,//@ h C-E Power Systems Tcl. 2C'J/688 1911 h
Cornbustion Engineering. Inc.
T:;l:x. 99297 1000 Prospect Hill Road y
Windsor Connecticut 06095 POWER
\\ 1N' SYSTEMS
[;', ;
l.R;'
4.z... _l g fra l
e g
License SNft-1067 April 2, 1980 70-1100 Drg.
'* \\
"I; w.
p t,-
U. S. fluclear Regulatory Commission US f0 g
Washington, D. C.
20555
. Apg 3 1
1 198 0,s Uj NM Attention: Mr. J. G. Partlow, Chief
{
Db$cllSS Au 7eu f
Material Control & Accountability Licensing Branch D2
//
b f
Division of Safeguards
/
A Gentlemen:
Our definition of " book record" or " book balance" has been added to Chapters 5.0 and 6.0 of the Fundamental Nuclear Material Control ' Plan, as requested.
This change is submitted under the provisions of 10 CFR 70.32(c) and your request dated January 25, 1980.
Very truly'yours, H. V. Lichtenberger Vice President-Nuclear Fuel Nuclear Power Systems-Manufacturing HVL/HTC/ssb Enclosures FEE EXEMPT 1607:a 8006200#El
5.0.1 0,finitiens 5.0.1.1 Book Record or Book Balance The accounting documentation under the control of the fluclear Materials Manager, which reflects all transactions of element and fissile isotope that cross the Windsor site boundaries and also reflects all transactions of element and fissile isotope j
that cross individual MBA/ICA boundaries within the Windsor site.
5.1 Inventory Requirements Periodic physical inventories of Special fluclear Material assigned to Com-bustion Engineering's Windsor facility are required and will be conducted in accordance with federal regulations. These inventories will normally be taken during the periods of June 15 - August 15 and December 15 to February
- 15. A minimum of two inventories per calendar year is required.
3 5.1.1 Special Inventories
]
Special inventories may be required for any number of reasons, some of which are:
After an unsatisfactory inventory with unreconcilable MUF where MUF is 1.3 times LEMUF, or more.
After an operating accident.
After a nonoperating accident such as fire, explostun, storm damage, etc..
Suspicion of an attempted or confirmed diversion.
5.2 Procedure's Responsibility for issuing and maintaining overall inventory procedures for Combustion Engineering is vested in the Nuclear Materials Manager.
5.3 Notice of Inventory The production departments will be advised by the HMM prior to any inventory as to the reason and date of the inventory, the type and scope of the inventory, and the reporting methods required.
5.4 Inventory Preparations and Cut-Off Procedures 5.4.1 Based on inventory instructions indicating cut-off times, the manu-facturing facilities will cease material movements as specified. Nor-mally, inventories for NFM-W will be scheduled to coincide with the com-pletion of a full plant clean-up upon enrichment change, tEus minimizing in-process material. When a complete clean-up is not possible, a pellet-izing area shutdown and as extensive a clean-up as practical will be accomplished to reduce the in-process material.
Revision 4 l
5.1 April 1980
~~
5.'4 Inventory Preparations and Cut-Off Procedures 5.4.1 (Cont'd)
Normally, the following conditions will be met prior to conduct of an inventory:
5.4.1.1 Pellet production will cease during inventory.
5.4.1.2 Stacking and loading of fuel pellets will cease, although fuel rods previously loaded may be seal welded.
5.4.1.3 Vacuum and/or other cleaning of the following equip-ment will be completed:
a). Powder preparation stations including belts b) Granulator hood and conveyor c) Pellet presses d) All batch make-up, recycle, hammermill, etc., loads e) Powder storage pads f) Stacking tables g) Grinders, centrifuges and assorted equipment h) All other areas where powder or chips may accumulate The Manufac'turing Process Engineer will determine, based on the known time in service, whether or not the hood filters and return air system filters will be knocked down.
Press fuel hoppers containing SNM need not be emptied, but must be gross weighed (minus recorded tare weight) for in-ventory pruposes.
5.4.2. Material movement between control areas will cease at the start of, or prior to, conduct of the inventory. Fuel rod work and/or inspection may continue within production areas during the conduct of the inventory.
5.4.3 Accounting records will be updated to the inventory cut'-off time reflecting all physical receipts or removals prior to the cut-off. Subsequently, a book balance will be established for each MBA/ICA and for the Windsor site as of the cut-off time.
5.4.4 The Development Department will not move SNM between its Criticality Areas nor receive or transfer SNM between manufacturing and itself during the inventory. ' The NMM and the applicable NMC Supervisor or NMC Engineer may release material in the event of an emergency. Such movements must be documented and signed.
1 l
I Revision 4 5.2 April 1980 l
~-
5.5 Inventory "ieams Inventory teams to be assigned by the Manufacturing and Development Depart-ments will consist of two persons per team. One of the team members must be familiar with the items being inventoried. One member is designated as the recorder, the other is the counter / caller. The recorder enters inven-tory data on the inventory sheets; the counter / caller identifies items, weights, etc., relaying the information to the recorder as well as applying inventory stickers / tags to recorded items. The recorder will insure that all items in the team's assigned areas are inventoried and that no item is omitted or recorded in more than once.
!}
I l
l l
l I
Revision 4 j
5.3 April 1980 i
a' ;
~ 6.0 Material Accounting System 6.0.1 Definitions 6.0.1.1 Book Record or Book Balance The accounting documentation under the control of the Nuclear Materials Manager, which reflects all transactions of element and fissile isotope that cross the Windsor site boundaries and also reflects all transactions of element and fissile isotope 'that cross individual MBA/ICA boundaries within the Windsor site.
6.1 System Description
Being responsible for overall accounting and control of SNM, the NMM maintains centralized accounting records for Combustion Engineering's Windsor site. Subsidiary accounts and accounting records are established at each MBA and are maintained by the SNM custodians. All transfers of SNM are accounted for using a double entry system, crediting one account, debiting another. Approved procedures provide for reconciliation, drawing material balances, adjustments, and storage of records.
6.1.1 Account Structure
~
The NMM maintains consolidated, centralized accounting records as well as records of SNM under his custody. MBA 1, MBA 2, and the Nuclear Lab custodians maintain journah for their respective areas.
Accounts within MBA are shown in Exhibit 6.1.
Various accounting records are maintained to properly account for SNM at the Windsor facility:
Transfer Journal: A transfer journal is maintained by material category to record initial and ending balances, receipts, shipments, and other removals of SNM.
Project Control Ledaer: A project control ledger is maintained by material category to summarize the initial and ending balances, the receipts, transfer, and/or other removals for particular pro-jects.
Included is information concerning contract number, project title, reporting unit, material content, enrichment, etc.
6.1.1.1 Accounting Forms Accounting forms used to record and transmit accounting data (source data) are: AEC Form 741, AEC Form 284, and the CE Material Transfer Ticket (Exhibit 6.2).
6.1.1.2 Flow Chart An accounting flow chart for receipts is included as Exhibit 6.3, and a flow chart for shipments is included as Exhibit 6.4.
Revision 4 6.1 April 1980
6.1.2 Accounting Procedures An accounting procedures manual will be established and maintained.
The NMM will have overall responsibility and updating of the pro-cedures manual. The NMC Supervisor will prepare and update pro-
.cedures peculiar to NFM-W. Appropriate levels of management will approve these procedures, i
3 t
1 l
l l
l 1
Revision 4 16072 6.2 April 1980