Forwards Perry Nuclear Power Plant Unit 1 Post-Refueling Startup Test Summary Rept,Cycle 2. Rept Addresses Impact of Refueling Activities on Tests Identified in Updated SAR Section 14.2.12.2
ML19324B748
Person / Time
Site: Perry FirstEnergy icon.png
Issue date: 11/03/1989
From: Kaplan A
CLEVELAND ELECTRIC ILLUMINATING CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML19324B749 List:
References
PY-CEI-NRR-1093, NUDOCS 8911080140
Download: ML19324B748 (1)


Text

, _.

s.

.p C THE CLEVELAND ELECTRIC ILLUMINATING COMPANY

(

P.O. DOX 97 5- t'ERRY. OHIO 44001 5 TELEPHONE (216) 2 S 3737 5 ADDRESS 10 CENTER ROAD FROM CLEVELAND: 4 4 1260 5 TELEX: 241699 ANSWERsACK: CEIPRYO Al Kaplan Serving The Best location in the Nation PERRY NUCLEAR POWER PLANT vec mrswa n November 3, 1989 PY-CEI/NRR-1093 L

't i

U.S. Nuclear Regulatory Commission l- Document Control Desk Washington, D. C. 20555 Perry Nuclear Power Plant Docket No. 50-440 Post-Refueling Startup Test Summary Report Genticment Attached is the Perry Nuclear Power Plant (PNPP) Unit 1 Post-Re.*ueling Startup Test Summary Report which summarizes the testing activities occurring during the first refueling outage and subsequent rtartup. This report is submitted in accordance with the requirements of the Unit 1 PNPP Technical Specifications, Specification 6.9.1.3. j In accordance with Technical Specification 6.9.1.1, this report is submitted because of the installation for Cycle 2 of fuel with a different design than that for Cycle 1. This report addresses the impact of refueling activities on each of the tests identified in the USAR, Section 14.2.12.2 in accordance with Technical Specification 6.9.1.2.

If you have any questions, please feel iree to call.

Very truly yours, wf ek Al Kaplan i Vice President  !

Nuclear Group l AK:njc i

8911000140 091103 PDR ADOCK 05000440'$

cc T. Colburn P PNU P foof P. Hiland ' I '

NRC Region III 4

.. g .- , . , _ .