i THE CLEVELAND ELECTRIC ILLUMINATING COMPANY P.O. 90X 97 5. PERRY. OHp0 44001 5
TELEPHONE (216) 25s.3737 g
ADDRESS-10 CENTER ROAD -
1, FROM CLEVELAND: 4 4 1200- 3 TELEX: 241699 i
AN8WERsACK: CEIPRYO At Kaplan Serving The Best location in the Nation PERRY NUCLEAR POWER PLANT I
vet entsoeut
' Ntett AA GROUP -
October 27, 1989 PY-CEI/NRR-1086 L' f-i p.
U.S. Nuclear Regulatory Commission Document Control Desk
-(
i:
Washington, D. C.
20555 Perry Nuclear Power Plant
~
Docket No. 50-440 Supplement to Reactor Containment Building Integrated Leak Rate Test Report
,a:
Gentlemen:
~The Cleveland. Electric Illuminating Company, pursuant to.10CFR50, Appendix J, Section V, Paragraph B.3, hereby submits a Supplement to the Reactor Containment Building Integrated Leak Rate Test Report previously submitted to' the NRC via letter PY-CEI/NRR-1070L on October 12, 1989. This Supplement consists of a Summary Analysis of Periodic Type C Tests performed since the
~
.Preoperational ILRT that failed to meet the acceptance criteria and a
-description'of the Corrective Action taken. There were no reportable failures of Periodic Type B Tests performed since'the Preoperational ILRT.
'If you have any questions, please feel free to call.
Very truly yours, f
Al J
Vice President Nuclear Group l
L AK njc cct -
T. Colburn P. Hiland I
I U.S. NRC Region III F. Maura pol 7 l
8911070279 891027 i
PDR ADOCK 05000440 l
p PNU o
- - - -