f%
p
- 'g UNITED STATES g
NUCLEAR REGULATORY COMMISSION Q -
r.
p:j WASHINGTON, D. C. 20555 N%
- [.?
w**.**#
THE CONNECTICUT LIGHT AND POWER COMPANY, THE HARTFORD ELECTRIC LIGHT COMPANY, WESTERN MASSACHUSETTS ELECTRIC COMPANY, AND NORTHEAST NUCLEAR ENERGY COMPANY DOCKET NO. 50-336 MILLSTONE NUCLEAR POWER STATION, UNIT N0.,_2_
AMENDMENT TO. FACILITY OPERATING LICENSE Amendment No. 57 License No. DPR-65 1.
The Nuclear Regulatory Commission (the Commission) has found that:
A.
The application for amendment by The Connecticut Light and Power Company, The Hartford Electric Light Company, Western Massachusetts Electric Company and Northeast Nuclear Energy Company (the licensees) dated January 3,1980, as supplemented February 4,1980, complies with the standar'ds and requirements of the Atomic Energy Act of 1954, as amended (the Act) and the Comission's rules and regulations set forth in 10 CFR Chapter I; B.
The [acility will operate in conformity with the application, the provisions of the Act, and the rules and regulations of the Commission; C.
There is reasonable assurance (i) that the activities authorized by this amendment can be conducted without endangering the health and safety of the public, and (ii) that such activities will be conducted in compliance with the Comission's regulations; D.
The issuance of this amendment will not be inimical to the common defense and security or to the health and safety of the 'public; and E.
The issuance of this amendment is in accordance with 10 CFR Part 51 of the Commission's regulations and all applicable requirements have been satisfied.
soosseo 03/
2.
Accordingly, the license is amended by changes to the Technical Specifications as indicated in the attachment to this license amendment, and paragraph 2.C.(2) of Facility Operating License No. DPR-65 is hereby amended to read as follows:
(2) Technical Specifications The Technical Specifications contained in Appendices A and B, as revised through Amendment No. 57, are hereby incorpo. rated in the license.
The licens.ees shall operate the facility in accordance with the Technical. Specifications.
3.
This amendment is effective as of the date of its issuance.
FOR THE NUCLEAR REGULATORY COMMISSION jdlY Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactor's
Attachment:
Changes to the Technical Specifications Date of Issuance: May 13, 1980 m
ATTACHMEhT TO LICENSE AMENDMENT NO. 57 FACILITY OPERATING LICENSE NO. DPR-65 DOCKET NO. 50-336 Replace the following pages of the Appendt: "A" Tecnnical Specifications with the enclosed pages.
The revised pa;,es are identified by Amendment number and contain vertical lines indicating the area of change. The corresponding overleaf pages are also p:ovided to maintain document completeness.
Pages 3/4 3-44 3/4 3-45 8
h*.
. ~ - -..
1 INSTRUMENTATION FIRE DETECTION INSTRUMENTATION LIMITING CONDITION FOR OPERATION 3.3.3.7 As a minimum, the fire detection instrumenta' tion for each fire
~
detection zone shown in Table.3.3-10 shall be OPERl8LE.
APPLICABILITY: Whenever equipment in that fire detection zone is required to be OP.ERABLE.
ACTION:'
With one or more of the fire detection instrument (s) shown in Table 3.3-10 inoperable:
i.
Within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> establish a fire watch patrol to inspect the a.
zone (s) with the inoperable instrument (s) at least once per hour, and b.
Restore the inoperable instrument (s) to OPERABLE status within 14 days or, in lieu of any other report required by Spect-fication 6.9.1, prepare and submit a Special Report to the Commission pursuant to Specification 6.9.2 within the next 30 days outlining the action taken, the cause of the inoperability and the plans and schedule for restoring the instrument (s) to OPERABLE status.
\\
The provisions of Specifications 3.0.3 and 3.0.4 are not c.
applicable.
SURVEILLANCE REQUIREMENTS 4.3.3.7.1 Each of the above required fire detection instruments shall be demonstrated OPERABLE at least once per 6 mo'nths by performanca of a CHANNEL FUNCTIONAL TEST.
4.3.3.7.2 The circuits between the above required. detection instruments and the control room shall be demonstrated OPERABLE at least once per 31 days per approved procedures.
l MILLSTONE - UNIT 2 3/4 3-43 Amendment No. 35
'l I
TABLE'3.3-10 P
c-4 FIRE DETECTION INSTRUMENTS o
4 Heat Smoke Minimum Minimum Total Mo.
Channels Total No.
Channels Q
Instrument Location (Zone) of Channels Operable
. of Channels Operable' y
I 1
containment
,,i.
l r
I' 2 1
West Penetration (,41)J East Penetration 37 l
l 2
1 1
1 1
2.
Control Room Vent Duct (42) Z-2 1-1 Control Room Vent Duct (2) Z-1 w
l i.
{
3.
Cable Vaults & Areas 5
.4 l 16 12 AuxBldgCableVault(25'S(10)(21)
. ;9 7
5 25')
Turbine Bldg Cable Vault (i,45,) (21)J (24)
,4 3
,' 8 6
1 Turbine B1dg Cable Vault t
Lunch Room Cable Chase Area (36'6" 4
3
(
4.
4.16 & 6.9 KV Switchgear Room (54'6") (40) i 4
3 (18) 4.16 KV Switchgear Room (31'6")(36'6") (28) 2 1
i
=
k 480 V Aux Bldg Switchgear Room 2
1 480 V Turbine Bldg Switchgear Room (36'6") (18) 3 2
3 WestDCEquipmentRoom(38)
'4 3
x P
East DC Equipment Room (38) i 3
... =
~
o 9
h 9
1 j
l l
3 h
TABLE 3.3-10 (Continued)
E!
Mi FIRE DETECTION INSTRUMENTS e5 Heat Smoke Minimum Minimum h)
Total No.
Channels Total No.
Channels Instrument t~
tion (Zone) of Channels Operable of Channels 0 erable_
1 5.
Battery Rooms West Battery Room (14'6") (39) 1 1
EastBatteryRoom(14'6")(39) 2 1
R 6.
Electrit:a1 Penetration Rooms Y
^
East (14'6")(20) 3 2
West (14'6") (17) 2 1
7.
Diesel Generators Diesel 1221 (30) 1 1
{-
Diesel 1321 (32) 1 1
- s B
8.
Main Exhaust Equipment Room e-
,5 Room (EL38'6")(5) b I
W e
.