Comments on 890426 Generic Ltr Re motor-operated Valve Testing & Surveillance.Agrees W/Es Beckjord View That Generic Ltr on motor-operated Valve Testing & Surveillance Be Issued Promptly
ML19324A487
Person / Time
Issue date: 05/30/1989
From: Murley T
Office of Nuclear Reactor Regulation
To: Beckjord E
NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
References
NUDOCS 8906210142
Download: ML19324A487 (4)


Text

CaiderJ FELL e

,w

.o UNITED STATES 8

g NUCLEAR REGULATORY COMMISSION n

7, '

E W ASrtlNGTON, D. C. 2055%

4

%,,...+

MAY 3 01989 L

MEMORANDUM FOR:

Eric S. Beckjord, Director Office of Nuclear Regulatory Research

-FROM:

Thomas E. Murley, Dirletor Office of Nuclear Reactor Regulation

SUBJECT:

GENERIC LETTER ON MOTOR-0PERATED VALVE TESTING AND SURVEILLANCE

By memorandum dated April 26, 1989, you transmitted a proposed Generic Letter on Motor-operated Valve (MOV) Testing and Survei Mance for issuance by the Office of Nuclear Reactor Regulation (NRR).

You recommended issuance of the

' Generic Letter as soon as possible because:

(1) the matter is of high safety significance, (2) many licensees are awaiting issuance of the letter before taking. action, and (3) an extended length of time will be needed to resolve this problem.

In your memorandum, you noted that the Committee to Review Generic Requirements has approved the Generic Letter in its current form. Furthermore, you stated that the Advisory Committee on Reactor Safeguards (ACRS) had been briefed on the subject Generic Letter 'and although they did not offer any written comments or endorsements, they did raise two particular concerns regarding scope of the Generic Letter. and the difference between NRC and industry cost estimates.

Since the date of your memorandum, your staff has responded to these ACRS concerns and provided edditional information at ACRS meetings held during the i

first week of May.

t In a May 9,1989 letter to Chairman Zech, the ACRS concurred with the need for, and the scope of, the proposed Generic Letter. The ACRS also provided several r

recommendations for incorporation into the Generic Letter.

I aopreciate your staff's efforts in obtaining the concurrence of the ACRS.

My staff will be discussing the ACRS recommendations with members of the Engineering Issues Branch to decide how to address them.

I agree with your view that the Generic Letter on Motor-operated Valve Testing and Surveillance should be issued promptly.

Consequently, I have directed that the final NRR review and issuance of the Generic Letter be performed on a high priority basis.

W t

y -1 y

T 1omas E. Murley, Director i

(QfficeofNuclearReactorRegulation

[I a

f)k)/

1 RiTUE TO RiGj ATORY CiJM :l.iS o

33 8906210142 890530 t

I ib

~~~'

CF SUBJ W

~$*

-b

HEMORANDUM FOR:

Eric S. Beckjord, Director 7

30 W Office of Nuclear Regulatory Research FROM:

Thomas E. Murley, Director Office of Nuclear Reactor Regulation

SUBJECT:

GENERIC LETTER ON MOTOR-0PERATED VALVE TESTING AND SURVEILLANCE By memorandum dated April 26, 1989, you transmitted a proposed Generic Letter on Motor-operated Valve (MOV) Testing and Surveillance for issuance by the OfficeofNuclearReactorRegulation(NRR).

You recorrnended issuance of the Generic Letter as soon as possible because:

(1) the matter is of high safety significance, (2) many liccasees are awaiting issuance of the letter before taking action, and (3) an extended length of time will be needed to resolve this problem.

In your memorandum, you noted that the Committee to Review Generic Requirements has approved the Generic Letter in its current form.

Furthermore, you stated that the Advisory Committee on Reactor Safeguards (ACRS) had been briefed on

-the subject Generic Letter and although they did not offer any written comments or endorsements, they did raise two particular concerns regarding scope of the Generic Letter and the diffet nce between NRC and industry cost estimates.

Since the date of your memorandum, your staff has responded to these ACRS concerns and provided additional information at ACRS meetings held during tne first week of May.

In a May 9, 1989 letter to Chairman Zech, the ACRS concurred with the need for, and the scope of, the proposed Generic Letter. The ACRS also provided several recommendations for incorporation into the Generic Letter.

I appreciate your staff's efforts in obtaining the concurrence of the ACRS. My staff will be discussing the ACRS recommendations with members of the Engineering Issues Branch to decide how to address them.

I agree with your view that the Generic Letter on Motor-operated Valve Testing and Surveillance should be issued promptly. Consequently, I have directed that the final NFR review and issuance of the Generic Letter be performed on a high priority basis.

Original signed by James H. Sniezek Thomas E. Murley, Director Office of Nuclear Reactor Regulation DISTRIBUTION:

Central tite GHolahan MVirgilio DMuller LLuther DMossburg TMurley TRoss w/cy of incoming JPartlow JSniezek NRC & Local PDR w/ incoming (5520-Yellow-Ticket 9094)

Sq, p

  • see previous page for concurrence j

PDIII-2 PDIII-2 PDIII-2 (A)AD:DRSP (A']tidSP ADP:NR TRoss:km*

LLuther*

DMuller* MVirgilio*

' folahan JPartll w 5/22/89 5/22/89 5/22/89 5/22/89 5/73 /89 5/

/89 D

R RR b

~

fl?

J!l zek T

ley a

4

/89 32)/89 5/g/89

.r(/#5/

a

. MEMORANDUM FOR:

Eric S. Beckjord,: Director

, s

' Office of Nuclear ' Regulatory Research

'FROMf Thomas E. Murley, Director E

Office'of Nuclear Reactor Regulation-

SUBJECT:

GENERIC LETTER ON MOTOR-OPERATED VALVE TESTIIG AND SURVEILLANCE

+

t By. memorandum _ dated April 26, 1989, you transmitted a proposed Generic Letter on Motor-operated-Valve (MOV) Testing and Surveillance for issuance by..the i

Office of Nuclear Reactor Regulation (NRR). You recommended issuance of-the Generic Letter as soon as possible beca9se:

(1) the matter is of high safety-

. significance, (2) many licensees are. awaiting issuance of the letter before taking. action, and (3) an extended length of time will be needed to resolve this problem.

In your memorandum, you noted that the Committee to Rev,iew Generic Requirements 1

has approved the Generic \\ Letter in its current form.

Furthermore, you stated that the Advisory Committ'ee on Reactor Safeguards-(ACRS) had been briefed on the subject Generic Letter \\and although they did not offer any written comments l

or endorsements, they did rhise two particular concerns regarding scope of the

.Ge"eric Letter and the difference between NRC and industry cost estimates.

Since the date of your memorandum, your staff has responded to these ACRS a

concerns and provided additions 1 information at ACRS meetirgs held during the first week of.May.

In a May 9, 1989 letter to Chairm'an Zech,~the ACRS concurred with the'need for,

-and the scope of, the proposed Generic Letter. The ACRS also provided sever 41 recommendations for incorporation into the Generic Letter.

I appreciate yon staff's: efforts in' obtaining the coricurrence of the ACRS. My staff will-be j

discussing the ACRS recommendations with members of the Engineering Issues e

D Branch to decide how to address them.\\

r

\\

'I agree with your view that the Generic \\ Letter on Motor-operated Valve Testing

}

.and Surveillance should be issued promptly.

Consequently, I have directed that the final NRR review and issuance ofsthe Generic Letter be performed on a hi h priority basis.

}

0 x

x Thomash'Murley, Director Office of' Nuclear Reactor Regulation 1

r DISTRIBUTION:

-Central file GHolahan MVirgilio iDMuller LLuther DMossburg TMurley TRoss w/cy of incoming JPartlow JSneizek NRC & Local PDR w/ incoming r

  • see previous page for concurrence (A)AD:yA//

PDIII-2 PDIII-2 PDIII-2 DRSP (A)DRSP ADP:NRR j

.TRoss:km*'

LLuther*

DMu11er* MViriglio GHolahan JPartlow 5/22/89.

5/22/89 5/22/89 5/iG /89 5/

/89 5/

/89 DDONRR DONRR JSniezek TMurley 5/./89 5/

/89 e

-mnu

-sw,,-

n--w

+r-e--,,p--

,q-y

[ MEMORANDUM FOR:

Eric S. B;ckj rd, Dirsctor Offica of Nuc1:ar. Rigulatory R:s: arch

.,p

'FROM:-

-Thomas E. Murley, Director Off. ice of Nuclear Reactor Regulation.

SUBJECT:

GENERIC LETTER ON MOTOR-OPERATED VALVE TESTING AND SURVEILLANCE

  • L-By menorandum dated April 26, 1989', you transmitted a proposed Generic Letter on Motor-operated Valve (MOV) Testing and Surveillance for issuanc y the i

c

.OfficeofNuclearReactorRegulation(NRR). You recommended issu ce of the

.GenericLetter'assoonaspossible.because:{(1)thematteriso'highsafety g

. significance, (2) many licensees are awaiting issuance of the etter before taking action, and-(3) an extended length of time will be ded to resolve this problem.

3 j

In your memorandum, you noted that the Committee to R iew Generic Requirements i

has approved the Generic Letter in its current form..Furthermore, you stated

-that the Advisory Committee.on Reactor Safeguards CRS) had been briefed on the. subject Generic Letter and'although they did ot offer any written comments

. or endorsements they did raise two particular ncerns regarding-scope of the

Generic Lettef and the difference between NR and industry cost estimates.

. Since the date of your memorandum, your st has responded to these'ACRS t

concerns and provided additional informat n at ACRS meetings held.during the first week of May.

In a May 9, 1989 letter to Chairman ch, the ACRS concurred with the need for, and the scope of, the proposed Gen ic Letter. The ACRS also provided several recommendations for incorporatio into the. Generic Letter.

I appreciate your staff's efforts in obtaining th concurrence of the ACRS.. My staff will be discussing the ACRS recommend ions with members of the Engineering Issues Branch to decide how to addr s them.

I agree with your view th the Generic Letter on Motor-operated Valve Testing andSurveillanceshould/eissuedpromptly. Consequently, I have directed that the' final NRR rey ew and issuance of the Generic Letter be performed on a high priority basi.

Thomas E. Murley, Director Office of Nuc aar Reactor Regulation DISTRIBUT. ION:

Central 1ile GHolahan MVirgilio DMu11er Lluther-DMossburg TMurley TRoss w/cy of incoming.

JPartlow-

JSneizek NRC & Local PDR w/ incoming PDIII /

PDIll-2 P % M (A)AD:DRSP (A)DRSP ADP:NRR TRoss:kn (L LLuthe D$/let MViriglio GHolanan JPartlow 5/9/89 5/M/89 5/jli/89 5/

/89 5/

/89 5/

/89 DDONRR DONRR JSniezek TMurley 5/-

/89 5/

/89