ML19323H952

From kanterella
Jump to navigation Jump to search
Informs NRC That Limit Switches Used for Position Indication Were Not Included in 45-day Response to IE Bulletin 79-01B. Environ Qualification of Switches Should Be Addressed.Ae Is in Process of Specifying Qualified Replacement Switches
ML19323H952
Person / Time
Site: Hatch  
Issue date: 05/15/1980
From: Manry M
GEORGIA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
IEB-79-01B, IEB-79-1B, NUDOCS 8006170337
Download: ML19323H952 (1)


Text

Georgia Power Company W

Post Office Box 442

/

6' Baxley.Georgra 31513 Telephone 91.2 367-7781 912 S37-9444 TillS DOCUMENT CONTAINS 4

l g. :

POOR QUALITY PAGES L

m A

Edwin 1. Hatch Nuclear Plant LCOreia Power w

'\\i \\ *, l U the southem electnc system

>:, y is, i,nn pu_nn_s u l

PLA'?*

E.

T.

11 A

  • C'1 ffpdate to TER 79-01R Response "r.

.Tanes P.

O'9ailly I' ", "ucleer R o,q u i n t o r */ Conni s s # o r.

Office of Inspection an Enforcemant 7egion TT

" nite 3100 101 Marietta St-eet Atlante, Georgic 30303 naar Sir:

Limit switches that nre ti s e d for pos *t ion indicat*on only tsara not included in the l+5-day response tn TER 79-019 It haa now heen decided that tha anvironmental git a l i fi e s t

  • on o r thane svitches s h o u 1 c' be a d d r e s s a <'.

A 'ist has been prepered of eir and noter ope ated contei nmant isolat ion valves in ilELB or LOCA ereas that have non-auntifi ed limit swi tches installed for the purpose o'

pos i tion indicat*on.

Tha A/E is in the process of speci fvine qua'ifie?

replacements for these switches.

It is anti.cinated that these switches will he replaced during the uper ming refueling outages on ecch unit depending on re eipt of parts.

,t/

m

/7/pv24 h a

fY.

'"dn'r'y

}

Plant Mana r

MCM/pebe xc:

W.

A.

Widner L.

T.

Gucun

'r.

V.

Greene C.

T.

Moore C.

L.

Coggin M.

C.

McCluskie File:

M-58

,]!,

h -

8006170337 r m e1~

.. ~ _.. - -

- _-