611 RYAN Pt.AZA oRtVE. Sulrf 1000 v
4Ruscrou, runs 7 son FEB 171920 Dockat No. 99900361/79-02 G. Dikkars and Company N.7.
Atta:
Mr. C. S. Craig Chief Exact:1ve Industriestraat 15, P. 3 Box 12 7550 AA Hengelo, Province of overijssel The Netherlands Gentlemen:
. Thank you for your letter of January 18, 1980, in response to our letter dated December 10, 1979. As a result of our review, we find that additional infornation is needed on the following items in the Notice of Deviation:
C.
This finding was written relative to procurenant requirements for Conare 49 electrodes, Charge No. 6237 '3, which were noted during the inspection as having been used for repair welding of a bonnet, Charge No. 22.35.8 S/N 1.
Wa trust that this information is sufficient for you now to provide the requested correceive action e ttures and steps to prevent recurrence.
D.
Please describe the method used to document re-instruction of QA Engineers in order to provide an auditable record of corrective action.
~
Please describe the specific actions that have been taken or are E.
planned to be taken, to assure that QC Inspectors are conversant with.
the responsibilities assigned to them by the manufacturing process control systen contained in the QA Manual Please provide this additional information within twenty 00) days in order that we may complete our review in a cinely nanner.
Sincerely, C,
i A g
b6 4 6.- UM 9
w Ulcu Potapovs, Chiet Vendor Inspection 3 ranch.