ML19323E807
| ML19323E807 | |
| Person / Time | |
|---|---|
| Site: | 07001113 |
| Issue date: | 05/13/1980 |
| From: | Gillespie F, Hodges J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | |
| Shared Package | |
| ML19323E798 | List: |
| References | |
| 70-1113-80-06, 70-1113-80-6, NUDOCS 8005270260 | |
| Download: ML19323E807 (1) | |
Text
yfJ n"'L r "'*" r p " - ;7 3
,. aeg CG TTA!.'i3 2/4 - w af..;,7;3H
/
4 UNITED STATES j
NUCLEAR REGULATORY COMMISSION
[,}
e REGION 11 r
~'
o 101 MARIETTA ST N.W., SulTE 3100 ATLANTA. GEORGIA 30303 MAY 141980 Report No. 70-01113/80-6 Docket No. 70-01113 License No. SNM-1097 Safeguards Group:
3 Liceasee: General Electric Company Wilmington, NC 28401 Tacility Name:
General Electric Company, Wilmington Inspection at: Wilmington, NC Inspection conducted: April 21-25, 1980 Type of Inspection: Unan ou ed Material Control and Accounting
~
/ p d
I // [6 Inspector:
p.'W. H g s, S dgf ds Auditor ate wh
_f g6 Approved by:
/
F. P. Gillespie, Seyf.lon Chief, MC&A Dt Safeguards Branch Inspection Summary Areas Inspected. Records and Reports. The inspection involved 36 inspector hours onsite by on-NRC inspector and was begun during the regular hours.
Results: The Licensee was found to be in compliance with NRC requirements in the one area examined.
S-7:_30
_ 57 Cc y Copies
- b.
T 3-c
- t o he 6 0 05 27 0Mb I:
arb '
i c
.-