ML19323G632

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 80-001/01X-1
Date released: 12/03/2019 Download: ML19323G632


Revised LER 80-001/01X-1:on 800123,results of Load Study Performed on Es Busses Determined Overload Could Exist on 1P & 1S Busses Upon Loss of Es Channel & One of Four Situations.Caused by Inadequate Design
ML19323G638
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/30/1980
From: Mitchell D
METROPOLITAN EDISON CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19323G638 (3)
Forwards Revised LER 80-001/01X-1
ML19323G631
Person / Time
Site: Crane Constellation icon.png
Issue date: 05/30/1980
From: Herbein J
METROPOLITAN EDISON CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19323G631 (1)