Responds to NRC Re Violations Noted in IE Insp Repts 50-498/80-05 & 50-499/80-05.Corrective Actions: Applicable Personnel Have Been Reminded to Provide Timely Replies & Notification to NRC
ML19323G782
Person / Time
Site: South Texas  
Issue date: 05/07/1980
From: Eric Turner
HOUSTON LIGHTING & POWER CO.
To: Seidle W
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
Shared Package
ML19323G779 List:
References
ST-HL-AE-462, NUDOCS 8006090021
Download: ML19323G782 (3)


Text

.

O The Light Company Hem U hnng& Pwer m &>x GOO Hmm,TexaG700HmW8MH 8

May 7, 1980 ST-HL-AE-462 SFN: C-0570 Mr. W. C. Seidle, Chief Reactor Construction 6 Engineering Support Branch U.S. Nuclear Regulatory Commission Office of Inspection and Enforcement Region IV 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76012

SUBJECT:

SOUTH TEXAS PROJECT ELECTRIC GENERATING STATION RESPONSE TO NRC INSPECTION FINDINGS DOCKET NOS. 50-498/80-05 AND 50-499/80-05

Dear Mr. Seidle:

The following is our response to the items of noncompliance identified in IE Inspection Report Nos. 50-498/80-05 and 50-499/80-05, dated April 4, 1980 (received by Houston Lighting 6 Power Company on April 7, 1980).

1.

Failure to Provide Timely Reply to the Transmittal Letter for an Item of Noncompliance (Bulge in Containment Liner)

Corrective Action Letters have been sent to all applicable personnel emphasizing the importance of adhering to the specified requirements as referenced in the notice of violation.

Recurrence Control Same as corrective action.

Date Action to be Completed The letters were transmitted on May 7, 1980.

2.

Failure to Provide Timely Notification of Construction Deficiencies (Polar Crane Stud Welds)

Corrective Action Letters have been sent to all applicable personnel emphasizing the importance of adhering to the specified requirements as referenced in the notice of violation.

8006090hs742 l

i Houston Lighting & Power Company Mr. Seidle May 7, 1980 Page Two Recurrence Control Same as corrective action.

Date Action to be Completed The letters were transmitted on May 7, 1980.

3.

Failure to Provide Timely Notification of Construction Deficiencies (Brown & Root QA Program for Welding)

Corrective Action Letters have been sent to all applicable personnel emphasizing the importance of adhering to the specified requirements as referenced in the notice of violation.

Recurrenct Control Same as corrective action.

Date Action to be Completed The letters were transmitted on May 7, 1980.

4.

Failure to Provide a Timely Written Report for a Construction Deficiency (Low Relative Density of Backfill)

Corrective Action Letters have been sent to all applicable personnel emphasizing the importance of adhering to the specified requirements as referenced in the notice of violation.

Recurrence Control Same as corrective action.

Date Action to be Completed The letters were transmitted on May 7, 1980.

Y truly yours,

. 47.

E. A. Turner, Vice President Power Plant Construction G Technical Services EAT:rka j

l

=

liouston Lighting & Power Company 4

Mr. Seidle May 7, 1980 Page.Three cc: Messrs. G. W. Oprea, Jr.

M. L. Borchelt (CPL)

R. L. Range (CPL)

J. B. Poston (CPS)

A. vonRosenberg (CPS)

R. L. Hancock (COA)

M. C. Nitcholas (COA)

H. R. Dean R. L. Waldrop C. L. McNeese D. G. Barker R. A. Frazar W. N. Phillips L. D. Wilson G. B. Painter M. D. Schwarz (Baker 6 Botts)

C. G. Thrash (Baker G Botts)

H. S. Phillips (NRC)

J. R. Geurts (BSR)

C. W. Vincent (BSR)

STP RMS l,

4 1

6 5

d

- - -.