-, _.. _ _.,. _. -.., - _. _ _.

m NOTE TO:

William J. Dircks DATE:

April 7, 1980 i

Enclosed are the Weekly Items of Interest for the Office of Nuclear Reactor Regulation for the week ending March 14, 1980. We have also included a status of shutdown plants.

[gd,, M.t~K 3

illiam T. Russell

\\ Acting Chief Technical Support Branch, NRR Attachraent:

As stated Distribution Central files TSB r/f HDenton.

ECase

(

HBerkow WTRussell 4

)

. [ g..

AC..

d..

g o.y.6.i..

......y..,,..

.. J. h:

orrice >

....g g.,go smm-e k om>. 41.Tleo...... 4/..f 8.0...

4/.? /.80......

OFFICE OF NUCLEAR REACTOR REGULATION WEEKLY ITEMS OF INTEREST (Week Ending April 7, 1980)

HADDAM NECK PLANT On March 27, 1980 while operating at 100% power the Haddam Neck Plant experienced a containment isolation signal, a safety injection signal and a reactor scram.

The cause was believed to be an equipment instal-lation error, i.e., a short of contacts during installation of containtient isolation valve control relays in response to Short Term Lessons Learnad requirement 2.1.4.

~

All systems operated as designed and the plant stabilized in a normal but standby condition.

The plant was brought back on line the following morning after the licensee completed an investigation of the event.

I&E will. followup on any additional actions by the licensee.

Plum Brook Test Reactor NASA has requested authorization to dismantle the 60 Kit Plum Brook Test Reactor and the 100 W.4t Mock-Up Research Reactor.

Dismantling plans and environmental plans have been provided in support of these requests.

These reactors have been shutdown since 1973 and have a possession only license.

Vermont Yankee An estimated 1000 people demonstrated peacably Sunday, 3/30/80, in front of the Vermont Yankee plant.

About 75 were arrested because they were blocking the gate at shift change time when the 3/31/80 graveyard shift came on duty, and about another 75 were arrested for the same reason when the 8-4 shift came on duty this norning.

Vermont Yankee shut down 3/31/80 to change control rod patterns and repair a steam leak in the turbine steam seal regulator system. The plant was back in operation April 2,1980.

Humboldt Bay The Atomic Safety and Licensing Board has scheduled a prehearing conference for June 3,1980 in Eureka, California to consider the request of Pacific Gas and Electric that proceedings be held in abeyance until October 1,1980.

'b 2-Pilarim Unit 1 Strikers picketed all gates at Pilgrim Nuclear Power Station commencing 7 A.M.

on April 1, and ending about 7 A.M. on April 2,1980.

Union workers including reactor operators honored the picket lines.

Non-union personnel were not affec ted.

Fuel loading in progress _was not adversely affected.

The 5 R0s on shift were placed on a rotating schedule which allowed ample rest before conducting fuel handling operations, u

1 1

s e

9

< r --

- - - ~

-m

~. - -.

e-y

. STATUS OF SHUTDOWN PLANTS (April 2,1980)

Restart Date Beaver Valley Refueling / Design Changes 7/22/80 5/15/80 Brunswick 2 Refueling 5/15/80 Cooper Refueling Unknown Crystal River 3 Mode 5 - Cleanup RB & Refuel Unknown Dresden 1 Chemical Cleaning Dresden 3 Refueling & & t Pump Repairs 4/14/80 4/15/80 Duane Arnold Defueled Unknown P.-t Calhoun Refueling App. 5/15/80 Ginna Refueling Hatch 2 Vent Header Mod. for Torus 5/20/80 Unknown Humboldt Bay Seismic Evaluation Unknown Indian Point 1 ECCS 4/5/80 Monticello Refueling Oconee 2 Refueling 6/3/80 Oconee 3 ESF & Containment Insp. Sys. Mod.

4/13/80 Oyster Creek Refueling and Maintenance 5/1/80 Palisades Refueling 5/1/80 Unknown Peach Bottom 2 Refueling Pilgrim 1 Refueling 4/14/80 Unknown Point Beach 1 Steam Gen. Insp.

Unknown Quad Cities 2 Refueling Rancho Seco Refueling 4/5/80 6-8 weeks St. Lucie 1 Refueling 1 month Surry 1 Turbine Outage Unknown Surry 2 St. Gen. Replacement Unknown Three Mile Island 1 Order Unknown Three Miles Island 2 Acciden.

Yankee Rowe Turbine Repair September 1980

)

i