Discusses 800415 Discovery of Loss of Level Indication on Id Steam Generator Snubber Reservoir.Caused by Loss of Coupling of Ultrasonic Detector.Transducer Repair Will Be Postponed. IE Resident Inspector,J Kahler,Concurs
ML19323F012
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/17/1980
From: Wandke N
COMMONWEALTH EDISON CO.
To: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
NUDOCS 8005280369
Download: ML19323F012 (2)


Text

'

-.w.-.

$77-Jq f A

Commonwealth Edison SO ~' fcf

~'

Zion Gonerating Station Shiloh Blvd. 8 Lake Michigan

[/d Zion, Illinois 60099 Telephone 312/746-2084 April 17, 1980 Mr. James G. Keppler Regional Director Directorate of Regulatory Operations Region III U.S.

Nuclear Regulatory Commission Glenn Ellyn, Illinois 60137 RE:

Letter, Keppler to Reed, Dated 1-17-80

Dear Sir:

On April 15, 1980, we performed weekly surveillance of Unit 1 steam generator snubber reservoir levels.

During this surveillance, we discovered a loss of level indica-tion on 1D steam generator snubber reservoir, due to loss of coupling of the ultrasonic detector.

In order to recouple the detector, we must enter the 1D steam generator snubber area, where the estimated radia-tion levels are 6 rem /hr. beta-gamma, and 100 mrem /hr.

neutron at fril power.

Consistent with ALARA, it will be aduce Unit 1 reactor power'1evel signifi-necessary tt z

cantly to make this repair.

We wish to postpone the 1D steam generator snubber level transducer repair, however, we will not go beyond a second subsequent surveillance period.

This postponement is due to the following circumstances:

1)

The 1D S/G enubber reservoir' level has remained constant at approximately 7 inches, showing no sign of leakage since mid-February, 1980.

2)

Unit 2 reactor power will be reduced significantly this weekend to perform turbine stop valve testing required by the NRC.

3)

Our ability to dilute Units 1 and 2 is limited by lack of holdup tank capacity.

A large dilution volume will be required in Unit 2, because it is late in reactor core life.

O SPR 2 s tsag 80 0528 tCT6%

m o

.;.6.,

J. Kohler, Zion NRC Resident Inspector, concurs with this plan of action.

Sincerely yours, l

Yh Y 2

=

N. E. Wandke Zion Station Superintendent JW/kjk s