fN.e,,M...N%.e.m o.
.,,,c.
g May 13,1980 M lm e w e,e...enTK#L*"
EF2-48,998 a.
Mr. James G. Keppler Regional Director Directorate of Regulatory Operations Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Edison Cover Letter for Response to NRC Report No. 50-341/
80-02.
Dear Mr. Keppler:
tie are recalling our cover letter (EF2-48,580 dated April 22, 1980) to our response to NRC inspection report No. 50-341/80-02. Please replace this let a with the attached letter (EF2-48,997) dated May 13, 1980.
Very truly yours, bdw%N EH/ HAW /pn A' t.,Fr.
cc:
Victor Stello, Jr., Director 0 ice of Inspection and Enforcement Division of Reactor Inspection Programs U.S. Nuclear Regulatory Comission liashington D.C.
20555 Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U. S. Nuclear Regulatory Comission Region III 799 Roosevelt Road Glen Ellyn, IL 6')137
\\
Boosuogcf
a
}
s =.m: =assac..,
om m
May 13,1980 Edison m.. e2e.....me EF2-48,997 m a--
Mr. James G. Keppler, Director U.S. Nuclear Regulatory Commission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137
Subject:
Noncompliance at Enrico Fermi Unit 2 Construction Site.
Dear Mr. Keppler:
This letter responds to the infractions contained in your IE Report 50-341/80-02 resulting from the construction activit.ies inspection conducted by Messrs. G. A. Phillip, I.T. Yin and C.M. Erb on January 21-23 and February 11-12, 1980. We requested and were granted a waiver to extend the response period.
The cited infraction menticned in your report is discussed in this reply as required by Section 2.201 of the NRC's " Rules of Practice",
Part 2, Title 10, Code of Federal Regulations. The unresolved items are being acted upon. We will be prepared to report in detail on our progress and corrective action on those items to your inspectors on their next visit.
The enclosed response is arranged to the secuence of items cited in the body of your report. The finding and section numbers are refer-enced.
We trust this letter satisfactorily answers the concerns raised in your report. We shall be glad to discuss any further concerns you may have.
Very truly yours, b.m 9
6 i
EH/ HAW /pn Enclosure cc: Mr. G. Fiorelli, Chief Reactor Construction and Engineering Support Branch U.S. Nuclear Regulatory Connission Region III 799 Roosevelt Road Glen Ellyn, Illinois 60137 Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement Division of Reactor Inspection Programs U. S. Nuclear Regulatory Commission Washington, D.C.
20555 8005210 9 3