ML19323F964
| ML19323F964 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 04/26/1980 |
| From: | Pollard R Chesapeake Energy Alliance |
| To: | METROPOLITAN EDISON CO. |
| Shared Package | |
| ML19323F963 | List: |
| References | |
| NUDOCS 8005300037 | |
| Download: ML19323F964 (2) | |
Text
,
UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE Ti!E ATOMIC SAFETY AND LICENSING BOARD In the Matter of'
)
U METROPOLITAN EDISON COMPANY
(
s t?
(Three Mile Island, Unit 1)
)
GA SUPPLSENTARY INTI3RCG ATO3IES TO LIGNSE2 In its Response to First Set of Interrogatories of Chesapeake Energy Alliance, (3/31/80)
Licenst
- stated in respone to CEA Interrogatory 5-9 that "The Epinor II Radvaste Synten has operated as projected. Decontaminaticn of intcrr.ediate level water has proceeded as originally scheduled." Hovrever, the TMI-2 Weekly Status Report distributed by the NRC's TMI-2 Program Office, dated April 14, 1980, states that "EPICOR II was started on April 7,1980... af ter an extensive cutage for several modifications."
CEA hereby requests that Licensee answer the fellowing interrogatories, filed within 30 days af the receipt of the information received in the TMI-2 Weekly Status Report cited above.
5-13 Describe the extent cf the outage of EPICCR II, and identify and descrite the nature cf the " severs 1 modificatiens".
5-14 Reconcile the information provided in the TMI-2 Weekly Status Report With Licensee s earlier response to GA Irterrogatory 5
'), a response that appears to be in direct conflict with that $Ox. nation, 5-15 Identify any and all other ways in which EFICOR-!I has not functioned as originally projected, and that were a t reported by Licensee in its response to GA's Interrogatory 5-9.
R.r.pectfully sub:1 ted
/
p l
, e f(
u Robert Q. Pollard, for CEESAFEAKE ENEPM ALLIANG INC.
Dated April 26, 1980 8
s e
CCcxm3 \\.4 U :;.m
\\__,
g7 I'IAY2 C Gsg 3 CilicaetgY!ek 3 n
UU4 y
een c) /
g i
8005300037
GA-80.04.26 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE TIIE ATOMIC SAFETY AND LICF.NSING BOARD In the Matter of *
)
)
Docket tio. 50-289 METROPOLITAN EDISON COMPANY
)
(Restart ?)
)
(Three Mile Island, Unit 1)
)
CRTIFICATE OF SERVICL' I do hereby certify that I served a true and correct copy of the following document (s) on the below listed parties by first-class mailing:
GA'S FJRTIER ESPCNSE TO LIGNSEE'S FIRST SET OF INTERROGATORIES
( 2 A: RESP:LIC: DIS-80.04,26)
GA SUPPEMENTARY INTERECGATORIES TO LIGNSEE (GA: DIS LIC-80.04.26)
Ivan W. Smith, Esquire George F. Trowbridge, Esquire Atomic Safety & Licensing Board Panel Shaw, Pittman, Potts & Trowbridge U.S. I'uclear Regulatory Commission 1800 M Street, N.W.
Washington, DC 205T5 Washington, DC 20006 Dr. Walter H. Jordan Docketing and Service Section 881 West Outer Drive U.S. Nuclear Reguh.M f Cc= mission Oak Ridge, TN 37830 Washington, DC 20555 Dr. Linda W. Little Executive Legal Director l
5000 Hermitage Drive U.S. Nuclear Regulatory Ccmmission Raleigh, NC 27612 Wauhington, DC 20555 l
O
. l,:
, y (4
, /ff, "
s.
+
Dated: t.pril 26, 1980 Robert Q. Pollard, for l
CESAPEAE EliERGY ALLIANC, INC.
j i
l i