_ - - - _ _ _ _
e v
-. : :2 James W. Durham
_ POdfand General ElectricCcupnny Vice President and GeneralCounsel amm Legal Department Senior Assistant GeneralCounset Alvin Alexanderson Warren Hastings May 20, 1980 Assistant GeneralCounset Roland A. Johnson maM WMnson Marshall E. Miller, Esq., Chairman aHad March Atomic Safety and Licensing Board Steven F. McCarrel U. S. Nuclear Regulatory Commission (g )
Y Washington, D. C.
20555
" *...- 3
~
~l.7. '. ~,
g,
]9J Dr. Kenneth A. McCollom, Dean Division of Engineering, S ' i. / ' ' i $20 >
Architecture & Technology 2
Oklahoma State University g;g g.,,, ;-g 7 7
Stillwater, Oklahoma 74074
- ' c ;'.
- ,
- ..
- :
f,,,
,~
Dr. Hugh C. Paxton
'/
h+' -
1229-41st Street los Alamos, New Mexico 67544 Gentlemen:
Attached to this letter is a list of Requests for Design Changes (RDCs) associated with the modification program described in the Report on Design Modifications for the Trojan Control Building (P2-iO20). These items are modifications involving piping supports necessary to qualify
~
piping systems for response spectra developed in accordance with PGE-1020, Appendix B.
The items on this list will not individually or collectively with other modifications reduce the shear capacity of any major shear wall by greater than 1 percent. Nor do the items involve weight additions which may result in an increase of greater than 1 percent of the calcu-laced lateral forces in any major shear wall.
The Licensee will continue to keep the Board informed of activities at Trojan as described at the March 30, 1979 Prehearing Conference (Tr. 3204-05).
Sincerely,
\\
~
~
t./M Steven F. McCarrel l
Attachment j
c:
R. H. Engelken Nuclear Regulatory Commission b
Region V O
\\
Robert A. Clark Nuclear Regulatory Commission 1300 Willamette Center 121 S.W. Salmon Street, Portland, Oregon 97204 8 0 0 6 0 6 0363 J)
=
ATTACHMENT Following is the list of Request for Design Change (RDC) work items for which field work may be performed within the next few weeks.
The relationship of the work with the Control, Auxiliary and Fuel Building structures is briefly sumarized below:
RDC No.
Modification Relationship 79-028 Job No. 159: A new sway The support is mounted to the strut assembly was added to bottom of the 61-f t elevation a 24-in. diameter line in floor slab in the Fuel Building.
the Component Cooling Water There is no change to the System, HBD-27-4 (SR811).
existing structural members.
Job Nos. 181 & 192: New The restraint is mounted to bracing is being added to the elevation 45-f t floor slab the restraint for a,14-in.
in the Auxiliary Building.
diameter line in the Component Cooling Water System, HBD-32-2 (SR67 &
SR68).
j Job No. 187: A new base The support is mounted on the plate is being added to a wall of the Spent Fuel Pool vertical restraint on a and the floor steel in the 10-in. diameter line in the Auxiliary Building facade.
Spent Fuel Pool Cooling System, HCC-48-1 (SR34).
Job No. 83: A new restraint The support is being attached is being added to a 3-in.
to the bottom of the floor diameter line in the Waste slab at elevation 107'-6" in Gas System, HCC-63-2 (SR300).
the Auxiliary Building.
Weight addition is about 40 lbs.
Job No. 94: Stiffener The restraint is wall-mounted plates are being added to a at elevation 67 ft in the i
restraint on a 3-in. line Auxiliary Building. Total in the Chemical and Volume weight addition is about 5 lbs.
Control System, CS-151R-9-3 There is no significant (SR87).
effect on shear walls.
Job No. 168: A stiffener The restraint is located plate is being added to a at elevation 16 f t in the restraint on a 8-in. line Auxiliary Building.
in the Residual Heat Removal System, SI-601R-9-1 (SR110).
Job No. 72: A new restraint The restraint is located at is being added to a 4-in.
elevation 100 f t in the line in the Containment Auxiliary Building. Total Vent Monitoring System, weight is about 50 lbs. There HBD-91-4 ( SR300).
is no significa r offect on shear walls, l
Page Two RDC No.
Modification Relationship 79-028 Job No. 95: A new structural The anchor is located at frame is being installed to elevation 20'-6" in the
~
provide a seismic anchor Auxiliary Building. No shear for a 14-in. line in the walls are affected.
Safety Injection System, SI-151R-10-1 (SA81).
4 e
WLP/3j f 755.43A27
.s J
...,ce;UUisPONDN4CR UNITED STATES Or' AMERICA NUCLEAR REGULATORY COMMISSION
.D G
7
.s s.
./
C00%:n3
"' O b'
BEFORE THE ATOMIC SAFETY AND LICENSING BOARD
- ao > :
1.,
Ci :: y L..'.:c:cf 12
-...a.: a i n ::
,.e ir.:n)
In the Matter of
)
+. k
)
Doeket 50-344 PORTLAND GENERAL ELECTRIC COMPANY,
)
' '.'; # 1 i N ' '
et al
)
(Control Building Proceeding
)
(Trojan Nuclear Plant)
)
CERTIFICATE OF SERVICE I hereby certify that on May 20, 1980, Licensee's letter, dated May 20, 1980 with a list of Requests for Design Changes, has been served upon the persons listed below by depositing copies thereof in the United States mail with proper postage affixed for first class mail.
Marshall E. Miller, Esq., Chairman Atomic Safety and Licensing Appeal Atomic Safety and Licensing Board Panel U. S. Nuclear Regulatory Commission U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Washington, L. C.
20555
~.
Dr. Kenneth A. McCollom, Dean Docketing and Service Section (3)
Division of Engineering, Office of the Secretary Architecture and Technology U. S. Nuclear Regulatory Commission Oklahoma State University Washington, D. C.
20555 Stillwater, Oklahoma 74074 Joseph R. Gray, Esq.
Dr. Hugh C. Paxton Counsel for NRC Staff j
1229 - 41st Street U. S. Nuclear Regulatory Commission los Alamos, New Mexico 87544 Washington, D. C.
20555 Atomic Safety and Licensing Board Iowenstein, Newman, Reis, Axelrad & Toll i
i Panel 1025 Connecticut Ave., N. W.
U. S. Nuclear Regulatory Commission Suite 1214 Washington, D. C.
20555 Washington, D. C.
20036 4
CERTIFICATE OF SERVICE Frank W. Ostrander, Jr., Esq.
Mr. David B. McCoy Richard M. Sandvik, Esq.
348 Hussey Lane Assistant Attorney General Grants Pass, Oregon 97526 State of Oregon Department of Justice Ms. C. Gail Parson 500 Pacific Building P. O. Box 2992 520 S. W. Yamhill Kodiak, Alaska 99615 Portland, Oregon 97204 Mr. Eugene Rosolle William Kinsey, Esq.
Coalition for Safe Power Bonneville Power Administration 215 S. E. 9th Avenue P. O. Box 3621 Portland, Oregon 97214 Portland, Oregon 97208 Columbia County Courthouse Ms. Nina Bell Law Library 728 S. E. 26th Avenue Circuit Court Room Portland, Oregon 97214 St. Helens, Oregon 97051 Mr. John A. Kullberg 15523 S. E. River Forest Drive Portland, Oregon 97222 tm
~
Steven T. McCarrel Assistant Ceneral Counsel Portland General Electric Company
(
l Dated: May 20, 1980 1