ML19323F862

From kanterella
Jump to navigation Jump to search
Summarizes 790820 Telcon Clarifying Facility Sensitivity Study.Study Should Be Run W/One Pump in Each Loop Trippped at 73 Minutes.Calculation Should Be Run to 100 Minutes to See If Change Would Significantly Alter Accident
ML19323F862
Person / Time
Site: Crane Constellation icon.png
Issue date: 08/20/1979
From: Cunningham M, Chon Davis
EG&G IDAHO, INC., EG&G, INC., NRC OFFICE OF NUCLEAR REGULATORY RESEARCH (RES)
To:
EG&G IDAHO, INC., EG&G, INC.
References
TASK-TF, TASK-TMR NUDOCS 8005290557
Download: ML19323F862 (1)


Text

- _ _ _ _ _ _ _ _ _ _ _ _ _ _____.

D 66 6 Idaho, Inc.

MEMO 0F CONVERSATION FCAu E040-Mt e n, e.rry e

C' 8* 00VIS 8/20/79 PERSON CALLING.

DATE EG&G Idaho, Inc./IflEL

30 cm REPAESENTING.

TIME FERSON CALLED:

liark Cunningnam PHONE NUMBER flRC REPRESENTING.

CITv.

A. C. Peterson Clarification of TMI Sensitivity SUBJECT.

T. R. Charl ton ii. E. Ti l ler, DOE-ID Study J. A. Dearien L. J. Ybarrondo C. A. Dobbe P. H.

Vanaer Hyde o_

c_

t4++onokor nor_in Fi le 2.0 Mark confimed that the TMI sensitivity study designated as D-3 in Tong's letter should be run with one pump in each loop tripped at 73 minutes.

The calculation should be run to at least 100 minutes to see if this chance would sicnificantly alter the accident.

If the results are similar to tne base case, the calculation need not be run very far cast 100 rain utes.

e

'((1 4lM S;GNATURE iCONTiNUE ON REVERSE SIDE)

B 0052 9 0557 p