AECM-80-101, Forwards Interim Deficiency Rept Re Damage to Intermediate Metallic Conduit from Adjustable Threading Dies
| ML19323F258 | |
| Person / Time | |
|---|---|
| Site: | Grand Gulf |
| Issue date: | 05/14/1980 |
| From: | Dale L MISSISSIPPI POWER & LIGHT CO. |
| To: | James O'Reilly NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| Shared Package | |
| ML19323F259 | List: |
| References | |
| AECM-80-101, NUDOCS 8005280706 | |
| Download: ML19323F258 (2) | |
Text
1 g.
y' Ik MISSISSIPPI POWER & LIGHT COMPANY Helning Build Mississippi P. O. B O X 16 4 0. J A C K S O N. MI S SIS S I P PI 3 9 2 0 5
~
May 14, 1980 p ooveriou ospu ruc~r Office of Inspection & Enforcement U. S. Nuclear Regulatory Commission
. Region II 101 Marietta Street, N.W., Suite 3100 Atlanta, Georgia 30^03 ATTENTION:
Mr. J.
. O'Reilly, Director
SUBJECT:
Grand Gulf Nuclear Station Units 1 and 2 Docket Nos. 50-416/417 File 0272/15525/15526 PRD-80/20, Status Report, Damage to Intermediate Mecallic Conduit from
.tijustable Threading Dies AECM-80/101
Dear Mr. O'Reilly:
On April 14, 1980, Mississippi Power & Light Company notified Mr. F.
Cantrell of your office of a Potentially Reportable Deficiency (PRD) at the Grand Gulf Nuclear Station (GGNS) construction site.
The deficiency concerns damage to Intermediate Metallic Conduit (IMC) resulting from adjustable threading dies. The dies produced burrs and sharp edges on the conduit interior and caused cable insulation damage when the cables were installed.
The extent and safety implications of this deficiency remain under investigation. Sample portions of conduit have been tested to determine those sizes that are involved in this deficiency. We are in the process of pulling and inspecting cables in suspect conduits.
We expect to provide our final report and determination of reportability no later then July 15, 1980. Our status report on PRD-80/20 is attached.
This deficiency is O so oeing tracked by Bechtel Management Corrective Action Report (MCAR) - GGNS No. 74.
Yours truly, 0v~PR 4 L.
F. Dale Nuclear Project Manager JGC/JDR:lj
Attachment:
Status Report on PRD-80/20 Mr. Victor Stello, Jr., Director /
\\g cc:
Mr. N. L. Stampley 0
Mr. R. B. McGehee Division of Inspection & Enforcement h h\\
Mr. T. B. Conner U. S. Nuclear Regulatory Commission Washington, D. C.
20555 8 0 05 28 u 70fr Member Middle South Utilities System
~
P r
4 i
i AECM-80/101 i
f bec:
Dr. D. C. Gibbs Mr. A. Zaccaria 4
Mr. J. N. Ward Mr. D. M. Lake Mr. J. P. McGaughy l
Mr. W, L. Nail
~
Mr. T. E. Reaves Mr. C. K. McCoy Mr. J. W. Yelverton Mr. A. R. Smith Mr. Tom Houghton Mr. M. D. Hunt j
File 4
4 i
1 J
4 I
1 Y
4 l
1 f
r
,,,,. --. -,, --,-..--.~
,-