey, DE00 Staff R. D. Martin, RIY C. A. Hackney, RSLO J. Gilliland, PAO, RIV NRC Attendees W Wi!E45 H Licensee Address List
!