Memorandum & Order Re Intervenors Contentions.Accepts State of Il Contentions 4 & 4(b),6 W/O Subparagraphs 6(a)-6(d),7 as Modified & Others.Grants Consolidation of Certain Contentions Upon NRC Motion
ML19323G802
Person / Time
Site: 05000599, 05000600
Issue date: 05/30/1980
From: Bright G, Holton R, Wolf J
Atomic Safety and Licensing Board Panel
To:
ILLINOIS, STATE OF, NRC OFFICE OF THE EXECUTIVE LEGAL DIRECTOR (OELD)
Shared Package
ML19323G803 List:
References
NUDOCS 8006090049
Download: ML19323G802 (15)


Text

_

'N s\\

I/

t

/

UNITED STATES OF AMERICA ecc.,c2 6\\

NUCLEAR REGULATORY COMMISSION

,[

num0 D,.

ATOMIC SAFETY AND LICENSING BOARD MAY30 @

  • C:f: :f thsSW f

John F. Wolf, Chairman e#

o.: ting Mdt:

Dr. Rob 2rt L. Holton Ecjy

's Glenn O. Bright G/

c: t \\ ;) '

f In the Matter of

)

)

COMMONWEALTH EDISON COMPANY,

)

Docket Nos. S50-599 ET AL.

)

S50-600

)

(Carroll County Station Site)

)

MEMORANDUM AND ORDER RE:

CONTENTIONS Following a Special Prehearing Conference en Wednesday, Septenber 19, 1979, at the Nahman Diehl Auditorium in Mt. Carroll, Illinois, the Board issued a Memorandum and Order dated October 10, 1979.

The contentions of the parties which had been tentatively accepted for litigation regarding early site suitability approval were set forth in that Order.

The Applicants, the NRC Staff and the Intervenors were given thirt.y days in which to submit briefs in support of any contentions which were previously filed and which had been rej ected by the 3 card.

Additionally, the Board agreed to weigh again the accept-ability of any contentions which it had accepted but as to which a party wished to argue for rejection.

"'he parties have respended to the Board's Crder a.d in the light of these respcases the Board finds as fellcws.

r

(

e 80060f0d5M

O I.

The State of Illinois Contentions (a)

Ths Board rej ects as irrelevant to this early site suitability hearing (10 CFR Part 2, Subpart F). Illinois Contentions 1; 2; 3; 4(a); [6(a) thru 6(d)iv;]; 10; 11; 12; 13; 14; 17 and 18.

(b)

The Board accepts the State of Illinois (Illincis)

Contentions 4 and 4(b) as set forth in the list of accepted contentions which are at issue in the above indicated =acter.

The Board accepts Illinois Contention 5, as modified in the listing below in this Order of consolidated contentions in Section VI 'tonsolidacien of Contentions".

It is identified therein as Consolidated Issue I.

Illinois' Contention 6 (without subparagraphs 6(a) thru 6(d)) is accepted as a contention in the proceedings.

The modified versien is set forth below in this Order with other consolidated contentions in Section VI " Consolidation of contentions".

It is identified as Consolidated Issua 2.

Illinois' Contention 7, as modified, is accepted an issue.

The modified version is set forth below in this Order with other ensolidated cententions in Section VI "Consolidaticn of Contentions".

It is identified therein as Consolidated Issue 3.

s O

3-Illinois' Contentions 8 and 9 are accepted.

Illinois' Contention 15, as nodified, is accepted as an issue.

The modified versicn is set forth below in this order with other consolidated contentions in Secti:n VI

" Consolidation of Contentions".

It is identified as

~

Consolidated Issue 4.

Illinois' Contention 16 is accepted as an issue.

(c)

The following Illinois contentions have been accepted as issues in controversy in the early site suitability hearings:

Illinois contentions 4; 4(b) ; 5; 6; 7; S; 9; 15 and 16.

(N. 3. Contentions 4; 5 ; 6 ; 7 and 15 have been l

modified as stated in paragraph I(b) above.

l (d)

At the hearing at Mt. Carroll, Illinois, Wednesday, September 19, 1979, the State of Illinois filed what it denominated as a motion for reconsideration.

The procedure established by the Board at the hearing provided for reconsideration before a final deter-mination as to the acceptability of the contention was made.

Such a reconsideration has been carried out.

The State of Illinois ' reliance on the abolition of the so-called "i= mediate effectiveness rule" under an initial decision directing that the issuance of an acendment of a construction permit, a construction authorization, or

4-an operating license should be effective i= mediately upon issuance, is misplaced.

The early site suitabi14:7 approval did not come within the purview of that procedure.

It's second request in the " motion" is that Contention 3 be reinstated so that cost benefit balancing be an issue in the early site suitability proceedings.

The finding G.6 of the Report of The President's Commission on The Accident at Three Mile Island, relied upon by the State of Illinois, is also misplaced in an early site suitability proceeding since in such proceedings under 10 CFR 5 2.606 no limited work authorizations may issue and no construction permit may be granted without completion of the full review required under Section 102(2) of the National Environmental Policy Act of 1969, as amended, and 10 CFR Part 51.

In the Board's judgment there is no basis at this time on which to attempt cost benefit balancing.

(Cf. In Matter of Potomac Electric Power Company (Douglas Point Units 1 and 2),

1 NRC 539 (1975).)

The State of Illinois request to reinstate Contention 3 is denied.

i e

w

O The State of Illinois request to reinstate its Contentions 6 (d)(iv), 14(a) and (b), and 18 is denied since they raise issues which are not relevant at an early site suit-ability hearing.

Such issues should be raised at construction pn.rmit and/or operating license hearings.

The question of per=anent fuel disposal raised by Illinois' Contention 11 is not within the jurisdiction of this Board and therefore Illinoid request that the Board reinstate Contention 11 is denied.

The Board denies the request of the State of Illinois that Contention 12 be reinstated.

It is not an issue for which the Applicant now seeks review.

The Board granted Appliemats permission to withdraw finding #31 from their proposed findings.

Accordingly, it is not a natter for review at the early site suitability hearing (10 CFR 5 2.604).

The Board has reconsidered the acceptability of all of the State of Illinois' proposed contentions.

The result of

' that reconsideration is set forth above.

'l

i 1

i 6-II.

Jo Daviess County Ad-Hoc Co=nittee on Nuclear Enerzy "Information" Contentions 1.

In response to the Jo Daviess County Ai-Hoc Committee's (Jo Daviess County) motion to reconsider the order of October 10, 1979, this Board has reviewed all of Jo Daviess County's contentions and the Board finds as follows:

(a)

Contention I is rej ected in its entirecy.

The Board has concluded that concention 1(b), the acceptability of which was held in abeyance at the September 19, 1979 hearing, should not be put in controversy until the construction permit stage.

It does not raise an issue as to which the Applicants requested approval at the site suitability hearing.

(b)

The Board accepts the Jo Daviess Contention II as modified in the listing of consolidated contentiens in Section VI, below.

It is identified therein as Consolidated Issue I.

Other issues raised in Jo Daviess Contention II should be raised at the construc-tion and/or operating license hearings.

i l

l

9 7-(c)

The Board accepts Jo Daviess Contention III as modified in the listing below in this Order in Section VI " Consolidation of Contentions".

It is identified therein as Consolidated Issue 2.

The Board accepts Contentions III(a); III(c),

as modified by inserting the word exclusion before the last word in the Contention i.a area, III(d) ; III(e);

III f as modified; III(i) as modified; and III(j) as modified.

The Board rej ect the Jo Daviess Contention III(b); III(g); and III(h).

(d)

The Board accepts Contentions IV(a); IV(d) ;

IV(e) ; V(a) (4) ; and V(b), all as modified in the listing of consolidated contentions set out below in this Order in Section VI " Consolidation of Contentions".

They are identified therein as consolidated issue 4, "Socio-econcmic Risks".

(e)

The Board accepts Contention IV(c) as modified in the listing of consolidated contentions set out below in this Order in Section VI " Consolidation of Contentions".

It is identified therein as consolidated issue 3, "Stransky Airport".

(f)

Contention IV(b) previously accep:ed as an issue in ccatreversy, is upon reconsideration rej ected.

D' I

nn~

+

O 8-Contention IV(b) deals with overt military targets.

Applicant has pointed out that "10 CFR S 50.13 expressly provides that an applicant for an operating license need not provide the design features or other measures for the purpose of protecting against the effects of attacks or acts of destruction by an enemy of the United States" whether a foreign government or other person.

Maccers covered by IV(b) are expressly excluded frem the licensing process by 10 CFR S 50.13.

IV(b) is dismissed as an impermissible challenge to the Coc=ission's regulations (10 CFR 2.758).

(g)

The Board accepts Contention V(a)(3); Contention V(a)(4) as modified in Section VI " Consolidation of Conteations", issue 4 therein.

1 The Board rej ects Contentions V; V(a); V(a)(1);

V(a)(2); V(a)(5).

The Board rejects the Jc Daviess Centention V(c) and substitute Contention V(a)(1)(2).

(Transmission lines will be considered at the construction permit stage.)

(h)

Contention VI is rej ected.

The Board also rejects the proposed substitute Contentien VI mad suggests that it might be c:nsidered at the construction per=it stage.

.~. +.

2--

_9 (i)

Jo Daviess County, on page 4 of its motion to reconsider in paragraph I, renews its oral motion to stay all proceedings "until the NRC Staff has com-placed its report."

At the hearing on September 19, 1979, that oral motion to discontinue the site suitability hearings was overruled (Tr. 44, line 16).

The 36ard, having the authority to regulate the course of the hearing,. denies the Jo Daviess County motion to reconsider its motion to stay all proceedings until the NRC Staff has completed its " report" (10 CFR S 2.718(e)).

III.

Iowa Socialist Party Contentions (ISF)

(a)

Contention 1(a)(i) and Contention 1(a)(ii) both as modified in the listings of consolidated contentions below in this Order, i.e.,Section VI " Consolidation of Contentions" are accepted as modified in Consolidated Issues 5 and 1 respectively: Contentions 1(b)(i), (ii) and (iii) as modified in the listing below in this Order of consolidated contentiens 4

in Section VI " Consolidation of Contentions", identified as Consolidated Issue 4; are accepted.

(b)

Contention 1(c)(i) and Contention 1(c)(ii) are rej ected at this preliminary hearing stage.

.(c)

Contention 1(d)(1) and Contention 1(d)(ii) are act acceptable at this early site suitability hearing stage.

o

O

. (d)

Cententions 2 and 3 are rejected as being beyond the scope of the site suitability review.

(e)

All Iowa Socialist Party Contentions not specifically accepted are rej ected.

IV.

Iowa Public Interest Research Groue. Inc. Contentions (a)

Iowa Public Interest Research Group's (Iowa PIRG)

Contention 1 is acceptable as modified in the listing below in this Order of consolidated contentions in Section VI

" Consolidation of Contentions".

It is set forth there as Contention 1. " Plum River Fault".

(b)

Contention 2 is rej ected as a challenge to Cocmission regulations 10 CFR S 2.758.

(c)

Contention 3, as modified, is accepted.

It is the basis in part for the socio-economic contention set out in the listing below in Section VI " Consolidation of Contentions".

It is the basis in part of Consolidated Issue 4.

(d)

Contention 4 is rej ected.

(e)

Contention 5 is rejected.

(f)

Contention o is rej ected.

(g)

Contention 7 is accepted.

However, it is consolidated with Iowa Socialist Party Contentien 1(a)(i) and is set forth as =odified in Section VI " Consolidation of Contentions", below.

(see censolidated Contention 5.)

. (h)

Contention 8 is rej ected.

(1)

Contention 9 is rej ected.

This contention mad any other contentions which are relevant may of course be raised at construction permit and operating licenses hearings.

(j )

Contention 10 is accepted as modified in listing below in this Order of consolidated contentions in Section VI

" Consolidation of Contentions".

It is identified therein under the heading 2 " Terrestrial and Aquatic Ecology".

(k)

In its brief dated October 22, 1979, Iowa PIRG moves the Board to issue "a prohibition against Applicants from proceeding to negotiate or sign any contracts for mining, milling or processing or uranium fuel, either prior to, or on the basis of, any findings of the licensing board during the early site review of the Carroll County Units."

The Board denies said motion for lack of jurisdiction.

V.

Contentions of Citizens Against Nuclear Power (CANP)

Contentions 1; 2; 3; 4; 5; 6; 7; 8; 9; 10 11; 12; 13; 14; and 15 are rejected as issues in the early site suitability hearing.

Many, if not all, of these contentiens will, if offered, be acceptable at later hearings in this matter.

CANP's petition to be allowed to file an additional contention is denied since it does not conform to the require-ments of late filing.

+..

With the rejecticn of all of CANP's James Runyan's joint concentions, the joint petition to intervene filed en their behalf cust be denied.

They cannot be considered parties at this time.

However, CANP will be kept on the Service List in this Docket and will have, of course, the right to submit a petition to intervene at the later construction per=it_ stage hearings.

VI.

Consolidation of Contentions The NRC Staff motion, pursuant to 10 CFR S 2. 715 (a),

to consolidate the prosecution of the following contentions under a representative of the Intervenors' selection on the ground that their interest in these matters is indistinguishable and that the contentions listed below raise substantially the same question for adjudication, is granted.

The modified cententions as to which consolidation is granted follow.

These overall contentions contain only those issues accepted by the Board, supra.

1.

Plum River Fault Applicants have failed to show by accepted geologic standards that the Plum River fault, which runs within 5.5 miles of the site is not a capable fault in determining site geologic suitability and that the safety measures

O that will be necessary to insure that the continued working integrity of the proposed reactors will be adequate.

(

Illinois Contention #5; Iowa FIRG Contention #1; f

Jo Daviess Contention #II; ISP Contention # 1(a)(ii).

2.

Terrestrial and Acuatic Ecoloev Applicants have failed to accurately evaluate the i

effect of the proposed reactors on the terrestrial and aquatic life in the proposed exclusion area; the site area generally and especially in the upper Mississippi River Fish and Wildlife Refuge.

The requirements of the National Environ = ental Policy Act; 10 CFR Part 20; and 10 CFR Part 51 have not been cet in Applicants' Early

)

Site Review.

i

(

Illinois Contention #6; Iowa PIRG Contention #10;

]

fJoDaviessContention#III.

3.

Stranskv Airuort There are unacceptable risks to the public health and safety due to the difficulties concerning approach and departure from Carroll County's Stransky Memorial Field which lies 2.3 miles from the proposed site for the nuclear power plant.

(

Illinois Contention #7; fJoDaviess. Contention #IV(c).

4.

Socio-Economic Risks There are unacceptable socio-economic losses for the inhabitants of the surrounding area which would result from using the proposed site to construct and operate a nuclear power plant.

(

Illinois Contention #15; Iowa PIRG fContention#3except 3(a) and reference

(

to transmission lines.

ISP Contention #1(b).

(

Jo Daviess Contentions #IV(a); IV(d); IV(e);

V(a) (4) and V(b).

5.

Roads At Site There is a lack of safe and adequate roads in the site area for transportation to and from the site and for evacuation in the event of an onsite accident.

There are very limited options for away from downwind evacuation in the event of an accident requiring such action.

(

ISP Contention #1(a) (i) ;

fIowaPIRGContention#7.

h

O IT IS SO ORDERED.

THE ATOMIC SAFETY AND LICENSING BOARD L : /, [..'

n.:. i...

Robert L. Holton

~

q r

E

/_ W Am $1 s

Glenn O. Bright t-M wv.1

(

I 1

Dated at Bethesda, Maryland this 30th day of May 1980.

e O

e