Forwards Response to NRC 800229 Confirmatory Order Requiring Establishment of Onsite Emergency Preparedness Manning Levels & Temporary Onsite Interdisciplinary Review Group.Manning Levels & Review Group Established
ML19323G094
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 05/28/1980
From: Peoples D
COMMONWEALTH EDISON CO.
To: Harold Denton
Office of Nuclear Reactor Regulation
References
NUDOCS 8005300373
Download: ML19323G094 (2)


Text

7_

Commonwe:Ilh Edison g

one Firi,t National Plaza. Chicago. Ilknois Address Reply to: Post Office Box 767 Chicago. Illinois 60690 May 28, 1980 Mr. Harold R. Denton, Director Of fice of Nuclear Reactor Regulation U.S. Nuclear Regulatory Commission Washington, DC 20555

Subject:

Zion Station Units 1 and 2 Implementation of Ninety Day Items of Confirmatory Order NRC Docket Nos. 50-295 and 50-304 Reference (a): February 29, 1980, letter from i

H. R. Denton to D. L. Peoples.

I

Dear Mr. Denton:

l Reference (a) contained a Confirmatory Order dated February i

29, 1980, for Zion Station Units 1 and 2.

That Order required i

Commonwealth Edison Company to perform certain actions within ninety 1

(90) days of the date of the Order.

Attachment A to this letter

}

provides Commonwealth Edison's response to those items.

i Please address any questions that you might have concerning I

this matter to this office.

4 One (1) signed original and thirty-nine (39) copies of this transmittal are provided for your use.

Sincerely,

^

1 D. L. Peo les Director of Nuclear Licensing OLP:WFN:a1 l

Attachment l

4122A 3

NRC Docket Nos. 50-295/304 ATTACHMENT A Commonwealth Edison Company's response to the NRC Staff'S ninety (90) day items of Section D of Appendix A in Reference (a) follow.

4 0.1. The licensee shall establish the on-site emergency preparedness manning levels on each shift as contained in 4

Table 1 attached to this Appendix.

Commonwealth Edison Company has established the on-site emergency preparedness manning levels on each shift as contained in Table 1 of Appendix A in Reference (a).

'4 0.2. The licensee shall establish a temporary on-site inter-disciplinary review group consisting of, as a minimum, representatives from the NSSS vendor, the architect-engineer and the plant maintenance and operations staf fs.

This group shall review and concur in all existing plant emergency procedures.

This group shall also review and concur in changes to emergency procedures.

Emergency i t changes may be approved in accordance with current licensee requirements, but shall be subsequently submitted for approval by the review group.

.j Commonwealth Edison Company has established the j

subject review group consisting of representatives from the

n NSSS vendor, the architect-engineer and the plant maintenance staff.

However, since every EOP (Emergency Operating Procedure) and any change to an E0P is initially reviewed by an operating engineer during the On-Site Review Function, a representative from the operations staff has t

not been assigned to this review group.

This will avoid duplicative reviews by the operating staff.