ML19323D958

From kanterella
Jump to navigation Jump to search
Forwards Revised LER 80-053/03T-1
Date released: 12/03/2019 Download: ML19323D958


Revised LER 80-053/03T-1:on 800505,while Comsip,Inc Was Defect Testing,Discharge Valve to Analyzer Sample Pump Isolated,Which Deadheaded Pump.Caused by Design Defect. Bypass Will Be Installed Around Pump
ML19323D960
Person / Time
Site: Hatch 
Issue date: 05/19/1980
From: Coggin C
GEORGIA POWER CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323D960 (2)
Forwards Revised LER 80-053/03T-1
ML19323D957
Person / Time
Site: Hatch 
Issue date: 05/19/1980
From: Manry M
GEORGIA POWER CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323D957 (1)