ML19323E143

From kanterella
Jump to navigation Jump to search
Revised Notification of 800429 Meeting W/Util in Bethesda,Md to Discuss Seismic Design Reanalysis,Postulated Flooding & Possible Applicability of Probabilistic Risk Assessment Technique.Forwards Tentative Agenda
ML19323E143
Person / Time
Site: Yankee Rowe
Issue date: 04/23/1980
From: Oconnor P
Office of Nuclear Reactor Regulation
To: Ziemann D
Office of Nuclear Reactor Regulation
References
TASK-02-03.B, TASK-03-06, TASK-2-3.B, TASK-3-6, TASK-RR NUDOCS 8005230055
Download: ML19323E143 (2)


Text

_ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _.

(

. ep2mi.g%

4 UNITED STATES CORRECTION

[

3 NUCLEAR REGULATORY COMMISSION April 23, 1980 v.

y mAssimron. o. c.20sss p'

April 14, 1980 Docketh..a. 52-29 E110RA9DCM FOR:

Dennis L. Zienann, Chief Operating Rea: tors Branch #2, DOR FR0!!:

Paul W. O'Contor, SEPM Operating Reactors Branch #2, D0R SU3 JECT:

FORTHCOMI'IG METIN3 WITH YAtiKEE ATOMIC ELECTRIC COMPANY (YAECo)

Da:e ard Time:

Tuesday April 29,198C 8:30 AM Locatica:

Room P-503 Phillips Builting 7920 florfolk lenue Bethesda, Maryland

Purpose:

To discuss Yar'<ee-Rowe Seismic Design reanalysis, postulated flooding associated with the probable maximum precipitation and to discuss t.he possible applicability of probabilistic risk assessment tecqnique for Yankee.

See tentative acenda attached.

Partici:a 1ts:

ilRC P. W. O'Ccnnor, D. Crutchfield, L. Reitter, R. Jackson, G I aar, F. Burger, T. Quay, T. Cheng, J. Greeves, C. Hoffma W. Bivins.

D. Allisor., H. Levin, F. Rowsoae, R. Benero, and G.yer, lev.

Sta YAECo.

J. Kay, D. Vanferburg, J. Hoffman, R. McPherson, J. Stacey Paul W. O'Connor, SEPM Operating Reactors Branch #2 Division of Operating Reactors 8006230055

TEIM TIVE AGENDA I.

Opening Remarks II: Seisr.ic A. Plant Evaluation 1.

Schedule 2.

Implementation of Correctise Measures.

3.

Presently Planned Correctise Measures.

B. Site 1.

Selection of Design Ea.-t.5qtake 2.

Site Response Soe: trol Shape 3.

Conservatism /Probabelistic Assessment III.

Flood Analysis A. Storm Transposition B. Spillway Adequacy C. Yankee Model IV.

Probabolistic Risk Assessnent

-_ L

C C.-

DISTRIEUTICN Docket NRC PDE Local FDR OR3 Retding NRR Retding H. Den'.on E. Case D. Eisenhut RVollmer T. Car.er W. Russell DLZierrann HSaith P0'Contor NRO Pa-ticipa.nts OELD OI&E (I) 053 IISIC

('TE?X 7 ACRS'C6)

Progran Su; pert Branch C. Tnaler Re:ept'onist - Phillips Buildin; 1

m

...