ML19324B767

From kanterella
Jump to navigation Jump to search
Notification of Significant Licensee Meeting on 891107 W/Util in Region IV Ofc to Discuss Protection of Safeguards Matl Followed by SALP Functional Area Performance Assessment Presentation by Licensee
ML19324B767
Person / Time
Site: Waterford 
Issue date: 10/31/1989
From: Milhoan J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
NUDOCS 8911080184
Download: ML19324B767 (2)


Text

.-

f [f[ '** ~

NUCLEAR REGULATORY COMMISSION

{

uomo states s

nee m iv eis avam puuA oneva, suite ison j

(,,,,,

Anumerow, Texas nett j

October 31, 1989 i

h0TICE OF SIGNIFICANT LICENSEE MEETING i

Name of Licensee: Louisiana Power & l.ight Company l

Name of Facility: Waterford Steam Electric Station, Unit 3 f

Docket:

50-382 t

Date and Time November 7, 1989 i

of Meeting:

10 a.m. (CST)

Location of Meeting: Region IV office, 8th Floor Conference Room

{

Purpose of Meeting:

Enforcement Conference to discuss the protection of safeguards material (NRC Inspection Report 50-382/89-28) to be immediately followed by a SALP Functional Area Performance Assessment Presentation by the licensee and a management meeting to discuss NRC/LP&L consnunication interfaces.

i NRC Attendees:

R. D. Martin, Regional Administrator J. M. Montgomery Deputy Regional Administrator f

l S. J. Collins, Director, Division of Reactor Projects (DRP)

L. J. Callan, Director, Division of Reactor Safety (DRS)

A. B. Beach Deputy Director, Division of Radiation l

SafetyandSafeguards(DRSS) l T. P. Gwynn. Deputy Director, DRP L

J. P. Jaudon Deputy Director, DRS L. A. Yanoell, Deputy Director, DRSS l

F. J. Hebdon, Director, Project Directorate IV. NRR D. D. Chamberlain, Chief. Project Section A l

0. L. Wigginton, Senior Project Manager, NRR W. F. Smith, Senior Resident Inspector A. T. Howell, Project Engineer D. A. Powers, Chief. Security and Emergency Preparedness l

Section i

R. A. Caldwell, Security Inspector Licensee Attendees:

J. G. Dewease, Senior Vice President, Nuclear R. P. Barkhurst, Vice President, Nuclear J. R. McGaha, Nuclear Plant Operations Manager A. S. Lockhart, Nuclear Quality Assurance Manager j

R. F. Burski, Nuclear Safety and Regulatory Affairs Manager 1

e~

R. G. Azzarello, Nuclear Operations Engineering &

Construction Manager T. R. Leonard, Maintenance Superintendent t

i R. S. Starkey, Operations Superintendent W. T. Labonte, Radiation Protection Superintendent R. W. Lailheugue, Nuclear Operztions Administration Manager G. M. Davis, Event Analysis Reporting & Respense Manager g

F. J. Englebracht, Nuclear Emergency Planning Records P

Manager f

g

E

,[ '*.

Louisiana Power & Light Company Note: Attendance by NRC personnel at the NRC/ licensee meeting should be made known by 4 p.m. on November 3,1989, via telephone call to D. Chamberlain (FTS7288249).

,'2

,.- 1 Approved By;-

h( I p 0. L. M1:noan, pi pe pr Division of Reactor

~rojects Distribution:

J. M. Taylor, A/EDO H. L. Thompson, DEDS T. E. Murley, D/NRR F. J. Miraglia, ADT/NRR J. G. Partlow. ADP/NRR J. Liebennan D/0E L. J. Chandler, Asst. GC for Enf.

D. Wigginton, Project Manager, NRR J. Sharkey, DE00 Staff R. D. Martin, RIY C. A. Hackney, RSLO J. Gilliland, PAO, RIV NRC Attendees W Wi!E45 H Licensee Address List

!