Text

...

f

/ g.;!

p*

c.

p Distribution Docket File DCS.

NMSS R/F MAY 141980 FCAF R/F Fl1Empson ATClark Docket No. 70-1308 3

JShafer

. z..=

.=...

w.v.

n.3 y

MEMORANDUM FOR: Leland C. Rouse, Chief

~.

ii:

+6ij Advanced Fuel and Spent Fuel Licensing Branch 5 74 Division of Fuel Cycle and Material Safety

a FROM:

L. Leonard Gordon

..y

~*

Advanced Fuel and Spent Fuel Licensing Branch-Division of Fuel Cycle and Material Safety

, g.

SUD3ECT:

QUALITY ASSURANCE (QA) INPUT TO THE SAFETY EVALUATION sj REPORT (SER) APPLICABLE TO OPERATIONS AT THE

.Z c.

GENERAL ELECTRIC MORRIS SPENT FUEL SERVICES OPERATION In support of General Electric Company's request for renewal of o

SNM-1265, attached is nty input to the 'overall Safety valuation Report.

~

.;;;;;.;.n

?

L. Leonard Gordon

+.:

Advanced Fuel and Spent Fuel N

Licensing Branch Division of Fuel Cycle and q

m..

Material Safety y

Enclosure:

Quality Assurance Plan' 7 :

.'i

,I.

J r

i W.g

=;;;; ^

./ Fi$

'~"

g

..F..C..A..F..

..F..C..A..F. 4.

I 9

.m

_LGor n:

b LCRoua

===.== >

.. 74g95. -- ---.

-. ~~~ ----.

sq.no...........si..H.8 0.........

! -c -.,,.u, a.

t 80ce27e A 63

SAFETY EVALUATION REPORT SPENT FUEL SERVICES' OPERATION QUALITY ASSURANCE PLAN QUALITY ASSURANCE GENERAL The description of the quality assurance (QA) program for General Electric (GE) Spent Fuel Services Operation (SFS0) is contained in documents NED0-20776 dated July 1975, NED0-20766-1, dated September 1975, NED0-20776-2 dated May 1976, and NED0 20776-3 dated July 14, 1978.

Our evaluation of this QA program applicable to operations at the General Electric Morris nuclear fuel storage facility, is based on a detailed review of this information and reponse to questions pertinent to their QA plan submitted to GE on February 28, 1980.

The plan was reviewed against the requirements set forth in Appendix B to 10 CFR Part 50, "QA Criteria for Nuclear Power Plants and Fuel Reprocessing Plants," and proposed Revision 3 to Regulatory Guide 1.33, "QA Program Requirements for Operations."

ORGANIZAi!G"

~ The organizational structura responsible for the establishment and execution of the QA program for the SFSO is shown in Figure 1.

The Manager of SFSO, who has the overall responsibility for engineering services and regulatory operations for the Morris facility, has delegated the authority for implementation and control of the QA progrsm to the Manager of QA.

The Morris Operation Organization is shown in Figure 2.

The Manager of Quality Assurance and Safeguards, who reports to the Morris Operation Manager, is responsible for directing and managing the QA program at the site.

Both

2 QA organizations have authority delegated in writing from the manager SFIO and freedom to identify quality problems; initiate, recommend or provide solutions; and verify implementation of solutions. The QA personnel shown in Figure 3 and assigned to the Morris Operation is sufficient to support the level of activity expected at the site.

The SFSO QA organization is given responsibility for: establishing require-ments (e.g., hold points, inspection, documentation) for verification of quality; reviewing and approving quality related documents (e.g., instructions, procedures, drawings, and specifications); verifying by test or inspection that quality requirements are met for materials, components, processes and plant mcdifications; documenting and reporting to responsible management any nonconformances discovered in the course of inspection, surveillance or audit; assuring corrective actions are effective and accomplished in a timely manner; and surveillance and auditing of maintenance, repair and operation activities.

.QA PROGRAM The QA program for operations at the Morris nuclear fuel storage facil.ity implements the requirements of GE's corporate and division quality policies -

via Quality Standing Instructions (QSI) and Implementing Procedures (IP).

The QSI and IP, which are reviewed and approved by the Manager of QA, j

encompass detailed quality instructions for translating codes, standards, regulatory requirements, and technical specifications.

t 4

6

. The QA program includes an indoctrination and training program to assure that persons involved in quality-related activities are knowledgeable,in QA instructions and requirements. This program also maintains a high level of personnel competence and skill in-the performance of quality-related activities.

Quality is verified through surveillance, inspection, testing, checking and aud'it of safety-related activities.

The-QA program requires that quality verification be performed by personnel other than those who performed the actual work activity.

Inspections are performed dsing preplanned checklists by QA/QC personnel in accordance with written and approved inspection plans.

The qualifications of inspectors, who are independent from the individual or group performing the activity being inspected, and their current status to conduct inspections, tests and examinations are based on applicable codes, standards, and GE training programs. Nondestructive examination personnel are certified in accordance with SNT-TC-1 A.

Audits are performed in accordance with written procedures or checklists by appropriately trained QA personnel not having direct responsibility in the areas being audited.

The audit activities, which are conducted on a periodic basis, include an objective evaluation of QA practices, procedures and instruction; work areas, activities, processes and items; the effectiveness of implementation of the QA program; and compliance with policy directives. The QA program requires both documenta-tion of audit results and formal notification of the audit findings to manage-ment of the audited function. Management for the area audited implements i

.. m

_4_

the corrective action within the time constraints committed in their.

response to questions submitted to them on February 28,1980 by the staff.

Significant audit finiings are included in periodic reports to nanagement from the Manager o f QA.

' CONCLUSION t

Based on our evaluation of the qualifications, duties, responsibilities, and authority for the various individual positions performing QA functions, we conclude that the QA organization for SFSO has sufficient authority, and independence from undue influences of cost and schedule, to effectively

. conduct the QA program. Our review and evaluation of the QA program has shown that GE's QA program provides a comprehensive system of planned and systematic controls such that quality-related activities will be conducted in accordance with the requirements of Appendix B to 10 CFR 50. We therefore conclude that GE's QA program is acceptable for the operations at the Morris nuclear fuel storage facility.

hs h

l i

MANAGER.

MORRIS OPER ATION M AN AG ER-MANAGER.

MANAGER.

MANAGER.

PLANT ENGINEEntNG OUALITY ASSURANCE RELATIONS AND PLANT OPERATIONS AND M AINTEN ANCE AND SAFEGU AROS ADMINISTRATION I

I I

I NUCLE AR.M ATE RI ALS OPERATIONS MAINTENANCE BUYER SAFEGUARDS ENGINEERS ENGINEER SPECIALIST LICENSING & RADIO-OPERATIONS F ACILITIES QUALITY DESIGNER LOGICAL SAFETY SUPERVISORS, CONTROL SPECI ALIST SENIOR ENGINEER k

I aB I

I CO su a M

e ANALYTICAL l

MORRIS OPER ATION w

g Ol'E R ATIONS MAINTENANCE LABORATORY 6--

ACCOUNTING g%

TECHNICIANS COORDINATOR SUPERVISOR SPECIALIST

--a o e

I FIE'LD SERVICE MAINTENANCE ANALYTICAL SENIOR ENGINEER SUPERVISOR TECHNICIANS FIELD SERVICE M ECH ANIC AL '

MAINTENANCE SPECIALIST TECHNICfANS ELECTRICAL /

ELECTRONICS MAINTENANCE TECHNICIANS 4

JANUARY 1970 Figure 1.

Morris Operation Organization O

l CC,3%

.. 3 r.t M ORRIS OPE R ATION MANAGER

C-;::##

iiii!

PLANT OPE RATIONS AND SERVICES

~

. :sse T!!

PLANT ENGIPJEE RING

~

AND SAFETY

=.

..?.?

.w.

OUALITY ASSURANCE g,~

AND SAFEGUARCS

\\

u+.

.. ?.: ::.

. a:.c.s

..u EYFLOYEE AND

4. '

COMMUNITY RELATIONS 6-b TRANSPORTATICN U

f '>ECI A LIST vi

yy
."9 FIELD SE RViCE SENIOR ENGINEER

,;,.1 w..: #.s

.=w B: -:3:a Fiure 2 Morris Ooe ation Orgmization t

D**D D

$ 6 C

O

.... -.. ~..

- ;_:. s :,

+~u

o j

OUALITY ASSURANCE AND SAFEGUA RDS MANAGER QUALITY ASSUR ANCE CLERK ~

' SPECIALIST FACILITIES QUALITY CONTROL

/

SPECIALIST NUCLEAR MATERIALS SAFEGUARDS f

4

~

Figure 3. Quality Assurance and Safeguards Orgenization (Morris Operation)

$.h Page 9 of 9