m NOTE TO:
William J. Dircks DATE:
April 7, 1980 i
Enclosed are the Weekly Items of Interest for the Office of Nuclear Reactor Regulation for the week ending March 14, 1980. We have also included a status of shutdown plants.
[gd,, M.t~K 3
illiam T. Russell
\\ Acting Chief Technical Support Branch, NRR Attachraent:
As stated Distribution Central files TSB r/f HDenton.
ECase
(
HBerkow WTRussell 4
)
. [ g..
AC..
d..
g o.y.6.i..
......y..,,..
.. J. h:
orrice >
....g g.,go smm-e k om>. 41.Tleo...... 4/..f 8.0...
4/.? /.80......
OFFICE OF NUCLEAR REACTOR REGULATION WEEKLY ITEMS OF INTEREST (Week Ending April 7, 1980)
HADDAM NECK PLANT On March 27, 1980 while operating at 100% power the Haddam Neck Plant experienced a containment isolation signal, a safety injection signal and a reactor scram.
The cause was believed to be an equipment instal-lation error, i.e., a short of contacts during installation of containtient isolation valve control relays in response to Short Term Lessons Learnad requirement 2.1.4.
~
All systems operated as designed and the plant stabilized in a normal but standby condition.
The plant was brought back on line the following morning after the licensee completed an investigation of the event.
I&E will. followup on any additional actions by the licensee.
Plum Brook Test Reactor NASA has requested authorization to dismantle the 60 Kit Plum Brook Test Reactor and the 100 W.4t Mock-Up Research Reactor.
Dismantling plans and environmental plans have been provided in support of these requests.
These reactors have been shutdown since 1973 and have a possession only license.
Vermont Yankee An estimated 1000 people demonstrated peacably Sunday, 3/30/80, in front of the Vermont Yankee plant.
About 75 were arrested because they were blocking the gate at shift change time when the 3/31/80 graveyard shift came on duty, and about another 75 were arrested for the same reason when the 8-4 shift came on duty this norning.
Vermont Yankee shut down 3/31/80 to change control rod patterns and repair a steam leak in the turbine steam seal regulator system. The plant was back in operation April 2,1980.
Humboldt Bay The Atomic Safety and Licensing Board has scheduled a prehearing conference for June 3,1980 in Eureka, California to consider the request of Pacific Gas and Electric that proceedings be held in abeyance until October 1,1980.
'b 2-Pilarim Unit 1 Strikers picketed all gates at Pilgrim Nuclear Power Station commencing 7 A.M.
on April 1, and ending about 7 A.M. on April 2,1980.
Union workers including reactor operators honored the picket lines.
Non-union personnel were not affec ted.
Fuel loading in progress _was not adversely affected.
The 5 R0s on shift were placed on a rotating schedule which allowed ample rest before conducting fuel handling operations, u
1 1
s e
9
< r --
- - - ~
-m
~. - -.
e-y
. STATUS OF SHUTDOWN PLANTS (April 2,1980)
Restart Date Beaver Valley Refueling / Design Changes 7/22/80 5/15/80 Brunswick 2 Refueling 5/15/80 Cooper Refueling Unknown Crystal River 3 Mode 5 - Cleanup RB & Refuel Unknown Dresden 1 Chemical Cleaning Dresden 3 Refueling & & t Pump Repairs 4/14/80 4/15/80 Duane Arnold Defueled Unknown P.-t Calhoun Refueling App. 5/15/80 Ginna Refueling Hatch 2 Vent Header Mod. for Torus 5/20/80 Unknown Humboldt Bay Seismic Evaluation Unknown Indian Point 1 ECCS 4/5/80 Monticello Refueling Oconee 2 Refueling 6/3/80 Oconee 3 ESF & Containment Insp. Sys. Mod.
4/13/80 Oyster Creek Refueling and Maintenance 5/1/80 Palisades Refueling 5/1/80 Unknown Peach Bottom 2 Refueling Pilgrim 1 Refueling 4/14/80 Unknown Point Beach 1 Steam Gen. Insp.
Unknown Quad Cities 2 Refueling Rancho Seco Refueling 4/5/80 6-8 weeks St. Lucie 1 Refueling 1 month Surry 1 Turbine Outage Unknown Surry 2 St. Gen. Replacement Unknown Three Mile Island 1 Order Unknown Three Miles Island 2 Acciden.
Yankee Rowe Turbine Repair September 1980
)
i