Text
,+
MAME9 ;#A/MEE MOB!9FmysCFsm?F.
10,,,, x, n o, o,,,,,,
S Ca.
ENGINEERING OFFICE WESTBORo, MASSACHUSETTS 01581 617-366-9011 h-m4h B.3.2.1 WMY 80-92 June 9,1980 United States Nuclear Regulatory Commission Washington, D.C.
20555 Attention: Office of Nuclear Reactor Regulation Division of Licensing Darrell G. Eisenhut, Director
Reference:
(a) Licerse No. DPR-36 (Docket No. 50-309)
(b) USNRC Letter to All Operating Reacter Licensees, dated May 7, 1980 (c) USNRC Letter to All Operating Reactor Licensees, dated March 28, 1980
Subject:
Five Additional TMI-2 Related Requirements
Dear Sir:
Your letter, Reference (b), transmitted five items from the NRC TMI Action Plan which, applicable to operating reactors, constitute a second set of requirements for operating reactors. Maine Yankee was requested to reply within 30 days stating our commitments to meet the additional requirements and associated schedules.
The attachment to this letter provides a tabulation by item of the eleven requirements specified in Reference (b) and our specific plan to address each. Maine Yankee recognizes our obligation to respond to NRC requests for information and it is our intention to be fully responsive in this regard.
However, we trust that the NRC staff recognizes that Maine Yankee, as the 21censee, bears the full weight of responsibility for the safe operation of our facility. In the felfillment of our responsibilities, we are obligated to parform independent, plant specific assessments of any additional requirements prior to implementation, to assure that the collective impact of NRC requirements will not compromise existing system safety and reliability. This overall assessment of the collective impact of the requirements was recommended by the Bulletins and Orders Task Force in Item B.15 of NUREG 0626.
8 006170 M/
p
i.,
(
U. S. Nuclear Regulatory Commission June 9,1980 Attention: Darrell G. Eisenhut, Director Page 2 1
Please note that Maine Yankee will respond to Item (1), Shift Manning, within 30 days of receipt of the material to be provided by your staff through separate correspondence. Furthermore, discussions with your staff negated the need for any action / commitment by Maine Yankee regarding items II.K.3 25, II.K.3 29, and II.K.3 44.
Very truly yours, MAINE YANKEE ATOMIC POWER COMPANY
- 3. 0.T D. E. Moody Manager of Operations BHG/sec Attachment 4
I plementation Schcdula rnd Summary l
Item No.
Title Requirement Implementation I.A.l.3 Shift Manning Maine Yankee will respond to the scope and schedule of this requirement within 30 days of receipt of the detailed information.
I.A.3 1 Revise Scope and Submit revised programs.
Reference (c) provided revised criteria to be Criteria for Licensing applied to all Reactor Operator, Senior Reactor Examination Operator and Requalification Training activities. Maine Yankee's training programs were modified in conformance with that revised criteria and were implemented prior to May 1, 1980 as requested. Revised programs will be submitted to OLB for review by August 1, 1980.
I.C.5 Licensee Dissemination Perform an operating Maine Yankee commits to review and revise of Operating Experience experience assessment to applicable procedures as necessary to assure to Plant Staff assure that important that operating information pertinent to plant information is continually safety originating both within and outside the provided to operators.
organization, is continually supplied to operator and other personnel, and is incorporated into plant trrining and retraining programs in accordance with the guidance provided in Enclosure (2) to Reference (b).
Maine Yankee intends to complete the procedure review and revision by January 1,1981.
II.K.3 1 Isolation and Testing of (1) Licensee to document pro-If the results of the PORV failure studies,
~
Automatic PORV Isolation posed changes for staff required under item II.K.3 2 below, indicate System approval prior to implemen-that a system to automatically isolate the tation. Documentation to be PORV's is necessary. Maine Yankee will commit submitted by scheduled date.
to the design and installation of such a system (2) Licensee to implement not later than six months after completion of modifications and perform the study discussed in Item II.K.3 2.
conformatory test at the next refueling outage following staff approval of the design unless this outage is scheduled within six months of the ap-proval date.
In this event, modifications will be ecmpleted during the following refueling outage.
Implementetion Schndulo rnd Sammary Item No.
Title R quirement I plementntien
.II.K.3 2 Vendor Report on PORY Provide report to staff.
Maine Yankee intends to participate in the vendor -
Failure Reduction review of the PORV failure rates study. Any schedule for reporting of the results of the vendor efforts are currently beyond the authority of Maine Yanke to commit. The results of this review will be used to determine the necessity for action requested in Item II.K.3 1 above.
II.K.3 3 Reporting Safety and Provide an annual report Maine Yankee currently reports all failures of Relier Valve Failures on SRV and RV failures and safety valves as Reportable Occurrences, and and Challenges challenges as of Jan.1,1981. will commit to include any relief valve failures in future LER reports. Maine Yankee does not consider an additional annual report of challenges to these valves necessary, since these challenges will most probably occur in conjunction with a failure of some other component, and this information would be included with the LER report on the failed component.
II.K.3 5 Automatic Trip of RCP Provide the results of an Maine Yankee will commit to provide the results During a LOCA evaluation of alternative of a study of alternatives to RCP trip by solutions to RCP trips.
January 1,1981.
In the meantime, Maine Yankee will keep in place procedural requirements te manually trip the RCP, derived from NRC SB-LOCA procedure guidelines.
II.K.3 17 Report on Outage of Provide a report detailing Maine Yankee intends to submit a report on the ECCS During the Last outage dates, and lengths outage of ECC System by January 1,1981.
Five Years of outages for all ECCS for the last five years of operation.
II.K.3 30 Revised SB-LOCA Methods Submit analysis model for Maine Yankee intends to revise SB-LOCA Methods to Show Compliance with staff approval.
to show compliance with 10 CFR 50, Appendix K by 10 CFR 50, Appendix K July 1,1983 II.K.3 31
' Plant Specfic Calcula-Submit the results of an Maine Yankee intends to demonstrate compliance tions to Show Compliance evaluation to the staff.
with 50.46 within one year after NRC approval of with 10 CFR 50.46 SB-LOCA Methods,. revised in accordance with Item II.K.3 30.
7 _
Irplement tion Schrdulo end Summarf Item No.-
Title Requirement implementation III.D.3.4
~ Control Room Assure that control room Maine Yankee commits to perform a' Control Room.
Habitability operators will be adequately' Habitability study in conformance with the protected against the guidance provided in Enclosure 4 to Reference effects of accidental (b).
The results of the study including a release of toxic and description of any modifications deemed necessary radioactive gases.
and projected schedule for their completion shall be submitted to NRC staff review on or before January 1,1981. Maine Yankee anticipates that any modifications, should they be necessary, will be completed by January 1, 1983
.